референции до 26-02-2018 ENG

Video Видео
Our Listings

REFERENCE LIST NIIK (R&D Institute of Urea)October 2016

Customer

Project

Scope of services of NIIK

Year

Production of urea, melamine and other nitrogen chemical products

Volzhskiy Orgsintez- Volzhsky, Volgograd region, RussiaSodium dimetilditiocarbamate production unit, capacity 15000 tons per yearDevelopment of basic and detailed design Under development
Azot, Kemerovo, RussiaUAN production unitFeasibility studyUnder development
Teсhnoleasing, Moscow, Russia Methanol production unit (Skovorodino, Amur region)Investment feasibility studyUnder development
Novgorodsky GIAP, Veliky Novgorod, Russia Sulfuric acid production unit; Wet-process phosphoric acid production unit; Monoammonium phosphate (MAP) and\or diammonium phosphate (DAP) production unit Feasibility study2016
Novoroscement Novorossiysk, Russia Methanol production unitReviewing options for unit location at Novoroscement site2016
ShchekinoAzot, Shchekino, Russia Methanol production unitReviewing options for unit location at ammonia, urea and supfuric acid production complex site 2016
Metafrax, Gubakha, Russia Ammonia-urea-melamine complexReviewing options for site location, development of declaration of intention, preenvironmental impact assessment, participation in public hearings, detail design for site preparation, adaptation of Casale basic engineering package to Russian norms and regulations, authority package development, development of basic design for prilling tower , raw water treatment unit (including water intake unit) and waste water treatment system, equipment procurement for prilling tower construction.
2015 - Under development
OJSC MMC Norilsk Nickel, Moscow, Russia Urea production complex (Dudinka site) Feasibility study 2016
LLC Zhilevskaya kremniorganika, Sitne-shchelkanovo, Moscow region, Russia Ammonia-urea complex Feasibility study 2016
KuibyshevAzot, Togliatti, Russia Technical modernization of urea production plant №4 Basic and detail design documentation development, equipment procurement, field supervision 2016
Rashtriya Chemicals and Fertilizers Ltd., Mumbai, India Trombay V urea plant modernization Procurement & installation of a Set of Internal Devices comprising Vortex Mixer and Conversion Booster for urea synthesis reactor at RCF Trombay V Urea plant 2015 - 2016
Haldor Topsoe (HTAS)
Ammonia unit modernization aimed at capacity increase up to 2000 TPD at Uralchem site, Kirovo-Chepetsk, Kirov region
1) Adaptation of HTAS design basis with the requirements of Russian Federation
2) Development of Authority Package including project's costs estimation
3) CO2 removal engineering package based on HTAS specification.
Under development
Baltic Gas Chemical Company, Saint-Petersburg, Russia
Baltic methanol production plant
1) Adaptation of MHI basic engineering documentation with the requirements of Russian Federation;
2) Authority Package development;
3) Acting as general design contractor responsible for providing technical specifications, design data, getting all necessary permits and authorizations including final building permit.
4) Acting for Customer at supervisory and expert bodies.
Under development
UralChemMinudobreniya, Perm, Russia
Urea production unit revamp, new prilling tower construction
Basic and detailed design documentation development for urea production unit revamp based on Stamicarbon basic design; engineering documentation package development for the new prilling tower (NIIK technology)
Under development
ShchekinoAzot, Shchekino, Russia
Ammonia-urea complex
Development of declaration of intention
2016
Sulphuric acid production unit construction
Site location estimation
2015
Casale SA, Switzerland
Urea production unit and new prilling tower construction (capacity 2200 TPD) at TogliattyAzot site
1) Authority package development for urea production based on the licensor’s basic design, including adaptation to Russian norms and regulations.
2) Authority package for prilling tower and handling system to process urea.
3) Engineering surveying and inspection for steel elements and structures.
4) Detailed design development
5) Packaged supply of equipment for prilling tower and new urea reactor support facilities.
2015 - 2016
Grodno Azot, Grodno, Belarus
Nitrogen complex (ammonia-urea-hydrogen)
Feasibility study
2015
EuroChem, NAK Azot, Novomoskovsk, Russia
Revamp of urea unit 2 (gas vent elimination)
Technology development, basic and detail design, equipment procurement
2009, 2015
KuibyshevAzot, Togliatti, Russia
Urea production unit
Investment feasibility studies
2014
PhosAgro-Cherepovets, Cherepovets, Russia
Urea granulation unit, capacity 1500 TPD
Development of basic and detailed design, feasibility studies (environmental impact assessment), field supervision
2014-2015
Urea production plant (section № 2) technical modernization with capacity increase to 1600 TPD
Development of basic and detailed design, field supervision, technical inspection for equipment manufacturing
2014-2016
Tulagiprohim,
Tula,
Russia
Ammonia production unit, liquid ammonia storage unit for Ammonia Kingisepp Plant
Basic design development for ammonia production plant: central control station, service- and- office building; for liquid ammonia storage facility: central station, laboratory, service- and- office building.
2014
Sibmetahim,
Tomsk,
Russia
Chemicals manufacturing unit
Expert economic evaluation including solution development for two options: creating ammonia-urea-melamine complex and production of synthetic liquid fuel
2014
CREON-ENERGY,
Moscow,
Russia
Methanol production
Investment feasibility studies
2014
PhosAgro,
Cherepovets,
Russia
Granulated urea production unit,
gas turbine power station
Pre-feasibility study (assessment of dissipation and air quality analyses)
2014
Rosstroy, Novocherkassk, Russia
Ammonia-urea complex
Feasibility study
2014
EuroChem, NAK Azot, Novomoskovsk, Russia
Technical modernization of urea plant № 2 with capacity increase to 1500 TPD
Development of basic and detailed design, equipment procurement, construction technical support
2013-2016
UAN production unit on the basis of urea production plant № 2 (capacity 1200 TPD)
Development of basic and detailed design
2013-2014
32,5% urea solution production unit (capacity 100000 TPY) including urea solution treatment unit on the basis of urea plant № 2 evaporation unit
Development of basic and detailed design
2013-2014
Technical modernization of urea plant № 3 (second line) with capacity increase to 1450 TPD
Development of basic and detailed design, construction technical support
2013-2016
PhosAgro,
Cherepovets,
Russia
Ammonia production unit AM-3 (capacity 2200 TPD)
Development of basic and detailed design (сivil engineering stage), environmental impact assessment (front-end engineering stage), harmonization of the documentation with the requirements of Russian Federation, field supervision
2013-2015
Turn-key realization of new analytical laboratory (ammonia production plant)

