REFERENCE LIST NIIK (R&D Institute of Urea)October 2016 | ||||
Customer |
Project |
Scope of services of NIIK |
Year | |
Production of urea, melamine and other nitrogen chemical products | ||||
Volzhskiy Orgsintez- Volzhsky, Volgograd region, Russia | Sodium dimetilditiocarbamate production unit, capacity 15000 tons per year | Development of basic and detailed design | Under development | |
Azot, Kemerovo, Russia | UAN production unit | Feasibility study | Under development | |
Teсhnoleasing, Moscow, Russia | Methanol production unit (Skovorodino, Amur region) | Investment feasibility study | Under development | |
Novgorodsky GIAP, Veliky Novgorod, Russia | Sulfuric acid production unit; Wet-process phosphoric acid production unit; Monoammonium phosphate (MAP) and\or diammonium phosphate (DAP) production unit | Feasibility study | 2016 | |
Novoroscement Novorossiysk, Russia | Methanol production unit | Reviewing options for unit location at Novoroscement site | 2016 | |
ShchekinoAzot, Shchekino, Russia | Methanol production unit | Reviewing options for unit location at ammonia, urea and supfuric acid production complex site | 2016 | |
Metafrax, Gubakha, Russia | Ammonia-urea-melamine complex | Reviewing options for site location, development of declaration of intention, preenvironmental impact assessment, participation in public hearings, detail design for site preparation, adaptation of Casale basic engineering package to Russian norms and regulations, authority package development, development of basic design for prilling tower , raw water treatment unit (including water intake unit) and waste water treatment system, equipment procurement for prilling tower construction. | 2015 - Under development | |
OJSC MMC Norilsk Nickel, Moscow, Russia | Urea production complex (Dudinka site) | Feasibility study | 2016 | |
LLC Zhilevskaya kremniorganika, Sitne-shchelkanovo, Moscow region, Russia | Ammonia-urea complex | Feasibility study | 2016 | |
KuibyshevAzot, Togliatti, Russia | Technical modernization of urea production plant №4 | Basic and detail design documentation development, equipment procurement, field supervision | 2016 | |
Rashtriya Chemicals and Fertilizers Ltd., Mumbai, India | Trombay V urea plant modernization | Procurement & installation of a Set of Internal Devices comprising Vortex Mixer and Conversion Booster for urea synthesis reactor at RCF Trombay V Urea plant | 2015 - 2016 | |
Haldor Topsoe (HTAS) |
Ammonia unit modernization aimed at capacity increase up to 2000 TPD at Uralchem site, Kirovo-Chepetsk, Kirov region |
1) Adaptation of HTAS design basis with the requirements of Russian Federation
2) Development of Authority Package including project's costs estimation 3) CO2 removal engineering package based on HTAS specification. |
Under development | |
Baltic Gas Chemical Company, Saint-Petersburg, Russia |
Baltic methanol production plant |
1) Adaptation of MHI basic engineering documentation with the requirements of Russian Federation;
2) Authority Package development; 3) Acting as general design contractor responsible for providing technical specifications, design data, getting all necessary permits and authorizations including final building permit. 4) Acting for Customer at supervisory and expert bodies. |
Under development | |
UralChemMinudobreniya, Perm, Russia |
Urea production unit revamp, new prilling tower construction |
Basic and detailed design documentation development for urea production unit revamp based on Stamicarbon basic design; engineering documentation package development for the new prilling tower (NIIK technology) |
Under development | |
ShchekinoAzot, Shchekino, Russia |
Ammonia-urea complex |
Development of declaration of intention |
2016 | |
Sulphuric acid production unit construction |
Site location estimation |
2015 | ||
Casale SA, Switzerland |
Urea production unit and new prilling tower construction (capacity 2200 TPD) at TogliattyAzot site |
1) Authority package development for urea production based on the licensor’s basic design, including adaptation to Russian norms and regulations.
2) Authority package for prilling tower and handling system to process urea. 3) Engineering surveying and inspection for steel elements and structures. 4) Detailed design development 5) Packaged supply of equipment for prilling tower and new urea reactor support facilities. |
2015 - 2016 | |
Grodno Azot, Grodno, Belarus |
Nitrogen complex (ammonia-urea-hydrogen) |
Feasibility study |
2015 | |
EuroChem, NAK Azot, Novomoskovsk, Russia |
Revamp of urea unit 2 (gas vent elimination) |
Technology development, basic and detail design, equipment procurement |
2009, 2015 | |
KuibyshevAzot, Togliatti, Russia |
Urea production unit |
Investment feasibility studies |
2014 | |
PhosAgro-Cherepovets, Cherepovets, Russia |
Urea granulation unit, capacity 1500 TPD |
Development of basic and detailed design, feasibility studies (environmental impact assessment), field supervision |
2014-2015 | |
Urea production plant (section № 2) technical modernization with capacity increase to 1600 TPD |
Development of basic and detailed design, field supervision, technical
inspection for equipment manufacturing |
2014-2016 | ||
Tulagiprohim, Tula, Russia |
Ammonia production unit, liquid ammonia storage unit for Ammonia Kingisepp Plant |
Basic design development for ammonia production plant: central control station, service- and- office building; for liquid ammonia storage facility: central station, laboratory, service- and- office building. |
2014 | |
Sibmetahim, Tomsk, Russia |
Chemicals manufacturing unit |
Expert economic evaluation including solution development for two options: creating ammonia-urea-melamine complex and production of synthetic liquid fuel |
2014 | |
CREON-ENERGY, Moscow, Russia |
Methanol production |
Investment feasibility studies |
2014 | |
PhosAgro, Cherepovets, Russia |
Granulated urea production unit, gas turbine power station |
Pre-feasibility study (assessment of dissipation and air quality analyses) |
2014 | |
Rosstroy, Novocherkassk, Russia |
Ammonia-urea complex |
Feasibility study |
2014 | |
EuroChem, NAK Azot, Novomoskovsk, Russia
|
Technical modernization of urea plant № 2 with capacity increase to 1500 TPD |
Development of basic and detailed design, equipment procurement, construction technical support |
2013-2016 | |
UAN production unit on the basis of urea production plant № 2 (capacity 1200 TPD) |
Development of basic and detailed design |
2013-2014 | ||
32,5% urea solution production unit (capacity 100000 TPY) including urea solution treatment unit on the basis of urea plant № 2 evaporation unit |
Development of basic and detailed design |
2013-2014 | ||
Technical modernization of urea plant № 3 (second line) with capacity increase to 1450 TPD |
Development of basic and detailed design, construction technical support |
2013-2016 | ||
PhosAgro, Cherepovets, Russia |
Ammonia production unit AM-3 (capacity 2200 TPD) |
Development of basic and detailed design (сivil engineering stage), environmental impact assessment (front-end engineering stage), harmonization of the documentation with the requirements of Russian Federation, field supervision |
