Current references

Video Видео
Our Listings


Customer

Project

Scope of services of NIIK

Year

EPC/Turnkey projects

Metafrax

Gubakha, Russia

Ammonia-urea-melamine complex

Construction of OSBL facilities on a turn-key basis (project documentation and detail design, equipment supply, construction and installation, commissioning works)

2016-2021

Apatit

Cherepovets, Russia
UKL-7-76M production of non-concentrated nitric acid with a capacity of 135 000 MTPYTurnkey construction (project documentation and detailed design documentation, equipment supply, construction and installation, commissioning works)2017-2020

PhosAgro, Cherepovets, Russia

Mitsubishi Heavy Industries, Japan

Ammonia production unit AM-3 (capacity 2200 TPD)

Turn-key project for construction of a new analytical laboratory of ammonia production unit

2016-2017

Ammoni

Mendeleevsk, Tatarstan, Russia

Ammonia-methanol-urea complex

Construction of OSBL facilities on a turn-key basis (project documentation and detailed design documentation, equipment supply, construction and installation, commissioning works)

2010-2015

Zawolzhsky Motorny Zawod

Zavolshye, Russia

Construction of testing station for diesel engines

Construction Turnkey project

2009

Zawolzhsky Motorny Zawod

Zavolshye, Russia

Revamp of sulphuric acid storage unit

Revamp Turnkey project

2006-2007

Petrol storage unit

Construction Turnkey project

2006

Nizhegorodsky machine-building plant, Russia

Revamping of chlorine storage unit and chlorinator

Revamp Turnkey project

2006-2007

Design engineering

Production complexes

Nondisclosed
Ammonia-Urea complexAdaptation of Licensors' Basic Engineering Packages to Russian norms and standards
2020
Nondisclosed Ammonia-urea complex Adaptation of licenser’s basic engineering package to Russian norms and regulations 2020
China National Chemical Engineering Co. (CNCEC), Ltd., China (Shchekinoazot site)
Ammonia-Urea Complex - Adaptation of the Licensors’ BEPs to RF norms and regulations
- Project documentation for the complex (ISBL/ OSBL facilities)
2019-2021
- Adaptation of detail design documentation developed by Customer to RF norms and regulations 2022
- Repeated Project documentation 2024
Field supervision and technical assistance
Present
Metafrax, Gubakha, Russia, Casale S.A., Switzerland Ammonia-urea-melamine complex - Basic design for OSBL facilities (Melamine 2 unit)
- Correction of BEP for prilling tower with capacity 1150 TPD at operation of Melamine-2 unit

2018-2019

Metafrax, Gubakha, Russia

Ammonia-urea-melamine complex

- Development of detail design for site arrangement

- Adaptation of licenser’s basic engineering package to Russian norms and regulations

- Authority package development (ISBL/OSBL)

- Construction of OSBL facilities on a turn-key basis (detail design, equipment supply, construction and installation, commissioning works)

2016-2021

Metafrax, Gubakha, Russia

Casale S.A.,

Switzerland

Ammonia-urea-melamine complex

- Development of basic design for OSBL facilities and prilling tower

- Detail design (ISBL facilities’ architectural and civil documentation)

2016-2021

Ammoni,

Mendeleevsk,

Tatarstan,

Russia

Ammonia-methanol-urea complex

- Development of authority package (ISBL/OSBL)

- Construction of OSBL facilities on a turn- key basis (detail design, equipment supply, construction and installation, commissioning works)

2010-2015

Ammoni,

Mendeleevsk,

Tatarstan,

Russia

Mitsubishi Heavy Industries, Ltd. (MHI), Japan

Ammonia-methanol-urea complex

- Adaptation of licenser’s documentation on ISBL facilities to Russian norms and regulations,

- Detail design (architectural and civil documentation for urea production ISBL facilities)

- Licenser’s equipment certification for ISBL facilities

ICM,

Saint-Petersburg,

Russia

Ammonia-urea complex (Vistino, Kingisepp, Leningrad region)

- Adaptation of BE/FEED licensor’s documentation to Russian norms and Regulations

- Development of authority package (ISBL/OSBL)

2013-2015

Ammonia production units

JSC NAK Azot,
Novomoskovsk, Russia
Construction of isothermal storage for liquid ammonia with capacity 10,000 tonsMain technical solutions development2023

Giammarco Vetrocoke Srl, Italy

CO2 removal system modernization (ammonium production unit designed by TEC) aimed at capacity increase up to 2000 TPD at Perm mineral fertilizer site.

