Customer |
Project |
Scope of services of NIIK |
Year |
|
Korund-Cyan, Dzerzhinsk, Russia |
Technical modernization of the cooling water unit (Sodium cyanide production unit, building В50, second line) |
Development of basic and detailed design |
Under development |
|
Sodium cyanide production unit technical renovation and construction (second line) | Development of detailed design | 2016 | ||
Alcali storage unit moderni-zation (sodium cyanide production unit, building B80, second line) | Development of basic and detailed design | 2016 | ||
Establishment of sodium cyanide production unit with capacity of 80000 TPD | Development of detailed design of the second line, development of basic design (authority package of the first and second line) and detailed design of the first line with basic project of “EPC”, Germany. Development of Industrial Safety Declaration. | 2010-2012 |