2013-2015 | |
Turn-key realization of new analytical laboratory (ammonia
production plant) |
2016 | |||
EuroChem, NevAzot , Nevinnomyssk, Russia |
Commercial grade aqua ammonia production unit (plant №11) |
Basic and detailed design |
2013-2014 | |
National Chemical Company, Russia |
Gaz -chemical complex (Kozmino, Primorsky territory) |
Declaration of intention development; Environmental Impact Assessment (front-end engineering stage); Declaration compliance with local codes, authority permits and approval; Participation in public hearings, customer support |
2013 | |
Nagarjuna Fertilizers and Chemicals Limited, India |
Urea synthesis unit modernization |
Vortex mixer installation into urea synthesis reactor, on-site supervision |
2013 | |
ICM, Saint-Petersburg, Russia |
Ammonia – granulated urea complex based on natural gas, including utility corridor to port |
Declaration of intention development; BE and FEED stages technical support (harmonization of the documentation developed by foreign companies with the requirements of Russian Federation), environmental impact investigation (design basis stage), development of basic and detailed design |
2012-2014 | |
Gasprom Neftehim Salavat, Salavat, Russia |
Ammonia emission reduction (absorption/desorption units, urea plant № 24) |
Technological inspection of urea plant, development of engineering solutions for the reduction of ammonia emission at existing absorption\desorption units, capital cost evaluation. |
2012 | |
Minudobreniya, Rossosh, Russia |
Grass-root complex ammonia-urea |
Feasibility study |
2012 | |
Acron, Veliky Novgorod, Russia |
Urea production units (1-4) revamping aimed to capacity increase up to 2000 TPD and feedstock / energy saving |
Development of basic and detailed
design, basic documentation
development for «Structured system for monitoring and control of building» section, field
supervision, equipment procurement, technical supervision of
design and assembly works. |
2012-2014 | |
EuroChem, NAK Azot, Novomoskovsk, Russia |
Technological inspection (urea plant №3, second line) aimed at capacity increase to 1600 t/d |
Technological inspection |
2012 | |
EuroChem, NAK Azot, Novomoskovsk, Russia |
Urea production unit revamping (off gases recovery sections addition (urea plant № 2) |
Procurement of internal devices, first stage distillation columns (3 items), tools package for absorber revamping pos. K-31 |
2012-2013 | |
Ostchem Group, Azot, Cherkassy, Ukraine |
Design and procurement of HP stripper pos. E-201 with capacity increase up to 1500 tpd (urea plants M-2) |
HP stripper detail design documentation
development, technical supervision,
equipment design and
procurement |
2011-2012 | |
Azot, Kemerovo, Russia |
Urea production unit revamping with high speed drum granulator installation |
Development of basic and detailed design, equipment procurement |
2011-2013 | |
KazAzot, Aktau, Kazakhstan |
Ammonia nitrate production unit modernization: HSDG for ammonia nitrate manufacturing |
Technical solution development, detail design documentation development, equipment procurement |
2011-2012 | |
EuroChem, NAK Azot Novomoskovsk, Russia |
Multifunctional HSDG unit for manufacturing granulated and complex urea with additives and deicer (urea plant №2) |
Technical solution development |
2011 | |
Kuibyshev Azot, Togliatti, Russia |
Acid ammonia recovery unit downstream urea unit absorption tower. |
Development of basic and detailed design |
2011-2012 | |
EuroChem, NAK Azot Novomoskovsk, Russia |
Technical modernization of evaporation unit № 5 for urea production unit №2 (capacity 1000 TPD) |
Development of basic and detailed design |
2011-2012 | |
EuroChem, NAK Azot Novomoskovsk, Russia |
Unit for manufacturing solution containing 32.5% by weight of urea for purification of exhaust gases with overall capacity of 50-100 mt annually. |
Urea units inspection, development of front -end engineering design considering the construction of a new unit |
2011 | |
«Ammonia-Methanol-Urea» complex» (Tatarstan, Russia) |
| |||
Mitsubishi Heavy Industries, Japan |
|
Architectural and civil documentation of urea production units and adjoining processing facilities |
2010-2015 | |
Ammoni, Mendeleevsk, Russia |
| Harmonization of the documentation
developed by foreign companies with the requirements of Russian Federation,
equipment procurement,
equipment certification (including foreign contractors equipment) |
2010-2015 | |
Ammoni, Mendeleevsk, Russia |
«Ammonia- Methanol- Urea» complex, Tatarstan, Russia Off- plant facilities construction (ammonia, urea, methanol, acid, alkalis storage units; loading/ unloading racks; waste-treatment facilities; demineralized water units, water recycling units, service- and- office buildings, substations, high- voltage transmission line (110 kW), automatic process control system, railroad, flare devices etc ) |
Off plant facilities:
turnkey construction projects including
engineering, equipment procurement, construction and erection works, commissioning
operations, operational documentation
development, supervision etc. |
2010-2015 | |
Acron, Veliky Novgorod, Russia |
Implementation of computer process simulator for personal training and knowledge assessment |
Computer-generated technological simulator for urea production assembly №5 |
2011-2012 | |
Acron, Veliky Novgorod, Russia |
Evaporation system for urea production unit and prilling tower modernization with capacity increase |
Development of detail
design documentation, equipment procurement, field supervision |
2011-2013 | |
ShchekinoAzot, Shchekino, Russia |
Ammonia-urea complex |
Feasibility study |
2011 | |
Maxam-Chirchik, Chirchik, Uzbekistan |
Modernization and technical upgrading of urea unit |
Development of basic and detailed design, equipment procurement, field and contract supervision, commissioning works and guarantee tests |
2010-2012 | |
UralChem, Azot, Berezniki, Russia |
Urea synthesis reactor modernization |
Internals procurement, technical supervision of assembly |
2010 | |
Acron, Veliky Novgorod, Russia |
Technical inspection of urea plant aimed at capacity increase and energy saving |
Technical inspection |
2010-2011 | |
EuroChem, NevAzot, Nevinnomyssk, Russia |
Modernization of unit №2 (urea plant №2) |
Development of basic and detailed design |
2010-2011 | |
EuroChem,NevAzot, Nevinnomyssk, Russia |
Implementation of computer process simulator for personnel training and knowledge assessment |
Development of computer process simulator for expansion of urea unit |
2010 – 2011 | |
PhosAgro, Cherepovets, Russia |
Urea plant production unit with capacity 1500 TPD, procured by “Chemoproject” (Czech Republic) |
Development of basic and detailed design for integration of urea plant with the existing utilities infrastructure, field supervision |
2010-2012 | |
Design Institute «Salavatgasonephte-himproect», Salavat, Republic of Bashkortostan, Russia |
Prilling tower for urea plant №24 |
Development of detailed design based on basic engineering package of “TEC”, Japan, field supervision |
2010- 2011 | |
PhosAgro, Cherepovets, Russia |
Revamp of urea synthesis evaporation unit |
Development of basic and detailed design |
2010 | |
PhosAgro, Cherepovets, Russia |