Project documentation

2018-2019

Haldor Topsoe (HTAS), Denmark

Ammonia unit modernization aimed at capacity increase up to 2000 TPD at Uralchem site (Kirovo-Chepetsk, Kirov region)

- Adaptation of design basis to Russian norms and regulations

- Development of authority package including documentation for CO2 removal unit

2015-2017

Tulagiprochem
Tula, Russia

Ammonia production unit and liquid ammonia storage unit (Kingisepp Plant)

Development of authority package for OSBL facilities

2014-2015

PhosAgro,

Cherepovets, Russia

Ammonia production unit AM-3 (capacity 2200 TPD)

- Adaptation of licenser’s basic engineering package to Russian norms and regulations

- Project Documentation

2013-2017

PhosAgro,

Cherepovets, Russi

Mitsubishi Heavy Industries,Japan

Ammonia production unit AM-3 (capacity 2200 TPD)

- Detail design (architectural and civil parts)

- Turnkey project for construction of a new analytical laboratory for ammonia production unit

2014-2017

2016-2017

Linde Engineering RUS

(representative office of LINDE AG, Germany)

Ammonia production unit

- Adaptation of licenser’s basic engineering package to Russian norms and regulations

- Project documentation

- Detail design development

2013-2017

Nevinnomyssky Azot, Nevinnomyssk, Russia

Commercial grade aqua ammonia production unit (unit No.11)

- Project documentation

- Detailed design documentation

2013-2014

Nitric acid units

Apatit JSC

(JSC PhosAgro), Cherepovets, Russia

UKL-7-76M production of non-concentrated nitric acid with a capacity of 135 000 mtpy Turnkey construction (design and detailed design documentation, equipment supply, construction and installation, commissioning) 2017-2020

Methanol units

GPN-Razvitie

Saint-Petersburg, Russia
Gas Chemical Complex for production of methanol- Technical assistance
- Project documentation audit
2022-2023
NondisclosedMethanol unit. (Kingisepp). Water treatment unit Project documentatio2022
Not disclosed (Confidential Information) Methanol unit - Adaptation of the Licensor's FEED package to the rules and regulations of the Russian Federation
- Development of FEED parts in the scope of the construction part and the HVAC system
- Project documentation
2020-2021
Hyundai Engineering Co., Ltd. (HEC)
Methanol unitAdaptation of the Licensor's FEED package to RF norms and regulations
2019-2021
OOO «G T M 1», Volgograd, Russia Methanol unit - Adaptation of the Licensor's FEED package to RF norms and regulations
- Project documentation
2019-2023
Metafrax, Gubaha, Russia Technical modernization of methanol production unit (integration within an ammonia-methanol-urea complex) - Detailed design documentation 2019
Technolizing, Skovorodino, Russia Methanol production unit with capacity 3000 TPD Adaptation of licenser’s basic engineering package to Russian norms and regulations

2018-2020

Assistance of engineering surveys

2018-2021

Engineering & Consulting services on organizational issues related to public hearings preparation

Consulting services on construction issues

2021

2022

Nizhnekamskneftekhim, Nizhnekamsk, Tatarstan Methanol production with capacity 500 000 TPY

- Adaptation of Licensor’s BEP to RF norms and regulations

- Project documentation

2021

Metafrax, Gubaha, Russia

Casale SA, Switzerland
Technical upgrade of Methanol production unit including integration to ammonia-urea-methanol complex
- Adaptation of licenser’s basic engineering package to Russian norms and regulations
- Detailed design of civil part

2018-2020

ShchekinoAzot, Shchekino, Russia Methanol production unit with capacity 500 000 TPY - Adaptation of licenser’s basic engineering package to Russian norms and regulations
- Project documentation
- Detail design development

2018-2021

- Field supervision

2019-2022

Baltic Gas Chemical Company, Saint-Petersburg, Russia

Baltic methanol production plant

- Adaptation of licenser’s basic engineering package to Russian norms and regulations