2016
EuroChem, NevAzot , Nevinnomyssk, Russia
Commercial grade aqua ammonia production unit (plant №11)
Basic and detailed design
2013-2014
National Chemical Company, Russia
Gaz -chemical complex (Kozmino, Primorsky territory)
Declaration of intention development;
Environmental Impact Assessment (front-end engineering stage);
Declaration compliance with local codes, authority permits and approval;
Participation in public hearings, customer support
2013
Nagarjuna Fertilizers and Chemicals Limited,
India
Urea synthesis unit modernization
Vortex mixer installation into urea synthesis reactor, on-site supervision
2013
ICM,
Saint-Petersburg,
Russia
Ammonia – granulated urea complex based on natural gas, including utility corridor to port
Declaration of intention development; BE and FEED stages technical support (harmonization of the documentation developed by foreign companies with the requirements of Russian Federation), environmental impact investigation (design basis stage), development of basic and detailed design
2012-2014
Gasprom Neftehim Salavat, Salavat,
Russia
Ammonia emission reduction (absorption/desorption units, urea plant № 24)
Technological inspection of urea plant, development of engineering solutions for the reduction of ammonia emission at existing absorption\desorption units, capital cost evaluation.
2012
Minudobreniya, Rossosh, Russia
Grass-root complex ammonia-urea
Feasibility study
2012
Acron,
Veliky Novgorod,
Russia
Urea production units (1-4) revamping aimed to capacity increase up to 2000 TPD and feedstock / energy saving
Development of basic and detailed design, basic documentation development for «Structured system for monitoring and control of building» section, field supervision, equipment procurement, technical supervision of design and assembly works.

2012-2014
EuroChem, NAK Azot,
Novomoskovsk,
Russia
Technological inspection (urea plant №3, second line) aimed at capacity increase to 1600 t/d
Technological inspection
2012
EuroChem, NAK Azot,
Novomoskovsk,
Russia
Urea production unit revamping (off gases recovery sections addition (urea plant № 2)
Procurement of internal devices, first stage distillation columns (3 items), tools package for absorber revamping pos. K-31
2012-2013
Ostchem Group,
Azot,
Cherkassy,
Ukraine
Design and procurement of HP stripper pos. E-201 with capacity increase up to 1500 tpd (urea plants M-2)
HP stripper detail design documentation development, technical supervision, equipment design and procurement

2011-2012
Azot,
Kemerovo, Russia
Urea production unit revamping with high speed drum granulator installation
Development of basic and detailed design, equipment procurement

2011-2013
KazAzot, Aktau, Kazakhstan
Ammonia nitrate production unit modernization: HSDG for ammonia nitrate manufacturing
Technical solution development, detail design documentation development, equipment procurement

2011-2012
EuroChem, NAK Azot
Novomoskovsk,
Russia
Multifunctional HSDG unit for manufacturing granulated and complex urea with additives and deicer (urea plant №2)
Technical solution development
2011
Kuibyshev Azot,
Togliatti,
Russia
Acid ammonia recovery unit downstream urea unit absorption tower.
Development of basic and detailed design
2011-2012
EuroChem, NAK Azot
Novomoskovsk,
Russia
Technical modernization of evaporation unit № 5 for urea production unit №2 (capacity 1000 TPD)
Development of basic and detailed design
2011-2012
EuroChem, NAK Azot
Novomoskovsk,
Russia

Unit for manufacturing solution containing 32.5% by weight of urea for purification of exhaust gases with overall capacity of 50-100 mt annually.
Urea units inspection, development of front -end engineering design considering the construction of a new unit
2011
«Ammonia-Methanol-Urea» complex» (Tatarstan, Russia)

Mitsubishi Heavy Industries,
Japan


Architectural and civil documentation of urea production units and adjoining processing facilities

2010-2015

Ammoni,
Mendeleevsk,
Russia

Harmonization of the documentation developed by foreign companies with the requirements of Russian Federation, equipment procurement, equipment certification (including foreign contractors equipment)
2010-2015

Ammoni,
Mendeleevsk,
Russia
«Ammonia- Methanol- Urea» complex, Tatarstan, Russia
Off- plant facilities construction (ammonia, urea, methanol, acid, alkalis storage units; loading/ unloading racks; waste-treatment facilities; demineralized water units, water recycling units, service- and- office buildings, substations, high- voltage transmission line (110 kW), automatic process control system, railroad, flare devices etc )
Off plant facilities: turnkey construction projects including engineering, equipment procurement, construction and erection works, commissioning operations, operational documentation development, supervision etc.

2010-2015

Acron,
Veliky Novgorod,
Russia

Implementation of computer process simulator for personal training and knowledge assessment

Computer-generated technological simulator for urea production assembly №5

2011-2012
Acron,
Veliky Novgorod,
Russia
Evaporation system for urea production unit and prilling tower modernization with capacity increase
Development of detail design documentation, equipment procurement, field supervision

2011-2013
ShchekinoAzot,
Shchekino, Russia
Ammonia-urea complex
Feasibility study
2011
Maxam-Chirchik,
Chirchik,
Uzbekistan
Modernization and technical upgrading of urea unit
Development of basic and detailed design, equipment procurement, field and contract supervision, commissioning works and guarantee tests
2010-2012
UralChem, Azot, Berezniki, Russia
Urea synthesis reactor modernization
Internals procurement, technical supervision of assembly
2010
Acron,
Veliky Novgorod,
Russia
Technical inspection of urea plant aimed at capacity increase and energy saving
Technical inspection
2010-2011
EuroChem, NevAzot, Nevinnomyssk, Russia
Modernization of unit №2 (urea plant №2)
Development of basic and detailed design
2010-2011
EuroChem,NevAzot, Nevinnomyssk, Russia

Implementation of computer process simulator for personnel training and knowledge assessment
Development of computer process simulator for expansion of urea unit
2010 – 2011
PhosAgro,
Cherepovets,
Russia
Urea plant production unit with capacity 1500 TPD, procured by “Chemoproject” (Czech Republic)
Development of basic and detailed design for integration of urea plant with the existing utilities infrastructure, field supervision
2010-2012
Design Institute «Salavatgasonephte-himproect», Salavat, Republic of Bashkortostan, Russia Prilling tower for urea plant №24
Development of detailed design based on basic engineering package of “TEC”, Japan, field supervision
2010-
2011
PhosAgro,
Cherepovets, Russia
Revamp of urea synthesis evaporation unit
Development of basic and detailed design
2010
PhosAgro,
Cherepovets,
Russia
Implementation of computer process simulator for personnel training and knowledge assessment
Hard and software procurement
2010-2011
Kuibyshev Azot, Togliatti, Russia Prilling tower revamp (urea plant №4) Detailed design 2010
Gasprom nephtehim Salavat, Salavat, Russia Prilling towers revamp (urea plant №24) Basic and detailed design, packaged equipment procurement 2009-2010
KuibyshevAzot, Togliatti, Russia
Revamp of evaporation unit (urea plant №1, unit № 4)
Development of detailed design
2010
Azot, Kemerovo,
Russia
Feasibility study for urea plant revamp, new project estimation