Implementation of computer process simulator for personnel training and knowledge assessment |
Hard and software procurement |
2010-2011 | |
Kuibyshev Azot, Togliatti, Russia | Prilling tower revamp (urea plant №4) | Detailed design | 2010 | |
Gasprom nephtehim Salavat, Salavat, Russia | Prilling towers revamp (urea plant №24) | Basic and detailed design, packaged equipment procurement | 2009-2010 | |
KuibyshevAzot, Togliatti, Russia |
Revamp of evaporation unit (urea plant №1, unit № 4) |
Development of detailed design |
2010 | |
Azot, Kemerovo, Russia |
Feasibility study for
urea plant revamp, new project
estimation |
Inspection of urea
plant, feasibility study of
revamping |
2009 | |
Yokogawa Electric, Moscow |
Development of control
system for CO2 compressor with arrangement of a room for a set of
technical devices at NAK
“Azot" |
Development of detailed design |
2009 | |
Acron, Veliky Novgorod, Russia |
Design of granulated urea unit based on Rotoform technology |
Engineering |
2009 | |
PhosAgro AG - Cherepovetsky Azot, Cherepovets, Russia |
Urea production unit with capacity 1500 TPD, procured by “Chemoproject” (Czech Republic) |
Development of basic design based on a foreign licensor basic package |
2008 – 2010 | |
Ammoni, Mendeleevsk, Russia |
Chemical complex: ammonia- methanol – urea |
Development of basic design for urea plant. |
2008 – 2009 | |
PhosAgro Cherepovets, Russia | Prilling tower for urea production (capacity of 1500 TPD) | Basic and detailed design, equipment procurement | 2008-2012 | |
Togliattiazot, Togliatti, Samara Russia | Prilling tower modernization (urea plant) | Detailed design | 2008-2009 | |
Ostchem Group, Azot, Cherkassy, Ukraine |
Revamp of urea plant М-2 |
Feasibility study |
2008 | |
Acron, Veliky Novgorod, Russia |
Urea unit revamp with capacity increase and energy saving |
Basic and detailed design |
2008 | |
UralChem, Voskresensk Mineral Fertilizers, Voskresensk, Russia |
Urea production unit with capacity 600 (1200) TPD |
Basic design |
2008 | |
Acron, Veliky Novgorod, Russia | Urea unit №5 on the basis of relocated unit | Basic design, feasibility study, detailed design, equipment design and procurement, 3D model development and installation, field supervision | 2007 – 2011 | |
EuroChem, NevAzot, Nevinnomyssk, Russia | Prilling tower revamp (urea unit, plant 2A) | Detailed design, design documentation, field supervision | 2007-2009 | |
Voskresensk Mineral Fertilizers, Voskresensk, Russia |
Urea production unit with capacity 600 TPD |
Feasibility study |
2007 | |
Grodno Azot, Grodno, Belarus |
Revamp of urea plant №4 with capacity increase |
Feasibility study, architectural design, detailed design, building project, field supervision |
2007 – 2012 | |
EuroChem, NAK Azot, Novomoskovsk, Russia |
Urea production unit on the basis of relocatable unit with capacity increase and energy saving |
Basic design, feasibility study, detailed design |
2007– 2010 | |
EuroChem, NAK Azot, Novomoskovsk, Russia |
Revamp of urea plant №3 with capacity increase to 2000 TPD |
Authority engineering and detailed design based on «Urea Casale» basic
design, equipment procurement,
field supervision |
2007 – 2010 | |
Ostchem Group, Severodonetsk Azot Association, Severodonetsk, Ukraine |
Development of basic design for urea unit revamp with capacity increase from 1200 up to 1500 TPD |
Basic and detailed design, equipment procurement, field supervision |
2007 – 2010 | |
EuroChem, NevAzot, Nevinnomyssk, Russia |
Urea evaporation unit for melamine plant |
FEED- package, detailed design, equipment procurement, field supervision |
2008 – 2010 | |
EuroChem, NevAzot, Nevinnomyssk, Russia |
Melamine unit by technology of «LURGI» AG, Germany |
Basic design based on foreign licensor’s basic engineering package, detailed design of civil part, field supervision |
2007 – 2011 | |
TogliattiAzot, Togliatti, Russia |
Technical upgrading of urea unit with integration of melamine unit |
Basic design, feasibility study |
2007 – 2008 | |
KuibyshevAzot, Togliatti, Russia |
Revamp of urea unit with capacity increase |
Process improvement. Feasibility study, basic and detailed design, equipment
procurement, contract supervision, guarantee testing |
2007 – 2008 | |
Gasprom nephtehim Salavat, Salavat, Russia | Basic design for urea prilling tower | Basic and detailed design, field supervision | 2007-2008 | |
Ostchem Group, Severodonetsk Azot Association, Severodonetsk, Ukraine |
Development of basic design for urea unit revamp with capacity increase from 1000 up to 1200 TPD |
Basic design, detailed design, equipment procurement, field supervision, guarantee testing |
2006-2007 | |
AB Achema, Lithuania |
Urea production unit based on relocatable equipment |
Detailed design, field supervision, development of operational manuals |
2006-2008 | |
PhosAgro, Cherepovets, Russia |
Revamping of distillation unit with capacity increase (urea production plant) |
Detailed design, equipment procurement, contract
supervision |
2007 | |
EuroChem, NAK Azot, Novomoskovsk, Russia |
Implementation of computer process simulator for personnel training and knowledge assessment |
Hard- and software complex |
2006-2008 | |
Ostchem Group, Azot, Cherkassy, Ukraine |
Revamping of urea plant М-6 |
Authority package and detailed design with basic project of «Urea Casale», field supervision |
2006-2010 | |
Gasprom nephtehim Salavat, Salavat,Russia |
Revamping of urea plant №50 |
Basic and detailed design, equipment procurement, field supervision, commissioning works,
guarantee tests |
2006 – 2008 | |
Fertalge Industries SPA, Algeria | Prilling tower for urea production | Basic and detailed design, contract and field supervision | 2006-2008 | |
Dorogobuzh, Verkhnedneprovsky, Smolensk region, Russia |
Urea production unit based
on relocatable
equipment, urea storage unit, prilling tower |
Basic and detailed design, feasibility study, development of equipment drawings |
2006 - 2007 | |
Acron, Veliky Novgorod, Russia |
Melamine production unit |
Feasibility study, environmental impact investigation |
2006 – 2007 | |
Azot, Kemerovo, Russia |
Revamp of urea synthesis unit |
Design and procurement of internals into reactor pos. R-101, field supervision, guarantee testing |
2006 | |
Grodno Azot, Grodno, Belarus |
Revamp of urea production unit, installation of recuperator |
Detailed design, equipment procurement, field supervision, guarantee testing |
2006 | |
Acron, Veliky Novgorod, Russia |
Installation of the 5th urea synthesis reactor |
Detailed design, equipment procurement, field supervision |
2006 | |
NevAzot, Nevinnomyssk, Russia |
Revamping of urea production plant №2 |
Basic and detailed design, equipment procurement, contract and field supervision |
2006 | |
Diagnostics & repair services | ||||
Gasprombank, Moscow, Azot, Kemerovo, Russia | Technical inspection of SDS- Azot urea production facilities | Equipment & urea production process condition assessment, development of engineering solutions optimizing technological processes, reducing energy consumption and enhancing reliability of unit operation. | Under development | |
TogliattiAzot, Togliatti, Russia | Inspection
of heat-recovery boiler tube bundle pos.