- Project documentation

Detailed design documentation- 

2015-2021

Urea production units

NondisclosedUrea Plant technical upgradeEP-contract
2024 - present
NondisclosedUrea Plant technical upgrade in order to switch to 2-year non-stop operation- Project Documentation (TX (process) part)
- Detailed design documentation
2024 - present
KuibyshevAzot

Togliatti, Russia
Urea Unit No. 4 technical upgrade in order to improve product quality and stabilize the operation of the pre-evaporation stage and evaporation units

- Detailed design documentation

- Passing Industrial Safety Expertise
2024 - present
Farg'onaazot, Republic of Uzbekistan (Indorama Corporation Pte. Ltd)
Revamp of the urea plant with capacity increase up to 1500 TPD with possible integration into construction of melamine unit BEP2024 - present
Azotremmash, TogliattiManufacturing of urea condenser tube bundle item 11-Е-5А
- Detailed construction documentation (RKD)
- Technical assistance of manufacturing
2023-2024
Nondisclosed4 Urea Units revamp in order to increase capacity to MTPD 3100 and to provide common synthesis section- Main technical solutions development
- Project documentation
- Detailed design documentation
- Equipment design documentation
- License for the set of internals
- Technical assistance at procurement and manufacturing of equipment
2023-2024
Nondisclosed4 Urea Units revamp in order to increase capacity to MTPD 3100 and to provide common synthesis sectionTechnical assistance for construction and installation works2024-present
KuibyshevAzot, Togliatti, RussiaUrea unit No.4. Technical upgrade of the compressor station in the synthesis and distillation building. CO2 compressor unit

- Engineering geological surveys

- Inspection of civil structures for building 652

- Detailed design documentation (partially)
2021-2023
UralChem, Branch Azot
Berezniki, Russia
Technical upgrade of the synthesis column for urea production Detailed design documentation
2020-2021
Nevinnomyssky Azot
Nevinnomyssk, Russia (EuroChem Group)
Technical upgrade of the evaporation unit of workshop No. 2-a of urea production Detailed design documentation
2020-2021
Novomoskovsk-Remstroiservis, Novomoskovsk, Russia Modernization of the pre- decomposition unit item 11-E-2A in the urea unit No. 3 (train 1) of NAK Azot JSC
Detailed design documentation
2020
TECNIMONT RUSSIA,
PJSC KuibyshevAzot
Urea production unit - Detail design development (civil, electrical, HVAC sections)
- Adaptation of detail design to Russian norms and regulations
2022
KuibyshevAzot, Togliatti, Russia Technical modernization of urea plant №4 - Project development
- Detail design development

2018-2019

Novgorodsky GIAP

Veliky Novgorod, Russia

Urea unit № 6 modernization aimed at capacity increase to 2050 TPD (Acron site) - Main technical solutions development
- Authority Package documentation
- Detail design documentation

2021

Urea granulation unit with capacity 2000 TPD (Acron site) - Project documentation
- Detail design documentation

2018-2020

New urea production unit №6 with capacity 600 TPD (Acron site)

- Project documentation
- Detail design documentation

2018

Urea unit №5 modernization aimed at capacity increase to 1250 TPD (Acron site)

- Project documentation
- Detail design documentation

2017

KuibyshevAzot, Togliatti, Russia

Stamicarbon, The Netherlands

Urea production unit with capacity 1500 TPD (at KuibyshevAzot site)

- Adaptation of licenser’s documentation on ISBL facilities to Russian norms and regulations,

- BEP for urea production OSBL facilities

- Project documentation

2017 - 2019

KuibyshevAzot, Togliatti, Russia

Technical modernization of urea unit № 4 (evaporation, hydrolysis and desorption sections)

- Detail design documentation

2016-2017

Minudobreniya, Perm,

Russia

Stamicarbon, The Netherlands

Urea production unit modernization aimed at capacity increase to 2700 TPD, new prilling tower construction

- Adaptation of licenser’s basic engineering package to Russian norms and regulations,

- BEP for prilling tower

- Project documentation

2015-2019

Minudobreniya, Perm, Russia Urea production unit modernization aimed at capacity increase to 2700 TPD, new prilling tower construction Detail design documentation

2015-2019

Togliattiazot, Togliatti, Samara, Russia

Urea production unit and new prilling tower construction (capacity 2200 TPD) at TogliattyAzot site