Inspection of urea plant, feasibility study of revamping

2009
Yokogawa Electric,
Moscow
Development of control system for CO2 compressor with arrangement of a room for a set of technical devices at NAK “Azot"
Development of detailed design
2009
Acron, Veliky Novgorod, Russia
Design of granulated urea unit based on Rotoform technology
Engineering
2009
PhosAgro AG - Cherepovetsky Azot, Cherepovets, Russia
Urea production unit with capacity 1500 TPD, procured by “Chemoproject” (Czech Republic)
Development of basic design based on a foreign licensor basic package
2008 – 2010
Ammoni, Mendeleevsk, Russia
Chemical complex: ammonia- methanol – urea
Development of basic design for urea plant.
2008 – 2009
PhosAgro Cherepovets, Russia Prilling tower for urea production (capacity of 1500 TPD) Basic and detailed design, equipment procurement 2008-2012
Togliattiazot, Togliatti, Samara Russia Prilling tower modernization (urea plant) Detailed design 2008-2009
Ostchem Group, Azot, Cherkassy, Ukraine
Revamp of urea plant М-2
Feasibility study
2008
Acron, Veliky Novgorod, Russia
Urea unit revamp with capacity increase and energy saving
Basic and detailed design
2008
UralChem, Voskresensk Mineral Fertilizers, Voskresensk, Russia
Urea production unit with capacity 600 (1200) TPD
Basic design
2008
Acron, Veliky Novgorod, Russia Urea unit №5 on the basis of relocated unit Basic design, feasibility study, detailed design, equipment design and procurement, 3D model development and installation, field supervision2007 – 2011
EuroChem, NevAzot, Nevinnomyssk, Russia Prilling tower revamp (urea unit, plant 2A) Detailed design, design documentation, field supervision2007-2009
Voskresensk Mineral Fertilizers, Voskresensk, Russia
Urea production unit with capacity 600 TPD
Feasibility study

2007
Grodno Azot, Grodno, Belarus
Revamp of urea plant №4 with capacity increase
Feasibility study, architectural design, detailed design, building project, field supervision
2007 – 2012
EuroChem, NAK Azot, Novomoskovsk, Russia
Urea production unit on the basis of relocatable unit with capacity increase and energy saving
Basic design, feasibility study, detailed design
2007– 2010
EuroChem, NAK Azot, Novomoskovsk, Russia

Revamp of urea plant №3 with capacity increase to 2000 TPD

Authority engineering and detailed design based on «Urea Casale» basic design, equipment procurement, field supervision

2007 – 2010
Ostchem Group, Severodonetsk Azot Association, Severodonetsk, Ukraine
Development of basic design for urea unit revamp with capacity increase from 1200 up to 1500 TPD
Basic and detailed design, equipment procurement, field supervision

2007 – 2010
EuroChem, NevAzot, Nevinnomyssk, Russia
Urea evaporation unit for melamine plant
FEED- package, detailed design, equipment procurement, field supervision
2008 – 2010
EuroChem, NevAzot, Nevinnomyssk, Russia

Melamine unit by technology of «LURGI» AG, Germany
Basic design based on foreign licensor’s basic engineering package, detailed design of civil part, field supervision
2007 – 2011
TogliattiAzot,
Togliatti, Russia
Technical upgrading of urea unit with integration of melamine unit
Basic design, feasibility study
2007 – 2008
KuibyshevAzot,
Togliatti,
Russia
Revamp of urea unit with capacity increase
Process improvement. Feasibility study, basic and detailed design, equipment procurement, contract supervision, guarantee testing

2007 – 2008
Gasprom nephtehim Salavat, Salavat, Russia Basic design for urea prilling tower Basic and detailed design, field supervision 2007-2008
Ostchem Group, Severodonetsk Azot Association, Severodonetsk, Ukraine Development of basic design for urea unit revamp with capacity increase from 1000 up to 1200 TPD
Basic design, detailed design, equipment procurement, field supervision, guarantee testing

2006-2007
AB Achema,
Lithuania
Urea production unit based on relocatable equipment
Detailed design, field supervision, development of operational manuals
2006-2008
PhosAgro,
Cherepovets, Russia
Revamping of distillation unit with capacity increase (urea production plant)
Detailed design, equipment procurement, contract supervision

2007
EuroChem, NAK Azot, Novomoskovsk,
Russia
Implementation of computer process simulator for personnel training and knowledge assessment
Hard- and software complex

2006-2008
Ostchem Group, Azot,
Cherkassy,
Ukraine
Revamping of urea plant М-6
Authority package and detailed design with basic project of «Urea Casale», field supervision
2006-2010
Gasprom nephtehim Salavat, Salavat,Russia
Revamping of urea plant №50
Basic and detailed design, equipment procurement, field supervision, commissioning works, guarantee tests

2006 – 2008
Fertalge Industries SPA, Algeria Prilling tower for urea production Basic and detailed design, contract and field supervision 2006-2008
Dorogobuzh, Verkhnedneprovsky, Smolensk region, Russia
Urea production unit based on relocatable equipment, urea storage unit, prilling tower

Basic and detailed design, feasibility study, development of equipment drawings
2006 - 2007
Acron, Veliky Novgorod, Russia
Melamine production unit
Feasibility study, environmental impact investigation
2006 – 2007
Azot, Kemerovo,
Russia
Revamp of urea synthesis unit
Design and procurement of internals into reactor pos. R-101, field supervision, guarantee testing
2006
Grodno Azot, Grodno, Belarus
Revamp of urea production unit, installation of recuperator
Detailed design, equipment procurement, field supervision, guarantee testing

2006
Acron,
Veliky Novgorod, Russia
Installation of the 5th urea synthesis reactor
Detailed design, equipment procurement, field supervision

2006
NevAzot,
Nevinnomyssk, Russia
Revamping of urea production plant №2
Basic and detailed design, equipment procurement, contract and field supervision