Е-101 (plant 03А) | Inspection using eddy current testing, issuing final report | Under development | |
Inspection of heat exchanger tubes of condensers’ tube bundles (pos. 4102, 4202, plant 10) | Inspection using nondestructive examination, issuing final report | Under development | ||
ZNIGO, Borisoglebsk, Voronezh region, Russia | Inspection of heat exchanger tubes of reflux condenser (urea production unit) | Inspection using eddy current testing, issuing final report | Under development | |
Sorovskneft, Tyumen, Russia | Inspection
of heat exchanger tubes of S&T oil heaters | Inspection using eddy current testing, issuing recommendations for equipment operating and repairing | 2016 | |
EuroChem, NevAzot, Nevinnomyssk, Russia | Synthesis column dome relining
(pos.6/1, plant №2) | Development of repair method &technique, liner procurement, assembly and welding works, NDT. Inspection, technical documentation development | 2016 | |
Grodno Azot, Grodno, Belarus | Synthesis column relining on
2400 mm height (pos. R-201, Urea-3) | Inspection, technical documentation development | 2016 | |
Technical and corrosion inspection of HP reactor pos. R-201, HP stripper pos. E-201(Urea-3) | Inspection using eddy current and ultrasonic testing, recommendations issue for equipment operating and repairing | 2016 | ||
Egyptian Fertilizers Company «EFC», El Ain Sukhna, Egypt | Relining of urea reactor 322-R-00 (Urea Plant EFC-1 Suez
Fertilizers Co.) | Inspection, relining, technical documentation development,
delivery of required steel products and repair tools. | 2016 | |
UralChem, Azot, Berezniki, Russia, |
Relining of urea synthesis reactor pos. R-901 |
Development
of repair method &technique, liner procurement, assembly and welding works, NDT. |
2016 | |
EuroChem, NAK Azot, Novomoskovsk,Russia | Inspection of heat exchanging tubes using eddy current method (urea plant № 3, second line) | Inspection, issuing recommendations for equipment operating and repairing | 2016 | |
Corrosion and technical inspection of urea synthesis reactor pos. 6/1 (urea plant №2) | Inspection, issuing recommendations for equipment operating and repairing | 2016 | ||
Technological inspection of the prilling tower (complex fertilizers production plant, ammonium nitrate unit ) | Inspection, issuing recommendations and developing engineering solutions optimizing prilling tower technological mode. | 2016 | ||
PhosAgro Cherepovets, Russia | Eddy current testing of
HP vessels heat exchanging tubes (urea, ammonium,
sulphuric acid, nitric acid, complex fertilizers production units) |
Eddy current testing of HP vessels heat exchanging tubes | 2016 | |
«Meleuz mineral fertilizers», Meleuz, Russia | Replacement of old tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit) | Development of repair method&technique, equipment procurement, assembly and welding works, NDT. | 2015 | |
Grodno Azot, Grodno, Belarus |
Corrosion and technical inspection of synthesis reactor pos.R-201, high-pressure scrubber pos. Е-203, high-pressure stripper pos. Е-201, high-pressure condenser pos.Е-202 (urea unit 3 and urea unit 4) |
Inspection , issuing recommendations for equipment operating and repairing |
2015 | |
EuroChem, NevAzot, Nevinnomyssk, Russia |
Technical inspection (urea plant № 2, urea units 1-3) |
Collecting and analysis of technological and analytical data, preparing inspection report, development of engineering solutions on modernization aimed at reducing energy consumption and increasing capacity, feasibility study on installation of CO2 compressor . |
2015 | |
Nitrogénművek Zrt., Pétfürdő Hungary |
Corrosion and technical inspection of stripper pos. E-201 (urea production) |
Inspection using eddy current method, issuing recommendations for equipment operating and repairing |
2015 | |
Ostchem Group, Azot, Cherkassy, Ukraine |
Development of technical documentation to replace three lining belts of cylindrical section of urea synthesis reactor. |
Technical documentation development, field supervision during manufacturing of equipment parts, welding quality control |
2015 | |
Minudobreniya, Rossosh, Russia |
Inspection of heat exchanging tubes of nitrous gases coolers (nitric acid production unit AK-72, the second stage) |
Inspection using eddy current method, issuing recommendations for equipment operating and repairing |
2015 | |
Azot, Kemerovo, Russia |
Complex technical inspection of urea production plant (Tecnimont technology) |
Equipment condition assessment, development of engineering solutions optimizing technological processes, reducing energy consumption and enhancing reliability of unit operation. |
2015 | |
TogliattiAzot, Togliatti, Russia |
Corrosion and technical inspection of the main technological equipment, pipelines and valves for urea plant №1,2 |
Inspection using nondestructive examination, eddy current and ultrasonic detection method using video endoscope, recommendations issue for equipment operating and repairing |
2015 | |
PhosAgro Cherepovets, Russia |
Inspection of heat exchanging tubes operating under pressure |
Inspection using eddy current method, recommendations issue for equipment operating and repairing |
2015 | |
DniproAZOT, Dneprodzerzhinsk, Ukraine |
Technical inspection of heat exchanger equipment (urea plant №1, urea plant №2) |
Inspection using eddy-current method, recommendations issue for equipment operating and repairing |
2014 | |
DniproAZOT Dneprodzerzhinsk, Ukraine |
Corrosion and technical inspection of heat exchanger equipment (urea plant №1, urea plant №2) |
Inspection using eddy-current method, recommendations issue for equipment operating and repairing |
2014 | |
Grodno Azot, Grodno, Belarus |
Corrosion inspection of HP urea synthesis reactor pos. R-201, HP stripper pos. E-201, HP scrubber pos. E-203 (urea plant №3); HP stripper pos. E-201, HP condenser pos. E-202, additional heat exchanger section for preheater pos. E-302 (urea plant №4) |
Inspection using eddy-current method, recommendations issue for equipment operating and repairing |
2014 | |
Repair of two lining belts (urea synthesis reactor pos. R-201, urea plant №3) |
Technical documentation
development, metal equipment procurement, field supervision,
quality control of the works
performed. |
2014 | ||
NevAzot, Nevinnomyssk, Russia |
Complex inspection of urea unit (urea/melamine production plant № 2А) |
Process optimization activities (urea and melamine production unit) |
2014 | |
Ostchem Group, Azot, Cherkassy, Ukraine |
Corrosion and technical inspection of gas pipelines, HP heat exchangers, tanks and vessels of plant M-6 (synthesis column pos. R-201, stripper pos. E-201, condenser pos. E-202, pipelines reg. No 481, 532, 534, 535) |
Inspection using nondestructive examination, eddy current and ultrasonic detection method using video endoscope, recommendations issue for equipment operating and repairing |
2014 | |
Inspection of heating chamber exchanging tubes (evaporation unit pos. 5/1 and 5/2, plant M-9) |
Inspection using nondestructive examination, eddy current and detecting using video endoscope, recommendations issue for equipment operating and repairing | |||
DniproAZOT Dneprodzerzhinsk, Ukraine |
Corrosion and technical inspection of lining and internal devices (reactor, stripper, condenser, scrubber) for urea plant № 1 and urea plant № 2. |
Inspection using nondestructive examination, recommendations issue for equipment operating and repairing |
2014 | |
Kuibyshev Azot, Togliatti, Russia |
Corrosion and technical inspection of main equipment for urea plant № 4 |
Inspection using eddy current and ultrasonic detection methods using video endoscope, recommendations issue for equipment operating and repairing |
2014 | |
EuroChem, NAK Azot, Novomoskovsk, Russia |
Corrosion inspection of heat exchange equipment (urea plant №3 (line 2) |
Inspection of heat exchanging tubes using eddy current methods, recommendations issue for equipment operating and repairing |
2014 | |
Ostchem Group, Severodonetsk Azot Association, Severodonetsk, Ukraine |
Corrosion and technical inspection of synthesis reactors internal surface (urea plant M-3) |
Inspection using eddy current and ultrasonic detection methods, recommendations issue for equipment operating and repairing |
2013 | |
Azot, Cherkassy, Ukraine |
Inspection and surveying of reformer and heat exchanger equipment for plant A-5 |
Inspection using eddy current method and examination using video endoscope, recommendations issue for equipment operating and repairing |
2013 | |
Grodno Azot, Grodno, Belarus |
Corrosion inspection of urea synthesis reactor for urea plant № 4.