Adaptation of licenser’s basic engineering package to Russian norms and regulations

2015-2016

Authority package development (including prilling tower and handling system)

2019

Detailed design documentation

2020

Field supervision

2018-2023

PhosAgro-Cherepovets

Cherepovets, Russia

Urea granulation unit, capacity 1500 TPD

- Project documentation
- Detail design documentation

2014-2017

Technical modernization of urea production unit № 2 aimed at capacity increase to 1650 TPD

- Project documentation

- Detail design documentation

- Technical assistance for equipment manufacturing

2014-2016

EuroChem,

NAK Azot,

Novomoskovsk,

Russia

Technical modernization of urea production unit № 2 aimed at capacity increase to 1500 TPD

- Project documentation
- Detail design documentation

2013-2017

Technical modernization of urea plant № 3 (second line) with capacity increase to 1450 TPD

- Project documentation
- Detail design documentation

2013-2016

UAN production unit on the basis of urea production plant № 2 (capacity 1200 TPD)

- Project documentation
- Detail design documentation

2013-2014

Revamp of urea unit №2 (gas vent elimination)

- Project documentation
- Detail design documentation

2012-2015

32,5% urea solution production unit (capacity 100000 TPY) including urea solution treatment unit on the basis of urea plant № 2 evaporation unit

- Project documentation
- Detail design documentation

2011-2015

Chemoproject,

Czech Republic

AZOMURES S.A. plant' s prilling tower modernization aimed to capacity increase from 900 to 1425 TPD, keeping the tower´s height and ensuring the same quality level

- Acting as general design contractor

- Development of technical solutions

2012

Acron

Velikiy Novgorod, Russia

Urea production units (№1-4) revamping aimed to capacity increase up to 2000 TPD and feedstock / energy saving

- Project documentation
- Detail design documentation

2009-2016

Urea synthesis unit revamp (№5)

- Project documentation
- Detail design documentation

2013-2014

Azot,

Kemerovo, Russia

Urea production unit revamp with high speed drum granulator installation

- Project documentation
- Detail design documentation

2011-2013

Kuibyshev Azot,

Togliatti, Russia

Acid ammonia recovery unit downstream urea unit absorption tower

- Project documentation
- Detail design documentation

2011-2012

EuroChem, NAK Azot,

Novomoskovsk,Russia

Technical modernization of evaporation unit № 5 for urea production unit №2 (capacity 1000 TPD)

- Project documentation
- Detail design documentation

2011-2012

Acron,

Veliky Novgorod,Russia

Computer process simulator for personal training and knowledge assessment

- Computer-generated technological simulator for urea production assembly №5

2011-2012

Evaporation system for urea production unit and prilling tower modernization with capacity increase

- Detail design documentation

2011-2013

Maxam-Chirchik,

Chirchik,

Uzbekistan

Modernization and technical upgrading of urea unit

- Project documentation
- Detail design documentation

2010-2012

EuroChem, NevAzot

Nevinnomyssk, Russia

Modernization of unit №2 (urea plant №2)

- Project documentation
- Detail design documentation

2010-2011

EuroChem, NAK Azot

Novomoskovsk, Russia

IComputer simulator for personnel training and knowledge assessmen

- Computer-generated process simulator of urea production unit

2010-2011

PhosAgro,

Cherepovets, Russia

Urea plant production unit with capacity 1500 TPD, procured by “Chemoproject” (Czech- 

- Project documentation
- Detail design documentation

2010-2012

Design Institute «Salavatgasonephte-himproect»,

Salavat, Republic of Bashkortostan,

Russia

Prilling tower for urea plant №24 of JSC Salavatnefteorgsintez

- Adaptation of licenser’s basic engineering package (“TEC”, Japan) to

Russian norms and regulations

- Project documentation
- Detail design documentation

2010-2011

PhosAgro,

Cherepovets, Russia

Computer simulator for personnel training and knowledge assessment

- Computer-generated process simulator for urea production unit

2010-2011

Revamp of urea synthesis evaporation unit

- Project documentation
- Detail design documentation

2010

Kuibyshev Azot, Togliatti, Russia

Prilling tower revamp (urea plant №4)

- Detail design documentation

2010

Revamp of evaporation unit (urea plant №1, unit № 4)