2006

Diagnostics & repair services

Gasprombank, Moscow, Azot, Kemerovo, Russia Technical inspection of SDS- Azot urea production facilitiesEquipment & urea production process condition assessment, development of engineering solutions optimizing technological processes, reducing energy consumption and enhancing reliability of unit operation.Under development
TogliattiAzot, Togliatti, Russia Inspection of heat-recovery boiler tube bundle pos. Е-101 (plant 03А)
Inspection using eddy current testing, issuing final reportUnder development
Inspection of heat exchanger tubes of condensers’ tube bundles (pos. 4102, 4202, plant 10)Inspection using nondestructive examination, issuing final reportUnder development
ZNIGO, Borisoglebsk, Voronezh region, RussiaInspection of heat exchanger tubes of reflux condenser (urea production unit)Inspection using eddy current testing, issuing final report Under development
Sorovskneft, Tyumen, Russia Inspection of heat exchanger tubes of S&T oil heaters
Inspection using eddy current testing, issuing recommendations for equipment operating and repairing2016
EuroChem, NevAzot, Nevinnomyssk, RussiaSynthesis column dome relining (pos.6/1, plant №2)
Development of repair method &technique, liner procurement, assembly and welding works, NDT. Inspection, technical documentation development 2016
Grodno Azot, Grodno, Belarus Synthesis column relining on 2400 mm height (pos. R-201, Urea-3)
Inspection, technical documentation development
2016
Technical and corrosion inspection of HP reactor pos. R-201, HP stripper pos. E-201(Urea-3)Inspection using eddy current and ultrasonic testing, recommendations issue for equipment operating and repairing2016
Egyptian Fertilizers Company «EFC», El Ain Sukhna, Egypt Relining of urea reactor 322-R-00 (Urea Plant EFC-1 Suez Fertilizers Co.)
Inspection, relining, technical documentation development, delivery of required steel products and repair tools.
2016
UralChem, Azot, Berezniki, Russia,
Relining of urea synthesis reactor pos. R-901

Development of repair method &technique, liner procurement, assembly and welding works, NDT.

2016
EuroChem, NAK Azot, Novomoskovsk,Russia Inspection of heat exchanging tubes using eddy current method (urea plant № 3, second line) Inspection, issuing recommendations for equipment operating and repairing 2016
Corrosion and technical inspection of urea synthesis reactor pos. 6/1 (urea plant №2) Inspection, issuing recommendations for equipment operating and repairing 2016
Technological inspection of the prilling tower (complex fertilizers production plant, ammonium nitrate unit ) Inspection, issuing recommendations and developing engineering solutions optimizing prilling tower technological mode. 2016
PhosAgro Cherepovets, Russia Eddy current testing of HP vessels heat exchanging tubes (urea, ammonium, sulphuric acid, nitric acid, complex fertilizers production units)
Eddy current testing of HP vessels heat exchanging tubes 2016
«Meleuz mineral fertilizers», Meleuz, RussiaReplacement of old tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit)Development of repair method&technique, equipment procurement, assembly and welding works, NDT.2015
Grodno Azot, Grodno, Belarus
Corrosion and technical inspection of synthesis reactor pos.R-201, high-pressure scrubber pos. Е-203, high-pressure stripper pos. Е-201, high-pressure condenser pos.Е-202 (urea unit 3 and urea unit 4)
Inspection , issuing recommendations for equipment operating and repairing
2015
EuroChem, NevAzot, Nevinnomyssk, Russia
Technical inspection (urea plant № 2, urea units 1-3)
Collecting and analysis of technological and analytical data, preparing inspection report, development of engineering solutions on modernization aimed at reducing energy consumption and increasing capacity, feasibility study on installation of CO2 compressor .
2015
Nitrogénművek Zrt., Pétfürdő Hungary
Corrosion and technical inspection of stripper pos. E-201 (urea production)
Inspection using eddy current method, issuing recommendations for equipment operating and repairing
2015
Ostchem Group, Azot, Cherkassy, Ukraine
Development of technical documentation to replace three lining belts of cylindrical section of urea synthesis reactor.
Technical documentation development, field supervision during manufacturing of equipment parts, welding quality control
2015
Minudobreniya, Rossosh, Russia
Inspection of heat exchanging tubes of nitrous gases coolers (nitric acid production unit AK-72, the second stage)
Inspection using eddy current method, issuing recommendations for equipment operating and repairing
2015
Azot, Kemerovo, Russia
Complex technical inspection of urea production plant (Tecnimont technology)
Equipment condition assessment, development of engineering solutions optimizing technological processes, reducing energy consumption and enhancing reliability of unit operation.
2015
TogliattiAzot, Togliatti, Russia
Corrosion and technical inspection of the main technological equipment, pipelines and valves for urea plant №1,2
Inspection using nondestructive examination, eddy current and ultrasonic detection method using video endoscope, recommendations issue for equipment operating and repairing
2015
PhosAgro Cherepovets, Russia
Inspection of heat exchanging tubes operating under pressure
Inspection using eddy current method, recommendations issue for equipment operating and repairing
2015
DniproAZOT, Dneprodzerzhinsk, Ukraine
Technical inspection of heat exchanger equipment (urea plant №1, urea plant №2)
Inspection using eddy-current method, recommendations issue for equipment operating and repairing
2014
DniproAZOT
Dneprodzerzhinsk,
Ukraine
Corrosion and technical inspection of heat exchanger equipment (urea plant №1, urea plant №2)
Inspection using eddy-current method, recommendations issue for equipment operating and repairing
2014
Grodno Azot,
Grodno,
Belarus
Corrosion inspection of HP urea synthesis reactor pos. R-201, HP stripper pos. E-201, HP scrubber pos. E-203 (urea plant №3);
HP stripper pos. E-201, HP condenser pos. E-202, additional heat exchanger section for preheater pos. E-302 (urea plant №4)
Inspection using eddy-current method, recommendations issue for equipment operating and repairing
2014
Repair of two lining belts (urea synthesis reactor pos. R-201, urea plant №3)
Technical documentation development, metal equipment procurement, field supervision, quality control of the works performed.