Inspection and surveying of urea synthesis reactor/HP condenser for urea plant 3 |
Inspection
using nondestructive examination, recommendations issue for equipment operating and repairing,
metal equipment procurement Inspection using eddy current method, recommendations issue for equipment operating and repairing, metal equipment procurement |
2013 | |
Azot, Kemerovo, Russia |
Synthesis reactor repair support services |
Technical documentation development, technical inspection, quality control
of the works performed,
metal equipment procurement |
2013 | |
Sibur Nephtehim, Dzerzhinsk, Russia |
Inspection of oil cooler heat exchanging tubes of plant № 602 (ethylene oxide and glycol production facility) |
Inspection and final recommendations issues |
2013 | |
PhosAgro Cherepovets, Russia |
Inspection of heat exchanging tubes operating under pressure |
Inspection using eddy current method, recommendations issue for equipment operating and repairing |
2013 | |
EuroChem, NAK Azot, Novomoskovsk, Russia |
Corrosion and technical inspection of main technological equipment (urea plant №3 (first line) |
Inspection using nondestructive examination, recommendations issue for equipment operating and repairing |
2013 | |
Acron, Veliky Novgorod, Russia |
Inspection of heat exchanging tubes of condenser pos. Т-506 (urea unit № 5). Corrosion and technical inspection of urea synthesis reactor K-501 (urea unit № 5) |
Inspection using eddy current method, metallographic examination of damaged pipe. Inspection using nondestructive examination, recommendations issue for equipment operating and repairing |
2013 | |
EuroChem, NevAzot, Nevinnomyssk, Russia |
Corrosion inspection using eddy current testing of equipment (plant № 2А, 12А) |
Inspection, recommendation issue for equipment operating and repairing |
2013 | |
Achema, Lithuania |
Corrosion inspection of urea synthesis reactor (Ø1600mm) and HP mixer. |
Inspection using nondestructive examination, recommendations issue for equipment operating and repairing |
2013 | |
FNTC Group spol.s r.o, Czesh Republic |
Corrosion and technical inspection of urea plant, ammonium nitrate and nitric acid units for FerganaAzot |
Equipment inspection by nondestructive testing method, recommendation issues for equipment operating and repairing. |
2013 | |
Ostchem Group, Azot, Cherkassy, Ukraine |
Corrosion and technical inspection of equipment (urea plant M-2) |
Equipment inspection by nondestructive testing method, recommendation issues for equipment operating and repairing. |
2013 | |
Grodno Azot, Grodno, Belarus |
Inspection of absorber ferromagnetic heat exchanger tubes (ammonia plant № 4) |
Inspection of heat- exchanger tubes by eddy-current method, visual inspection |
2013 | |
Razi Petrochemical Company |
Corrosion inspection of urea plant equipment |
Equipment inspection by nondestructive testing method, recommendation issues for equipment operating. |
2012-2013 | |
Acron, Veliky Novgorod, Russia |
Corrosion and technical inspection of distillation column pos. 7/2 (urea plant № 2) |
Corrosion and technical inspection, recommendation issue for equipment operating and repairing |
2012 | |
Salavat Neftekhim-remstroy, Salavat, Russia |
Repair of urea synthesis reactor pos. 6-1, 6-2 (Gas and Chemical plant «Gasprom nephtehim Salavat», plant № 50) |
Corrosion and technical inspection, lower
bottoms replacement, technical
assistance and quality control of the works
performed |
2012 | |
Grodno Azot, Grodno, Belarus |
Heat- exchanger tubes inspection (HP equipment of urea plant №3) |
Inspection of heat- exchanger tubes by eddy-current method, visual inspection |
2012 | |
Ostchem Group, Azot, Cherkassy, Ukraine |
Ferromagnetic heat- exchanger tubes inspection (pos. 1140-C, ammonia plant A-5) |
Inspection of heat- exchanger tubes by eddy-current method, visual inspection |
2012 | |
Azot, Kemerovo, Russia |
Emergency repair of the lining of synthesis reactor pos.R-901 (urea plant) |
Location of the defect, reactor body repairing, repair support services |
2012 | |
Ostchem Group, Azot, Cherkassy, Ukraine |
Corrosion and technical inspection of equipment (urea plant M-6) |
Corrosion and technical inspection using non destructive examination, recommendations issue for equipment operating and repairing |
2012 | |
EuroChem, NevAzot, Nevinnomyssk, Russia |
Corrosion and technical inspection of equipment (urea plant №2) |
Corrosion and technical inspection using non destructive examination, recommendations issue for equipment operating and repairing |
2012 | |
Ostchem Group, Concern Stirol, Gorlovka, Ukraine |
Complex repair of synthesis column pos. R-901 of (urea plant location1) |
Technical documentation development, metal structure procurement, repair works,
assembly, welding, quality control of the works performed. |
2012-2013 | |
Ostchem Group, Concern Stirol, Gorlovka, Ukraine |
Emergency repairing of synthesis reactor pos. R-901 (urea plant, location 1) |
Location of the defect, reactor body repairing, repair support services, quality control of the works performed. |
2012-2013 | |
EuroChem,NAK Azot, Novomoskovsk, Russia |
Corrosion and technical inspection of critical equipment (urea plant № 3, second line) |
Inspection by eddy-current method of heat exchanger tube bundles |
2012 | |
Acron, Veliky Novgorod, Russia |
Lining replacement of synthesis reactor pos. 6/4 (urea plant) |
Technical documentation development, metal structures development,
technical guidance of repair works, quality control of the works performed. |
2012-2013 | |
UralChem, Azot,Berezniki, Russia, |
Repair of cylindrical section of the lining of synthesis reactor pos. R-901 (urea plant) |
Corrosion and technical inspection of lining, technical documentation
development, metal structures procurement , technical guidance of repair works, quality
control of the works performed. |
2012 | |
Gazprom Neftekhim Salavat Salavat, Russia |
Lining replacement of the bottom parts of urea synthesis and distillation column (urea plant №50) |
Technical documentation development |
2012 | |
Agro-Cherepovets, Cherepovets, Russia |
Corrosion and technical inspection of critical equipment (urea plant) |
Corrosion and technical inspection of lining using non destructive examination, recommendation issue for equipment operating and repairing |
2012 | |
Azot, Kemerovo, Russia |
Emergency repairing of the heat exchanger cover pos. E-902 (urea plant) |
Location of the defect, repair support services |
2012 | |
Togliattiazot, Togliatti, Russia |
Repair of the lining of HP stripper of urea plant |
Location of the defect, repair support services |
2012 | |
Gazprom Neftekhim Salavat, Salavat, Russia |