- Detail design documentation

2010

Salavatnefteorgsintez

Salavat, Russia

Prilling towers revamp (urea plant №24)

- Project documentation
- Detail design documentation

2009-2010

Yokogawa Electric,

Moscow

Technical support of control system for CO2 compressor with arrangement of a room for a set of technical devices at JSC NAK Azot

Detailed design documentation 

2009

Acron, Veliky Novgorod, Russia

Design of granulated urea unit based on Rotoform technology

Detailed design documentation

2009

PhosAgro AG - Cherepovetsky Azot, Cherepovets, Russia

Prilling tower for Urea production unit with capacity 1500 TPD

- Project documentation

- Detail design documentation

2008-2012

Togliattiazot,

Togliatti, Samara, Russia

Prilling tower modernization (urea plant)

- Detailed design documentation

2008-2009

Acron, Veliky Novgorod, Russia

Urea unit revamp with capacity increase and energy saving

- Project documentation

- Detail design documentation

2008

Voskresensk Mineral Fertilizers, Voskresensk, Russia

Urea production unit with capacity 600 (1200) TPD

- Project documentation

2008

Acron,

Veliky Novgorod, Russia

Urea unit №5 on the basis of relocated unit

- Project documentation
- Detail design documentation

2007-2011

EuroChem, NevAzot, Nevinnomyssk,

Russia

Prilling tower revamp (urea unit, plant 2A)

- Project documentation
- Detail design documentation

2007-2009

Grodno Azot, Grodno, Belarus

Revamp of urea plant №4 with capacity increase

- Feasibility study

- Architectural and civil design

2007-2012

EuroChem,

NAK Azot, Novomoskovsk, Russia

Urea production unit on the basis of relocatable unit with capacity increase and energy saving

- Project documentation
- Detail design documentation

2007-2010

Revamp of urea plant №3 with capacity increase to 2000 TPD

- Project documentation
- Detail design documentation

2007-2010

Severodonetsk Azot Association, Severodonetsk, Ukraine

Development of basic design for urea unit revamp with capacity increase from 1200 up to 1500 TPD

- Project documentation
- Detail design documentation

2007-2010

EuroChem, NevAzot ,

Nevinnomyssk, Russia

Urea evaporation unit for melamine plant

- Project documentation

- Detail design documentation

2008-2010

TogliattiAzot,

Togliatti, Russia

Technical upgrading of urea unit with integration of melamine unit

- Project documentation

2007 – 2008

KuibyshevAzot,

Togliatti,

Russia

Revamp of urea unit with capacity increase

- Project documentation
- Detail design documentation

2007 – 2008

Salavatnefteorgsintez

Salavat, Russia

Basic design for urea prilling tower

- Project documentation
- Detail design documentation

2007-2008

Severodonetsk Azot Association,

Severodonetsk, Ukraine

Development of basic design for urea unit revamp with capacity increase from 1000 up to 1200 TPD

- Project documentation
- Detail design documentation

2006-2007

AB Achema,

Lithuania

Urea production unit based on relocatable equipment

- Project documentation
- Detail design documentation

- Development of operational manuals

2006-2008

PhosAgro,

Cherepovets, Russia

Revamping of distillation unit with capacity increase (urea production plant)

- Project documentation
- Detail design documentation

2007

EuroChem, NAK Azot, Novomoskovsk, Russia

Computer process simulator for personnel training and knowledge assessment

- Computer process simulator of urea unit

2006-2008

Azot

Cherkassy, Ukraine

Revamping of urea unit М-6

- Project documentation
- Detail design documentation

2006-2010

Salavatnefteorgsintez,

Salavat, Russia

Revamping of urea plant №50

- Project documentation
- Detail design documentation

2006-2008

Fertalge Industries SPA,

Algeria

Urea unit prilling tower

- Project documentation
- Detail design documentation

2002-2005

Dorogobuzh

Verkhnedneprovsky, Smolensk region, Russia

Urea production unit based on relocatable equipment, urea storage unit, prilling tower