2014
NevAzot,
Nevinnomyssk, Russia
Complex inspection of urea unit (urea/melamine production plant № 2А)
Process optimization activities (urea and melamine production unit)
2014
Ostchem Group, Azot,
Cherkassy,
Ukraine
Corrosion and technical inspection of gas pipelines, HP heat exchangers, tanks and vessels of plant M-6 (synthesis column pos. R-201, stripper pos. E-201, condenser pos. E-202, pipelines reg. No 481, 532, 534, 535)
Inspection using nondestructive examination, eddy current and ultrasonic detection method using video endoscope, recommendations issue for equipment operating and repairing
2014
Inspection of heating chamber exchanging tubes (evaporation unit pos. 5/1 and 5/2, plant M-9)
Inspection using nondestructive examination, eddy current and detecting using video endoscope, recommendations issue for equipment operating and repairing
DniproAZOT
Dneprodzerzhinsk,
Ukraine
Corrosion and technical inspection of lining and internal devices (reactor, stripper, condenser, scrubber) for urea plant № 1 and urea plant № 2.
Inspection using nondestructive examination, recommendations issue for equipment operating and repairing
2014
Kuibyshev Azot, Togliatti, Russia
Corrosion and technical inspection of main equipment for urea plant № 4
Inspection using eddy current and ultrasonic detection methods using video endoscope, recommendations issue for equipment operating and repairing
2014
EuroChem, NAK Azot,
Novomoskovsk,
Russia
Corrosion inspection of heat exchange equipment (urea plant №3 (line 2)
Inspection of heat exchanging tubes using eddy current methods, recommendations issue for equipment operating and repairing
2014
Ostchem Group, Severodonetsk Azot Association, Severodonetsk, Ukraine
Corrosion and technical inspection of synthesis reactors internal surface (urea plant M-3)
Inspection using eddy current and ultrasonic detection methods, recommendations issue for equipment operating and repairing
2013
Azot,
Cherkassy,
Ukraine
Inspection and surveying of reformer and heat exchanger equipment for plant A-5
Inspection using eddy current method and examination using video endoscope, recommendations issue for equipment operating and repairing
2013
Grodno Azot,
Grodno,
Belarus
Corrosion inspection of urea synthesis reactor for urea plant № 4. Inspection and surveying of urea synthesis reactor/HP condenser for urea plant 3
Inspection using nondestructive examination, recommendations issue for equipment operating and repairing, metal equipment procurement
Inspection using eddy current method, recommendations issue for equipment operating and repairing, metal equipment procurement
2013
Azot, Kemerovo,
Russia
Synthesis reactor repair support services
Technical documentation development, technical inspection, quality control of the works performed, metal equipment procurement

2013
Sibur Nephtehim,
Dzerzhinsk,
Russia
Inspection of oil cooler heat exchanging tubes of plant № 602 (ethylene oxide and glycol production facility)
Inspection and final recommendations issues
2013
PhosAgro Cherepovets, Russia
Inspection of heat exchanging tubes operating under pressure
Inspection using eddy current method, recommendations issue for equipment operating and repairing
2013
EuroChem, NAK Azot,
Novomoskovsk,
Russia
Corrosion and technical inspection of main technological equipment (urea plant №3 (first line)
Inspection using nondestructive examination, recommendations issue for equipment operating and repairing
2013
Acron,
Veliky Novgorod,
Russia
Inspection of heat exchanging tubes of condenser pos. Т-506 (urea unit № 5).
Corrosion and technical inspection of urea synthesis reactor K-501 (urea unit № 5)
Inspection using eddy current method, metallographic examination of damaged pipe.
Inspection using nondestructive examination, recommendations issue for equipment operating and repairing
2013
EuroChem, NevAzot,
Nevinnomyssk, Russia
Corrosion inspection using eddy current testing of equipment (plant № 2А, 12А)
Inspection, recommendation issue for equipment operating and repairing
2013
Achema,
Lithuania
Corrosion inspection of urea synthesis reactor (Ø1600mm) and HP mixer.
Inspection using nondestructive examination, recommendations issue for equipment operating and repairing
2013
FNTC Group spol.s r.o,
Czesh Republic

Corrosion and technical inspection of urea plant, ammonium nitrate and nitric acid units for FerganaAzot
Equipment inspection by nondestructive testing method, recommendation issues for equipment operating and repairing.
2013
Ostchem Group, Azot,
Cherkassy,
Ukraine
Corrosion and technical inspection of equipment (urea plant M-2)
Equipment inspection by nondestructive testing method, recommendation issues for equipment operating and repairing.
2013
Grodno Azot,
Grodno, Belarus
Inspection of absorber ferromagnetic heat exchanger tubes (ammonia plant № 4)
Inspection of heat- exchanger tubes by eddy-current method, visual inspection
2013
Razi Petrochemical Company
Corrosion inspection of urea plant equipment
Equipment inspection by nondestructive testing method, recommendation issues for equipment operating.
2012-2013
Acron,
Veliky Novgorod, Russia
Corrosion and technical inspection of distillation column pos. 7/2 (urea plant № 2)
Corrosion and technical inspection, recommendation issue for equipment operating and repairing
2012
Salavat Neftekhim-remstroy, Salavat,
Russia
Repair of urea synthesis reactor pos. 6-1, 6-2 (Gas and Chemical plant «Gasprom nephtehim Salavat», plant № 50)
Corrosion and technical inspection, lower bottoms replacement, technical assistance and quality control of the works performed

2012
Grodno Azot, Grodno, Belarus
Heat- exchanger tubes inspection (HP equipment of urea plant №3)
Inspection of heat- exchanger tubes by eddy-current method, visual inspection
2012
Ostchem Group, Azot, Cherkassy,
Ukraine
Ferromagnetic heat- exchanger tubes inspection (pos. 1140-C, ammonia plant A-5)
Inspection of heat- exchanger tubes by eddy-current method, visual inspection
2012
Azot, Kemerovo,
Russia
Emergency repair of the lining of synthesis reactor pos.R-901 (urea plant)
Location of the defect, reactor body repairing, repair support services
2012
Ostchem Group, Azot,
Cherkassy,
Ukraine
Corrosion and technical inspection of equipment (urea plant M-6)
Corrosion and technical inspection using non destructive examination, recommendations issue for equipment operating and repairing
2012
EuroChem, NevAzot, Nevinnomyssk, Russia

Corrosion and technical inspection of equipment (urea plant №2)
Corrosion and technical inspection using non destructive examination, recommendations issue for equipment operating and repairing
2012
Ostchem Group, Concern Stirol,
Gorlovka,
Ukraine
Complex repair of synthesis column pos. R-901 of (urea plant location1)
Technical documentation development, metal structure procurement, repair works, assembly, welding, quality control of the works performed.

2012-2013
Ostchem Group, Concern Stirol, Gorlovka, Ukraine
Emergency repairing of synthesis reactor pos. R-901 (urea plant, location 1)

Location of the defect, reactor body repairing, repair support services, quality control of the works performed.