Emergency repairing of synthesis reactor 6/1 (urea plant №50). |
Location of the defect, repair support services |
2011 | |
EuroChem,NAK Azot, Novomoskovsk, Russia |
Corrosion and technical inspection of critical equipment (urea plant № 3, first line) |
Inspection |
2011 | |
Odessa Port Plant, Yuzhny, Ukraine |
Corrosion and technical inspection of high pressure equipment (urea plant № 2) |
Inspection |
2011 | |
Acron, Veliky Novgorod, Russia |
Corrosion and technical inspection of urea synthesis reactor (urea plant № 5) |
Inspection |
2011-2012 | |
UralChem, Azot, Berezniki, Russia |
Repair of the lining of urea unit synthesis reactor |
Location of the defect, repair support services |
2011 | |
EuroChem, NevAzot, Nevinnomyssk, Russia |
Repair of two lining belts in urea reactor (urea plant 2А) |
Technical documentation
development; metal structures procurement; repair works; quality control of the works performed. |
2011 | |
PhosAgro, Cherepovets, Russia |
Cleaning of heat exchanging equipment of evaporation unit (first stage) |
Inside scale removal from evaporating unit (first stage) tubes by thermo-pneumo- abrasive method |
2011 | |
Acron, Veliky Novgorod, Russia |
Set of internal devices installation into urea plant reactor №5 |
Technical documentation development, metal structures procurement, repairing works assistance,
quality control of the works
performed. |
2011 | |
Acron, Veliky Novgorod, Russia |
Technical guidance for relining of urea synthesis reactor pos. 6/2 of urea plant |
Technical documentation development; metal structures procurement,
repairing works assistance, quality control of the works
performed. |
2011 | |
EuroChem, NevAzot, Nevinnomyssk, Russia |
Corrosion and technical inspection of equipment (plants №2, №2А) |
Inspection |
2011 | |
DniproAZOT Dneprodzerzhinsk, Ukraine |
Corrosion and technical inspection of equipment (urea plant№1 and urea plant №2) |
Corrosion and technical inspection of lining using non destructive examination , repair recommendations issue, repairing work assistance |
2011-2012 | |
Ostchem Group, Concern Stirol, Gorlovka, Ukraine |
Corrosion and technical inspection of sections №1 and №2 (urea plant) |
Inspection |
2011 | |
Odessa Port Plant, Yuzhny, Ukraine |
Corrosion and technical inspection of equipment (urea units №1and № 2) |
Inspection |
2010, 2011 | |
EuroChem,NevAzot, Nevinnomyssk, Russia |
Corrosion and technical inspection of equipment (urea plant №2) |
Inspection |
2010 | |
EuroChem,NevAzot, Nevinnomyssk, Russia |
Technical guidance for partial relining of synthesis reactor 6/3 |
Technical documentation development: technical guidance of repair works |
2010 | |
Acron, Veliky Novgorod, Russia |
Corrosion inspection of urea synthesis reactor 6/2 |
Inspection |
2010 | |
Acron, Veliky Novgorod, Russia |
Industrial safety expertise |
Diagnotics of urea synthesis reactor 6/1 and 6/4 |
2010 | |
Acron, Veliky Novgorod, Russia |
Cleaning of heat exchanging equipment of MP distillation |
Inside scale removal from heat exchanging tubes by pneumocurrent method |
2010 | |
Ostchem Group, Azot, Cherkassy, Ukraine |
Corrosion inspection of equipment (urea plant M-2 and M-6) |
Inspection |
2010 | |
Ostchem Group, Azot, Cherkassy, Ukraine |
Relining of upper part of urea synthesis reactor (plant M-2) |
Development of technical
documentation; metal structures procurement; assembly, welding; control of the works performed |
2010 | |
PhosAgro, Cherepovets, Russia |
Corrosion and technical inspection of urea plant equipment |
Inspection using eddy-curent detection method |
2010 | |
DniproAzot, Dneprodzerzhinsk, Ukraine |
Corrosion and technical inspection of equipment (urea plant №1 and urea plant № 2) |
Inspection |
2010 | |
EuroChem,NAK Azot, Novomoskovsk,Russia |
Technical guidance of partial relining of synthesis reactor 6/2 |
Technical documentation
development; metal structures procurement;
repairing works assistance; quality control of the works
performed |
2010 | |
Azot, Kemerovo, Russia |
Corrosion inspection of urea synthesis reactor |
Inspection |
2010 | |
EuroChem,NevAzot, Nevinnomyssk, Russia |
Corrosion and technical inspection (urea units №2 and №2a) |
Inspection |
2009 | |
PhosAgro, Cherepovets, Russia |
Technological monitoring of urea unit performance in order to reduce ammonia consumption |
Inspection, proposals
development |
2009 | |
Ostchem Group, Severodonetsk Azot Association, Severodonetsk, Ukraine |
Process monitoring of urea unit operation |
Equipment inspection and recommendation issuing for capacity increase and energy saving |
2008 | |
EuroChem, NevAzot, Nevinnomyssk, Russia |
Industrial safety expertise of technical devices (urea plant №2) |
Corrosion and technical inspection |
2008 | |
EuroChem, NAK Azot, Novomoskovsk, Russia |
Repair of the lining of synthesis reactor, separator and stripper (urea plant №3) |
Technical assistance |
2008 | |
Azot, Kemerovo, Russia |
Repair of urea synthesis reactor |
Development of technical documentation and technical guidance for urea synthesis reactors repair |
2008 | |
HIP-Azotara D.O.O., Panchevo, Serbia |
Process monitoring with feasibility study for urea unit revamp |
Inspection, development of activities to increase capacity, capital costs estimation |
2008 | |
DniproAzot, Dneprodzerzhinsk, Ukraine |
Industrial safety expertise of technical means |
Corrosion and technical inspection of lining and internal devices of Customer’s equipment using non destructive examination |
2008 | |
R&D Institute of Measurement Systems, Nizhny Novgorod, Russia |
Process diagnostic to determine the remaining service life of equipment and pipelines of treatment plants. |
Equipment inspection and recommendations issue |
2007 | |
Rikor Electronics, Arzamas, Russia |
Industrial safety expertise of technical means |
Equipment diagnostics |
2007 | |
PhosAgro, Cherepovets, Russia |
Industrial safety expertise of pressurized vessels (urea plant) |
Equipment diagnostic and expert conclusion for service life extension of equipment |
2007 | |
EuroChem, NevAzot, Nevinnomyssk, Russia |
Repair of two lining belts (urea reactor) |
Development of technical documentation, supervision of tools’ manufacturing, technical assistance and field supervision |
2007 | |
EuroChem, NAK Azot, Novomoskovsk, Russia |
Inspection of stripper tubes by eddy-current method |
Inspection |
2007 | |
EuroChem, NAK Azot, Novomoskovsk, Russia |
Corrosion inspection of stripper |
Inspection, recommendation issue for safe operation |
2007 | |
FerghanaAzot, Uzbekistan |
Corrosion inspection of critical vessels and pipelines (urea plant) |
Inspection of critical equipment and piping, recommendations issue with service-life definition estimation |