- Project documentation

2006-2007

Grodno Azot, Grodno, Belarus

Revamp of urea production unit, installation of recuperator

- Detail design documentation

2006

Acron,

Veliky Novgorod, Russia

Installation of the 5th urea synthesis reactor

- Detail design documentation

2006

NevAzot,

Nevinnomyssk, Russia

Revamp of urea production unit №2

- Project documentation
- Detail design documentation

2006

Melamine production units

Ammoni

Mendeleevsk, Tatarstan, Russia
Melamine unit of 40 000 TPY based on EUROTECNICA HP technology- Adaptation of BEP to RF norms and rules
- Project documentation (specific sections)
 

EuroChem, NevAzot

Nevinnomyssk, Russia

Melamine unit by LURGI AG technology, Germany

- Authority package based on foreign licensor’s basic engineering package

- Detailed design of architectural and civil part

2007-2011

TogliattiAzot,

Togliatti, Russia

Technical upgrading of urea unit with integration of melamine unit

Project documentation

2007-2008

Acron

Veliky Novgorod, Russia

Melamine production unit

- Feasibility study

- Environmental impact assessment

2006-2007

Hydrogen production units

Shchekinoazot,

Shchekino, Russia

Hydrogen recovery unit

- Acting as general design contractor

- Project documentation based on foreign licensor’s basic engineering package

- Detailed design documentation

2010-2011

Ammonium nitrate production units

NondisclosedTechnical upgrade of ammonia nitrate production section

Modification of the flow diagram for preparation of magnesium nitrate solution

- Main technical solutions

- Detailed design documentation

- Assistance at industrial safety expertise
2023-2024
NIUIF, Cherepovets, Russia High speed drum granulation unit for urea and ammonium nitrate based fertilizers production within creation of a pilot unit for granulated fertilizers production
- Main technical solutions development

2018-2019

TomskAzot,
Seversk, Тomskiy region, Russia

Modernization of the existing Drum Granulation unit to shift it to the production of the granulated ammonium nitrate.

Equipment design documentation developmet

2017

KazAzot,

Aktau, Kazakhstan

Ammonia nitrate production unit modernization: HSDG for ammonia nitrate manufacturing

- Main technical solution development

- Detail design documentation

2011-2012

Other production units and infrastructure facilities

NondisclosedEthanolamine Plant Technical Upgrade

- Detailed design documentation

- Passing Industrial Safety Expertise
2024 - present
Nondisclosed
Polypropylene Unit included into a gas chemical complex

- Project documentation

- Adaptation of Detailed design documentation developed by the customer to Russian norms and standards

- Development of Detailed design documentation for the disciplines: OVKV (HVAC), EM (electrical), VK (UG and sewage), APS (AFA), APT (AFF), CC (Communication), CCTV

- Site supervision
2024 - present
Nondisclosed
Technical upgrade of industrial warehouse building with administration and amenity building

- Detailed design documentation

- Assistance at industrial safety expertise
2023 - present

KHOMA-ADGEZIV

Dzerzhinsk, Russia

Energy Center. Engineering systems
Detailed design documentation2022-2023
InvestKhimAgro
Kyshtym, Chelyabinsk region, Russia
Production of ammonium sulfate, NPK, DAP, MAP
- Project documentation
- Detail design documentation
- Field supervision
2022
2022-2023
2022-2024

Tulagiprochem

Tula, Russia

Potassium nitrate production at JSC Nevinnomyssky Azot
Cost estimate documentation (within the scope detailed design)
2022

Sinopec Engineering Group Rus LLC (SINOPEC)

Blagoveshchensk, Russia

Amur Gas Chemical Complex (AGCC) for production of polyethylene and polypropylene (PE, PP, HDPE, LAO), HDPE production plant

Project documentation
2021-2022

NIPIGAS

Tyumen, Russia

AGCC
Pyrolysis plant for mixed raw materials
Detailed design documentation 2021-2022

TECNIMONT RUSSIA

Moscow, Russia

AGCC
Process plants for PE, PP, LAO. Auxiliary systems and shells (cooling towers, flare), substation, operator's room, process buildings and structures)
- Project documentation
- Detailed design in part of plot plan & external water supply and water disposal system
2020-2022
Nondisclosed AGCC
Revamp of the gas supply network
Project documentation 2021
Nondisclosed AGCC
Gas treatment complex (off-site facilities, household building with canteen)
Gas treatment complex (off-site facilities, fire station & gas rescue service)
Gas treatment complex (inter-unit racks)
Project documentation
2020-2022

