References on melamine

Video Видео
Our Listings

Projects of Previous Years

Customer

Project

Scope of services of NIIK

Year

Metafrax, Gubakha, Russia Ammonia-urea- melamine complex Reviewing options for site location, development of declaration of in-tention, preenvironmental impact assessment, participation in public hearings, detail design for site prep-aration, adaptation of Casale basic engineering package to Russian norms and regulations, authority package development, develop-ment of basic design for prilling tower , raw water treatment unit (including water intake unit) and waste water treatment system, equipment procurement for prilling tower construction. 2015 - Under development 
NevAzot (EuroChem), Nevinnomyssk, Russia Technical inspection (urea plant № 2, urea units 1-3)
Collecting and analysis of technological and analytical data, preparing  inspection  report,  development of engineering solutions  on modernization aimed at  reducing energy consumption  and increasing capacity,    feasibility study  on installation of CO2 compressor .
2015
NevAzot  (EuroChem),  Nevinnomyssk,
Russia
Construction of melamine unit by technology  of «LURGI» AG, Germany Basic design based on foreign licensor’s basic engineering package, detailed design of civil part, field supervision

2007 – 2011
TogliattiAzot,
Togliatti, Russia
Technical upgrading of urea unit with integration of melamine unit Basic design, feasibility study 2007 – 2008
Acron, Veliky Novgorod,
Russia
Preliminary work for melamine project implementation Feasibility study, environmental    impact investigation 2006 – 2007
Kirovakan chemical complex,
Kirovakan
Melamine production unit   (urea as a starting material, capacity  10 thousand  TPY) 1973
Melamine production unit   (dicyandiamide as a starting material), capacity   6  thousand  TPY    1962