2007 | |
DniproAzot, Dneprodzerzhinsk, Ukraine |
Corrosion and technical inspection of HP reactor, stripper, condenser (plant №2) |
Equipment inspection and repair procedure development. Repair, thickness gauging of heat exchanging tubes |
2007 | |
UralChem, Minudobreniya, Perm, Russia |
Monitoring of urea production equipment |
Equipment inspection and recommendation issue for capacity increase |
2006 | |
Engineering and Design | ||||
Chemoproject, Czech Republic |
AZOMURES S.A. plant' s prilling tower
modernization aimed to capacity increase from 900 to 1425 TPD, keeping the tower´s
height and ensuring the same quality level. |
Development of technical solutions |
2012 | |
TIKO-Plastic, Dzerzhinsk, Russia | Expanding capacity of
plastic film production plant. Production
building construction |
Development of basic, architectural and civil documentation, field supervision |
2010-2011 | |
Shchekinoazot, Shchekino, Russia |
Hydrogen recovery unit |
Feasibility study, development of basic design (authority package) and detailed design with basic project of Haldor Topsoe (Denmark), field supervision, development of Industrial Safety Declaration |
2010-2011 | |
Korund-Cyan, Dzerzhinsk, Russia |
Sodium cyanide production unit with capacity of 80000 TPD |
Development of detailed design of the second line, development of basic design (authority package of the first and second line) and detailed design of the first line with basic project of “EPC”, Germany. Development of Industrial Safety Declaration. |
2010 | |
TIKO-Plastic, Dzerzhinsk, Russia |
Polyethylene film and its products production unit |
Basic and detail engineering |
2006-2007 | |
Korund, Dzerzhinsk, Russia |
Lacquer and paint production unit |
Detailed design for infrastructure |
2006-2007 | |
Korund, Dzerzhinsk, Russia |
Polyester resins production unit |
Detailed design for infrastructure |
2005-2006 |
Urea and other products storage units | ||||||
Metafrax, Gubaha, Russia |
Revamp of urea storage unit unloading section |
Basic and detailed design |
2013 | |||
Balakovo Mineral Fertilisers, Balakovo, Russia | Above-ground ammonia storage unit |
Feasibility study |
2010 | |||
Korund, Dzerzhinsk, Russia |
Revamp of chlorine
storage unit, adaptation to industry
safety requirements |
Detailed design | 2009 | |||
Ammoni, Mendeleevsk, Russia |
Construction of urea storage facilities |
Basic design |
2008 – 2009 | |||
Pervouralsky novotrubny works, Perovuralsk, Russia |
Revamp of liquid ammonia storage unit №33 |
Basic and detailed
design, nonstandardized equipment procurement |
2006-2007 | |||
Zawolzhsky Motorny Zawod, Zavolshye, Russia |
Revamp of sulphuric acid storage unit |
Turnkey project |
2006-2007 | |||
Zawolzhsky Motorny Zawod, Zavolshye, Russia | Petrol storage unit | Turnkey project | 2006 | |||
Nizhegorodsky machine-building plant, Russia |
Revamping of chlorine storage unit and chlorinator |
Turnkey project |
2006-2007 | |||
Kuibyshev Azot, Togliatti, Russia | Revamping of urea storage unit | Basic and detailed design, field supervision, contract supervision, commissioning works | 2007 | |||
TIKO-Plastic, Dzerzhinsk, Russia |
Detailed design for feedstock and final product storage facilities |
Basic and detailed design, field supervision |
2006 | |||
Ammonia cooling units | ||||||
Minudobreniya Rossosh, Russia |
Detailed design of ammonia cooling unit and air
conditioning unit for final product cooling at units № 1, 2 of phosphoric
fertilizers production plant |
Basic and detailed design, field supervision |
2006-2007 | |||
Nizhny Novgorod Oil and fat factory, Nizhny Novgorod, Russia |
Revamping of ammonia cooling unit at margarine factory |
Basic and detailed design, field supervision |
2006 | |||
Industrial safety expertise | ||||||
EuroChem,NAK Azot, Novomoskovsk, Russia |
Industrial safety expertise of urea plant equipment. |
Equipment
diagnostics and remaining service life estimation |
2014 | |||
EuroChem,NAK Azot, Novomoskovsk, Russia |
Industrial safety expertise of urea plant equipment |
Equipment diagnostic and
technical devices' remaining service life estimation |
2013 | |||
Cherepovetsky Azot, Cherepovets, Russia |
Industrial safety expertise of emergency localisation plan at urea plant. |
Expertise of documents related to hazardous industrial facilities operation |
2012 | |||
Syntez-Acetone, Dzerzhinsk, Russia |
Industrial safety expertise of emergency localization plan for hydric dioxide production plant (isopropyl method production) |
Expertise of documents related to hazardous industrial facilities operation |
2011 | |||
Azot, Kemerovo, Russia |
Industrial safety expertise of urea plant equipment |
Equipment diagnostic and remaining service life estimation |
2011 | |||
PSK Biosynthez, Voronezh, Russia |
Metrological evaluation of the technological regulations «The stage of preparation of stabilizing agents ВС-30А, ВС-1 and chemicals for synthetic caoutchouc» |
Expertise |
2011 | |||
Avtotrade, Dzerzhinsk, Russia |
Industrial safety expertise of urea plant equipment |
Equipment diagnostic
and remaining service life estimation |
2010 | |||
Avtotrade, Dzerzhinsk, Russia |
Industrial safety expertise of design documents on the project of increasing production of anti-freeze agents |
Expertise of documents |
2010 | |||
Nizhegorodsky machine-building plant, Nizhny Novgorod, Russia |
Industrial safety expertise of design documents of emergency localization plan for chlorination plant |
Expertise of documents related to hazardous industrial units operation |
2010 | |||
EuroChem,NAK Azot, Novomoskovsk, Russia |
Industrial safety expertise of emergency localisation plan at urea unit |
Expertise of documents related to hazardous industrial facilities operation |
2009 | |||
UralChem, Azot,Berezniki, Perm region, Russia |
Industrial safety expertise for emergency localization plans at urea plant |
Expertise of documents related to hazardous industrial facilities operation |
2008 | |||
Pigment, Dzerzhinsk, Russia |
Industrial safety expertise emergency localization plans at lacquer and solvents production plant |
Expertise of documents related to hazardous industrial facilities operation |
2008 | |||
Vyksa Steel Works, Vyksa, Nizhny Novgorod region, Russia |
Industrial safety expertise of galvanizing unit equipment |
Equipment diagnostic and remaining service life estimation |
2008 | |||
Polyplast, Nizhny Novgorod, Russia |
Industrial safety expertise of documents related to polymer materials production plant |
Expertise of design and operation documents |
2007 | |||
Ecopol, Dzerzhinsk, Russia |
Industrial safety expertise of design documents related to paint-and-lacquer materials production unit |