NAK Azot,

Novomoskovsk, Russia (EuroChem)

Installation of the hydro foamy filtration system (wet scrubbing) at urea plant
- Detailed design documentation
- Installation supervision
- Field supervision
- Technical assistance during commissioning
2020
UralChem
Berezniki, Russia
Technical modernization of nitrate- nitrite salt production unit (building 449) - Main technical solution development
- Development of Design Basis

2018-2019

Volzhskiy Orgsintez

Volzhsky, Volgograd region,Russia

Sodium dimetilditiocarbamate production unit, capacity 15000 tons per year Adaptation of detailed design in EPC process part

2018-2019

Sodium dimetilditiocarbamate production unit, capacity 15000 tons per year

- Project documentation

- Detailed design documentation

2017-2018

FCE plant named after Sverdlov

Dzerzhinsk, Nizhny Novgorod region, Russia
Modernization aimed at construction of a small-scale hexogen production unit (using technology № 2.1.6.100) - Field supervision for construction

2018

Revamp and technical upgrade of unit for equipping of special items, providing production process mechanization and automation
- Field supervision for construction 2018-2019
Salavat Neftekhimremstroy

Salavat, Russia
Development of detailed design for additional heating equipment U-EA 602, U-EA 603, U-EA 604 based on technical documentation M/DK-14-169.00.00.BO. Development of design and estimate documentation for steam tracing change. - Detailed design development
- Estimate documentation
- Field supervision

2018

Korund-Cyan,

Dzerzhinsk, Russia

Second train of sodium cyanide production unit revamp & construction (additional works on SMIS (engineering system monitoring)
- Detail design documentation 2018-2019

Technical upgrade Sodium cyanide production unit. Additional equipment installation (buildings B60, B40)

- Adaptation of licenser’s (EPC) detailed design 2018-2019
Modernization and construction of railway tracks - Project documentation
- Detail design documentation
2018-2019
Modernization of administrative and service building A13- Project documentation
- Detail design documentation
2017
Checking the feasibility to replace design lining of combustion furnace with brick masonry (building B70)
- Detailed design documentation 2017
Technical upgrade of the second train of cooling water unit (Sodium cyanide production unit, building В50)

- Project documentation
- Detail design documentation

2016-2017

Sodium cyanide production unit modernization& construction (2nd train) - Detailed design development

2016

Technical upgrade of Alkali storage (sodium cyanide production unit, building B80)

- Project documentation
- Detail design documentation

2016

Technical upgrade of Sodium cyanide storage

Detail design documentation

2015

Sodium cyanide production unit with capacity of 80000 TPD (first and second line)

- Acting as general design contractor

- Project documentation based on foreign licensor’s basic engineering package (EPC, Germany)

- Detail design documentation

2010-2012

SNF Flopam

Qatar

Acrylamide and polyacrylamide production unit with capacity of 60 000 TPY - Project documentation 2017

QAFCO (Qatar Fertilizer Company),

Qatar

Multipurpose High Speed Drum Granulation (HSDG) Pilot Plant for production of granulated urea with additives, capacity 100 kg per hour

- Technology licensing

- Engineering

2014-2015

PVFCCо,

Phu My I, Ba Ria Vung Tau, Vietnam

High Speed Drum Granulation unit for production of compound fertilizers (capacity 100 kg/h)

- Technology licensing

- Engineering

2014-2015

Kuibyshev Azot,

Togliatti, Russia

Implementation of catalytic purification system, compressor plant, outdoor installations and production buildings (energy efficient cyclohexanol production unit installation project, capacity 140000 TPY)

- Project documentation

- Detail design documentation

2012-2014

Nizhfarm,

Nizhny Novgorod, Russia

Grass-root gel production plant

- Adaptation of licenser’s basic engineering package (“Chemofarm engineering”, Belgrad, Serbia) to Russian norms and regulations

2011

Zawolzhsky Motorny Zawod,

Zavolshye, Russia

Technical upgrading of pipelines for acids solution discharge in heat-treating workshop

- Detailed design documentation

2011

TIKO-Plastic,

Dzerzhinsk, Russia

Expanding capacity of plastic film production plant. Production building construction

- Acting as general design contractor

- Project documentation

- Detail design documentation (architectural and civil documentation)