2012-2013
EuroChem,NAK Azot,
Novomoskovsk,
Russia
Corrosion and technical inspection of critical equipment (urea plant № 3, second line)
Inspection by eddy-current method of heat exchanger tube bundles
2012
Acron,
Veliky Novgorod,
Russia
Lining replacement of synthesis reactor pos. 6/4 (urea plant)
Technical documentation development, metal structures development, technical guidance of repair works, quality control of the works performed.
2012-2013
UralChem, Azot,Berezniki,
Russia,
Repair of cylindrical section of the lining of synthesis reactor pos. R-901 (urea plant)
Corrosion and technical inspection of lining, technical documentation development, metal structures procurement , technical guidance of repair works, quality control of the works performed.
2012
Gazprom Neftekhim Salavat
Salavat,
Russia
Lining replacement of the bottom parts of urea synthesis and distillation column (urea plant №50)
Technical documentation development
2012
Agro-Cherepovets, Cherepovets,
Russia
Corrosion and technical inspection of critical equipment (urea plant)
Corrosion and technical inspection of lining using non destructive examination, recommendation issue for equipment operating and repairing
2012
Azot,
Kemerovo,
Russia
Emergency repairing of the heat exchanger cover pos. E-902 (urea plant)
Location of the defect, repair support services
2012
Togliattiazot,
Togliatti, Russia
Repair of the lining of HP stripper of urea plant
Location of the defect, repair support services
2012
Gazprom Neftekhim Salavat,
Salavat, Russia
Emergency repairing of synthesis reactor 6/1 (urea plant №50).
Location of the defect, repair support services
2011
EuroChem,NAK Azot,
Novomoskovsk, Russia
Corrosion and technical inspection of critical equipment (urea plant № 3, first line)
Inspection
2011
Odessa Port Plant,
Yuzhny, Ukraine
Corrosion and technical inspection of high pressure equipment (urea plant № 2)
Inspection
2011
Acron, Veliky Novgorod, Russia
Corrosion and technical inspection of urea synthesis reactor (urea plant № 5)
Inspection
2011-2012
UralChem, Azot, Berezniki, Russia Repair of the lining of urea unit synthesis reactor
Location of the defect, repair support services
2011
EuroChem, NevAzot,
Nevinnomyssk, Russia
Repair of two lining belts in urea reactor (urea plant 2А)
Technical documentation development; metal structures procurement; repair works; quality control of the works performed.

2011
PhosAgro, Cherepovets, Russia
Cleaning of heat exchanging equipment of evaporation unit (first stage)
Inside scale removal from evaporating unit (first stage) tubes by thermo-pneumo- abrasive method
2011
Acron,
Veliky Novgorod,
Russia
Set of internal devices installation into urea plant reactor №5
Technical documentation development, metal structures procurement, repairing works assistance, quality control of the works performed.
2011
Acron,
Veliky Novgorod,
Russia
Technical guidance for relining of urea synthesis reactor pos. 6/2 of urea plant
Technical documentation development; metal structures procurement, repairing works assistance, quality control of the works performed.
2011
EuroChem, NevAzot, Nevinnomyssk, Russia
Corrosion and technical inspection of equipment (plants №2, №2А)
Inspection
2011
DniproAZOT
Dneprodzerzhinsk,
Ukraine
Corrosion and technical inspection of equipment (urea plant№1 and urea plant №2)
Corrosion and technical inspection of lining using non destructive examination , repair recommendations issue, repairing work assistance
2011-2012
Ostchem Group, Concern Stirol,
Gorlovka, Ukraine
Corrosion and technical inspection of sections №1 and №2 (urea plant)

Inspection
2011
Odessa Port Plant,
Yuzhny, Ukraine
Corrosion and technical inspection of equipment (urea units №1and № 2)
Inspection
2010, 2011
EuroChem,NevAzot, Nevinnomyssk, Russia
Corrosion and technical inspection of equipment (urea plant №2)
Inspection
2010
EuroChem,NevAzot, Nevinnomyssk, Russia
Technical guidance for partial relining of synthesis reactor 6/3
Technical documentation development: technical guidance of repair works
2010
Acron,
Veliky Novgorod, Russia
Corrosion inspection of urea synthesis reactor 6/2
Inspection
2010
Acron, Veliky Novgorod, Russia
Industrial safety expertise
Diagnotics of urea synthesis reactor 6/1 and 6/4
2010
Acron, Veliky Novgorod, Russia
Cleaning of heat exchanging equipment of MP distillation
Inside scale removal from heat exchanging tubes by pneumocurrent method
2010
Ostchem Group, Azot, Cherkassy,
Ukraine
Corrosion inspection of equipment (urea plant M-2 and M-6)
Inspection
2010
Ostchem Group, Azot, Cherkassy,
Ukraine
Relining of upper part of urea synthesis reactor (plant M-2)
Development of technical documentation; metal structures procurement; assembly, welding; control of the works performed
2010
PhosAgro, Cherepovets, Russia
Corrosion and technical inspection of urea plant equipment
Inspection using eddy-curent detection method

2010
DniproAzot, Dneprodzerzhinsk, Ukraine
Corrosion and technical inspection of equipment (urea plant №1 and urea plant № 2)
Inspection
2010
EuroChem,NAK Azot, Novomoskovsk,Russia
Technical guidance of partial relining of synthesis reactor 6/2
Technical documentation development; metal structures procurement; repairing works assistance; quality control of the works performed
2010
Azot, Kemerovo, Russia
Corrosion inspection of urea synthesis reactor
Inspection
2010
EuroChem,NevAzot, Nevinnomyssk, Russia
Corrosion and technical inspection (urea units №2 and №2a)

Inspection
2009
PhosAgro,
Cherepovets,
Russia
Technological monitoring of urea unit performance in order to reduce ammonia consumption
Inspection, proposals development