Design documents expertise |
2007 | |||
Dzerzhinsk Production Association Plastik, Russia |
Industrial safety expertise of detailed design for highly inflammable liquids storage |
Expertise of detailed design |
2007 | |||
LUKOIL-Volganefteproduct, Nizhny Novgorod, Russia |
Industrial safety expertise of detailed design for oil delivery terminals. Adaptation to industrial safety requirements |
Expertise of detailed design |
2007 | |||
Dzerzhinsk Production Association Plastik, Russia |
Industrial safety expertise for highly inflammable liquids |
Expertise of detailed design |
2006 | |||
Other works | ||||||
Korund-Cyan, Dzerzhinsk,Russia | Technical modernization of the cooling water unit (Sodium cyanide production unit, building В50, second line) | Development of basic and detailed design | Under development | |||
Sodium cyanide production unit technical modernization and construction (second line) |
Development of basic and detailed design |
2016 |
||||
Alcali storage unit modernization (sodium cyanide production unit, building B80, second line) |
Development of basic and detailed design |
2016 |
||||
Research Institute for Mineral Fertilizers (NIUIF), Moscow, Russia |
Selecting best available techniques on estimation of threshold emissions/negative environmental impacts and proposals for application of automatic emission control systems at urea production plant |
Research and Design works |
2016 |
|||
EuroChem, NevAzot, Nevinnomyssk, Russia |
Technical modernization of running &maintenance department facility |
Development of basic and detailed design |
2016 |
|||
KazAzot, Aktau, Kazakhstan |
Providing solutions for secondary steam condensate treatment, ammonia nitrate manufacturing and wastewater purifying. |
Feasibility study |
2015 | |||
Federal State Enterprise Plant named аfter Sverdlov, Dzerzhinsk, Russia |
Modernization and construction of small- scale hexogen production unit |
Development of design
and estimate documentation, field supervision |
2015, 2017 | |||
Federal State Enterprise Plant named аfter Sverdlov, Dzerzhinsk, Russia |
Technical modernization, automation of manufacturing and material handling processes |
Development of design and estimate documentation, field supervision |
2015, 2017 | |||
Korund-Cyan, Dzerzhinsk, Russia |
Sodium cyanide storage unit technical modernization |
Development of detailed design |
2015 | |||
Research Institute for Mineral Fertilizers (NIUIF), Moscow, Russia |
Development of a reference guide in most appropriate technologies used to produce ammonia, mineral fertilizers and mineral acids (sections developed by NIIK: Ammonia, NA, AN, CAN, Urea, UAN). Scientific and technical support to get the approval of expertise. |
|
2015 | |||
Qatar Fertiliser Company (S.A.Q) |
Multipurpose High Speed Drum Granulation (HSDG) Pilot Plant for production of Granulated Urea with additives, capacity 100 kg per hour |
Technology licensing, engineering, equipment procurement, installation supervision, commissioning & guarantee testing |
2014-2016 | |||
PVFCCо, Phu My I, Ba Ria Vung Tau, Vietnam |
HSDG unit for production of compound fertilizers (capacity 100 kg/h) |
Technology licensing, engineering, equipment procurement, installation supervision, testing & commissioning |
2014-2015 | |||
EuroChem, NAK Azot, Novomoskovsk, Russia |
Development of engineering solutions aimed at increasing efficiency of dust treatment unit of the prilling tower (urea plant № 2), reduction of ammonia emission after prilling tower and capacity increasing to 1500 TPD |
Technological inspection, analysis of data received, engineering solutions development, report on the work performed |
2013 | |||
Angarsk nitrogen and fertilizer plant, Angarsk, Russia |
Development of engineering solutions aimed at efficiency increasing and stabilization of work of ammonium nitrate AC-60 production facility prilling tower |
Technological inspection, analysis of data received, engineering solutions development, report on the work performed |
2013 | |||
Rustavi Azot, Gorgia |
Relocation project of the used urea granulation plant in Yeosu city («Namhae Chemical Co», South Korea) |
Technical evaluation, collection of design, technical and operational documentation, supervision on dismantlement, technical assistance and checking when tagging \setting equipment parts into containers. |
2013 | |||
Football fields, Khimki, Russia |
Production and procurement of sulfur coated urea experimental batch |
Production and procurement |
2013 | |||
Emirates biofertilizer factory, Arab Emirates |
Production and procurement of sulfur coated urea experimental batch to India |
Production and procurement |
2013 | |||
Kuibyshev Azot, Togliatti, Russia |
Implementation of catalytic purification system, compressor plant, outdoor installations and production buildings (energy efficient cyclohexanol production unit installation project, capacity 140000 TPY) |
Development of basic and detailed design, field supervision and construction technical support |
2012-2014 | |||
Health and recreation resort Golubaya Oka, Dzerzhinsk, Russia |
Installation of block –container gas -piston electrical unit for the purpose of energy saving |
Development of basic and detailed design , expertise support, field supervision |
2011 | |||
Nizhfarm, Nizhny Novgorod, Russia |
Grass-root gel production plant |
Adjustment of the design made by “Chemofarm engineering” (Belgrad, Serbia) to Russian norms and regulations at the stages of “Basic design” and “Detailed design” |
2011 | |||
Zawolzhsky Motorny Zawod, Zavolshye, Russia |
Technical upgrading of pipelines for acids solution discharge in heat-treating workshop |
Detailed design |
2011 | |||
Nexis, Perm, Russia |
CAN / magnesium nitrate production unit with capacity 10 000 TPY, product is being produced m in the form of solids and solutions. |
Development of initial data for design works, development of design documentation for nonstandardized equipment |
2010-2011 | |||
SIBUR Mineral Fertilizers, Moscow, Russia |
Receipt of analytical data on mineral fertilizers (sent for export) necessary to register according to REACH requirements |
Definition of qualitative and quantative composition of mineral fertilizers |
2010 | |||
AutoVAZ, Togliatti, Russia |
Technical upgrading of liquid ammonia evaporation unit |
Development of basic and detailed design, industrial safety expertise, development
of emergency localization plans and adaptation to current regulations |
2010 | |||
Zawolzhsky Motorny Zawod, Zavolshye, Russia |
Project development and construction of testing station for diesel engines |
Turnkey project |
2009 |