2009
Ostchem Group, Severodonetsk Azot Association, Severodonetsk, Ukraine
Process monitoring of urea unit operation
Equipment inspection and recommendation issuing for capacity increase and energy saving
2008
EuroChem, NevAzot, Nevinnomyssk, Russia
Industrial safety expertise of technical devices (urea plant №2)
Corrosion and technical inspection
2008
EuroChem, NAK Azot, Novomoskovsk, Russia
Repair of the lining of synthesis reactor, separator and stripper (urea plant №3)
Technical assistance
2008
Azot,
Kemerovo, Russia
Repair of urea synthesis reactor
Development of technical documentation and technical guidance for urea synthesis reactors repair
2008
HIP-Azotara D.O.O., Panchevo, Serbia
Process monitoring with feasibility study for urea unit revamp
Inspection, development of activities to increase capacity, capital costs estimation
2008
DniproAzot,
Dneprodzerzhinsk,
Ukraine
Industrial safety expertise of technical means
Corrosion and technical inspection of lining and internal devices of Customer’s equipment using non destructive examination
2008
R&D Institute of Measurement Systems,
Nizhny Novgorod, Russia
Process diagnostic to determine the remaining service life of equipment and pipelines of treatment plants.
Equipment inspection and recommendations issue
2007
Rikor Electronics, Arzamas, Russia
Industrial safety expertise of technical means
Equipment diagnostics
2007
PhosAgro, Cherepovets, Russia
Industrial safety expertise of pressurized vessels (urea plant)
Equipment diagnostic and expert conclusion for service life extension of equipment
2007
EuroChem, NevAzot, Nevinnomyssk,
Russia
Repair of two lining belts (urea reactor)
Development of technical documentation, supervision of tools’ manufacturing, technical assistance and field supervision
2007
EuroChem, NAK Azot, Novomoskovsk, Russia
Inspection of stripper tubes by eddy-current method
Inspection
2007
EuroChem, NAK Azot, Novomoskovsk, Russia
Corrosion inspection of stripper
Inspection, recommendation issue for safe operation
2007
FerghanaAzot,
Uzbekistan
Corrosion inspection of critical vessels and pipelines (urea plant)
Inspection of critical equipment and piping, recommendations issue with service-life definition estimation
2007
DniproAzot,
Dneprodzerzhinsk, Ukraine
Corrosion and technical inspection of HP reactor, stripper, condenser (plant №2)
Equipment inspection and repair procedure development. Repair, thickness gauging of heat exchanging tubes
2007
UralChem,
Minudobreniya,
Perm, Russia
Monitoring of urea production equipment
Equipment inspection and recommendation issue for capacity increase
2006

Engineering and Design

Chemoproject,
Czech Republic
AZOMURES S.A. plant' s prilling tower modernization aimed to capacity increase from 900 to 1425 TPD, keeping the tower´s height and ensuring the same quality level.
Development of technical solutions
2012
TIKO-Plastic,
Dzerzhinsk,
Russia
Expanding capacity of plastic film production plant. Production building construction
Development of basic, architectural and civil documentation, field supervision
2010-2011
Shchekinoazot,
Shchekino,
Russia
Hydrogen recovery unit
Feasibility study, development of basic design (authority package) and detailed design with basic project of Haldor Topsoe (Denmark), field supervision, development of Industrial Safety Declaration
2010-2011
Korund-Cyan,
Dzerzhinsk,
Russia
Sodium cyanide production unit with capacity of 80000 TPD
Development of detailed design of the second line,
development of basic design (authority package of the first and second line) and detailed design of the first line with basic project of “EPC”, Germany. Development of Industrial Safety Declaration.
2010
TIKO-Plastic, Dzerzhinsk, Russia
Polyethylene film and its products production unit
Basic and detail engineering
2006-2007
Korund,
Dzerzhinsk, Russia
Lacquer and paint production unit
Detailed design for infrastructure
2006-2007
Korund,
Dzerzhinsk, Russia
Polyester resins production unit
Detailed design for infrastructure
2005-2006

Urea and other products storage units

Metafrax,
Gubaha, Russia
Revamp of urea storage unit unloading section
Basic and detailed design
2013
Balakovo Mineral Fertilisers,
Balakovo, Russia
Above-ground ammonia storage unit Feasibility study
2010
Korund, Dzerzhinsk,
Russia
Revamp of chlorine storage unit, adaptation to industry safety requirements

Detailed design
2009
Ammoni, Mendeleevsk, Russia
Construction of urea storage facilities
Basic design
2008 – 2009
Pervouralsky novotrubny works, Perovuralsk, Russia
Revamp of liquid ammonia storage unit №33
Basic and detailed design, nonstandardized equipment procurement

2006-2007
Zawolzhsky Motorny Zawod,
Zavolshye, Russia
Revamp of sulphuric acid storage unit
Turnkey project
2006-2007
Zawolzhsky Motorny Zawod, Zavolshye, Russia Petrol storage unit Turnkey project 2006
Nizhegorodsky machine-building plant, Russia
Revamping of chlorine storage unit and chlorinator
Turnkey project
2006-2007
Kuibyshev Azot, Togliatti, Russia Revamping of urea storage unit Basic and detailed design, field supervision, contract supervision, commissioning works 2007
TIKO-Plastic,
Dzerzhinsk, Russia
Detailed design for feedstock and final product storage facilities
Basic and detailed design, field supervision
2006

Ammonia cooling units

Minudobreniya
Rossosh,
Russia
Detailed design of ammonia cooling unit and air conditioning unit for final product cooling at units № 1, 2 of phosphoric fertilizers production plant

Basic and detailed design, field supervision
2006-2007
Nizhny Novgorod Oil and fat factory,
Nizhny Novgorod, Russia
Revamping of ammonia cooling unit at margarine factory
Basic and detailed design, field supervision
2006

Industrial safety expertise

EuroChem,NAK Azot, Novomoskovsk, Russia
Industrial safety expertise of urea plant equipment.
Equipment diagnostics and remaining service life estimation
2014
EuroChem,NAK Azot, Novomoskovsk, Russia
Industrial safety expertise of urea plant equipment
Equipment diagnostic and technical devices' remaining service life estimation

2013
Cherepovetsky Azot, Cherepovets, Russia
Industrial safety expertise of emergency localisation plan at urea plant.
Expertise of documents related to hazardous industrial facilities operation
2012
Syntez-Acetone,
Dzerzhinsk,
Russia
Industrial safety expertise of emergency localization plan for hydric dioxide production plant (isopropyl method production)
Expertise of documents related to hazardous industrial facilities operation
2011
Azot,
Kemerovo,
Russia
Industrial safety expertise of urea plant equipment
Equipment diagnostic and remaining service life estimation


2011
PSK Biosynthez,
Voronezh,
Russia
Metrological evaluation of the technological regulations «The stage of preparation of stabilizing agents ВС-30А, ВС-1 and chemicals for synthetic caoutchouc»
Expertise
2011
Avtotrade, Dzerzhinsk, Russia
Industrial safety expertise of urea plant equipment
Equipment diagnostic and remaining service life estimation

2010
Avtotrade, Dzerzhinsk, Russia
Industrial safety expertise of design documents on the project of increasing production of anti-freeze agents
Expertise of documents
2010
Nizhegorodsky machine-building plant, Nizhny Novgorod, Russia
Industrial safety expertise of design documents of emergency localization plan for chlorination plant
Expertise of documents related to hazardous industrial units operation
2010
EuroChem,NAK Azot, Novomoskovsk, Russia
Industrial safety expertise of emergency localisation plan at urea unit
Expertise of documents related to hazardous industrial facilities operation
2009
UralChem, Azot,Berezniki, Perm region, Russia
Industrial safety expertise for emergency localization plans at urea plant
Expertise of documents related to hazardous industrial facilities operation
2008
Pigment,
Dzerzhinsk,
Russia
Industrial safety expertise emergency localization plans at lacquer and solvents production plant
Expertise of documents related to hazardous industrial facilities operation
2008
Vyksa Steel Works,
Vyksa, Nizhny Novgorod region, Russia
Industrial safety expertise of galvanizing unit equipment
Equipment diagnostic and remaining service life estimation

2008
Polyplast,
Nizhny Novgorod, Russia
Industrial safety expertise of documents related to polymer materials production plant
Expertise of design and operation documents
2007
Ecopol,
Dzerzhinsk, Russia
Industrial safety expertise of design documents related to paint-and-lacquer materials production unit
Design documents expertise
2007
Dzerzhinsk Production Association Plastik, Russia
Industrial safety expertise of detailed design for highly inflammable liquids storage
Expertise of detailed design
2007
LUKOIL-Volganefteproduct, Nizhny Novgorod, Russia
Industrial safety expertise of detailed design for oil delivery terminals. Adaptation to industrial safety requirements
Expertise of detailed design
2007
Dzerzhinsk Production Association Plastik, Russia
Industrial safety expertise for highly inflammable liquids
Expertise of detailed design
2006

Other works

Korund-Cyan, Dzerzhinsk,Russia

Technical modernization of the cooling water unit (Sodium cyanide production unit, building В50, second line)Development of basic and detailed designUnder development
Sodium cyanide production unit technical modernization and construction (second line)
Development of basic and detailed design
2016
Alcali storage unit modernization (sodium cyanide production unit, building B80, second line)
Development of basic and detailed design
2016
Research Institute for Mineral Fertilizers (NIUIF), Moscow, Russia
Selecting best available techniques on estimation of threshold emissions/negative environmental impacts and proposals for application of automatic emission control systems at urea production plant
Research and Design works
2016
EuroChem, NevAzot, Nevinnomyssk, Russia
Technical modernization of running &maintenance department facility
Development of basic and detailed design
2016
KazAzot, Aktau, Kazakhstan
Providing solutions for secondary steam condensate treatment, ammonia nitrate manufacturing and wastewater purifying.
Feasibility study
2015
Federal State Enterprise Plant named аfter Sverdlov, Dzerzhinsk, Russia
Modernization and construction of small- scale hexogen production unit
Development of design and estimate documentation, field supervision

2015, 2017
Federal State Enterprise Plant named аfter Sverdlov, Dzerzhinsk, Russia
Technical modernization, automation of manufacturing and material handling processes
Development of design and estimate documentation, field supervision
2015, 2017
Korund-Cyan, Dzerzhinsk, Russia
Sodium cyanide storage unit technical modernization
Development of detailed design
2015
Research Institute for Mineral Fertilizers (NIUIF), Moscow, Russia
Development of a reference guide in most appropriate technologies used to produce ammonia, mineral fertilizers and mineral acids (sections developed by NIIK: Ammonia, NA, AN, CAN, Urea, UAN). Scientific and technical support to get the approval of expertise.

2015
Qatar Fertiliser Company (S.A.Q)
Multipurpose High Speed Drum Granulation (HSDG) Pilot Plant for production of Granulated Urea with additives, capacity 100 kg per hour
Technology licensing, engineering, equipment procurement, installation supervision, commissioning & guarantee testing
2014-2016
PVFCCо,
Phu My I,
Ba Ria Vung Tau, Vietnam
HSDG unit for production of compound fertilizers (capacity 100 kg/h)
Technology licensing, engineering, equipment procurement, installation supervision, testing & commissioning
2014-2015
EuroChem, NAK Azot, Novomoskovsk,
Russia

Development of engineering solutions aimed at increasing efficiency of dust treatment unit of the prilling tower (urea plant № 2), reduction of ammonia emission after prilling tower and capacity increasing to 1500 TPD
Technological inspection, analysis of data received, engineering solutions development, report on the work performed
2013
Angarsk nitrogen and fertilizer plant,
Angarsk,
Russia
Development of engineering solutions aimed at efficiency increasing and stabilization of work of ammonium nitrate AC-60 production facility prilling tower
Technological inspection, analysis of data received, engineering solutions development, report on the work performed
2013
Rustavi Azot,
Gorgia
Relocation project of the used urea granulation plant in Yeosu city («Namhae Chemical Co», South Korea)
Technical evaluation, collection of design, technical and operational documentation, supervision on dismantlement, technical assistance and checking when tagging \setting equipment parts into containers.
2013
Football fields,
Khimki, Russia
Production and procurement of sulfur coated urea experimental batch
Production and procurement
2013
Emirates biofertilizer factory, Arab Emirates
Production and procurement of sulfur coated urea experimental batch to India
Production and procurement
2013
Kuibyshev Azot,
Togliatti,
Russia
Implementation of catalytic purification system, compressor plant, outdoor installations and production buildings (energy efficient cyclohexanol production unit installation project, capacity 140000 TPY)
Development of basic and detailed design, field supervision and construction technical support
2012-2014
Health and recreation resort Golubaya Oka, Dzerzhinsk,
Russia
Installation of block –container gas -piston electrical unit for the purpose of energy saving
Development of basic and detailed design , expertise support, field supervision

2011
Nizhfarm,
Nizhny Novgorod,
Russia
Grass-root gel production plant
Adjustment of the design made by “Chemofarm engineering” (Belgrad, Serbia) to Russian norms and regulations at the stages of “Basic design” and “Detailed design”
2011
Zawolzhsky Motorny Zawod,
Zavolshye, Russia
Technical upgrading of pipelines for acids solution discharge in heat-treating workshop
Detailed design
2011
Nexis,
Perm,
Russia
CAN / magnesium nitrate production unit with capacity 10 000 TPY, product is being produced m in the form of solids and solutions.
Development of initial data for design works, development of design documentation for nonstandardized equipment
2010-2011
SIBUR Mineral Fertilizers, Moscow,
Russia
Receipt of analytical data on mineral fertilizers (sent for export) necessary to register according to REACH requirements
Definition of qualitative and quantative composition of mineral fertilizers
2010
AutoVAZ,
Togliatti,
Russia
Technical upgrading of liquid ammonia evaporation unit
Development of basic and detailed design, industrial safety expertise, development of emergency localization plans and adaptation to current regulations

2010
Zawolzhsky Motorny Zawod,
Zavolshye, Russia
Project development and construction of testing station for diesel engines
Turnkey project
2009