2010-2011

Nexis,

Perm, Russia

CAN (capacity 10 000 TPY) and magnesium nitrate production units (solid or liquid form)

- Development of Design Basis

- Development of equipment design documentation for non- standardized equipment

2010-2011

AutoVAZ,

Togliatti, Russia

Technical upgrading of liquid ammonia evaporation unit

- Project documentation

- Detailed design documentation

- Correction of current regulations

2010

Zawolzhsky Motorny Zawod

Zavolshye, Russia

Construction of testing station for diesel engines

Turnkey project

2009

TIKO-Plastic,

Dzerzhinsk, Russia

Production unit of polyethylene film and productsActing as general designer
2006-2007

Korund,

Dzerzhinsk,Russia

Lacquer, paint and polyester resins production unit

- Acting as general design contractor

- Detailed design documentation (infrastructure)

2005-2007

Storage and logistic facilities

NondisclosedAmmonia storage technical upgrade
Main technical solutions
2024-present
NondisclosedNitric acid storage with pump house

- Execution of engineering surveys

- Preparation of environmental impact assessment materials, arrangement of public hearings with preparation of final documents

- Project documentation

- Scientific and technical support

- Assistance at state ecological expertise and main state expertise

- Detailed design documentation

- Technical assistance at the stage of equipment and materials procurement
2022-2024












2024-2025
Togliattiazot, Togliatti, Russia (JSC OKHK Uralchem)

Ammonia and mineral fertilizer transshipment complex with capacity of 5 million TPY in Taman seaport

Facilities: compressor station; upstream power distribution panel; sewage pumping station and reservoirs; water reservoir and pump house; control room; KTP.RU. Diesel generator room
- Detailed design documentation
- Field supervision
2022-2023

Metafrax,

Gubaha, Russia

Revamp of urea storage unit unloading section

- Project documentation
- Detail design documentation

2013

Korund

Dzerzhinsk, Russia

Revamp of chlorine storage unit, adaptation to industry safety requirements

- Detail design documentation

2009

Ammoni,

Mendeleevsk, Russia

Construction of urea storage complex

Basic design

2008-2009

Pervouralsky novotrubny zavod

Perovuralsk, Russia

Revamp of liquid ammonia storage unit № 33

- Project documentation
- Detail design documentation

2006-2007

Zawolzhsky Motorny Zavod,

Zavolshye,

Russia

Revamp of sulphuric acid storage unit

Revamp turnkey project

2006-2007

Petrol storage unit

Construction turnkey project

2006

Nizhegorodsky mashinostroitelny zavod,

Russia

Revamping of chlorine storage unit and chlorinator

Revamp turnkey project

2006-2007

Kuibyshev Azot

Togliatti, Russia

Revamp of urea storage unit

- Project documentation
- Detail design documentation

2007

TIKO-Plastic,

Dzerzhinsk, Russia

Feedstock and final product storage facilities

- Project documentation
- Detail design documentation

2006

Pre-design services

NondisclosedHydrogen production unit with capacity of 207 000 nm3/h, which is a chemical-process part of nuclear power engineering plant with high temperature gas-cooled reactors
Pre-design documentation
2023 - present
NondisclosedUrea production unit with capacity of 3150 MTPD by NIIK technology
Investment feasibility study
2022
Nondisclosed
Methanol production unit with capacity of 140,000 MTPY
Investment feasibility study
2022
Nondisclosed
Urea production unit with capacity of 3150 MTPD
Investment feasibility study
2020
Ammoni

Mendeleevsk, Tatarstan, Russia

Melamine production unit with capacity of 40 000 and 60 000 MTPY based on HP technology of EUROTECNICA

Investment feasibility study
2020
Apatit

Cherepovets, Russia
Ammonia production Consulting services on preliminary study of infrastructure facilities of the new ammonia unit and cost estimation for project implementation
2019-2020
Nondisclosed
Ammonia- methanol- urea\other nitrogen products complex Front-end engineering (detailed estimation of overall scope, reviewing options for site location in the territory of the Russian Federation)
2019-2020
Nondisclosed
Ammonia-methanol-urea complex Front-end engineering for 7 options of production complex arrangement at different construction sites
2019
Gaz-Sintez LLC

Vyborg, Russia
5000 MTPD Methanol Plant
- Investment feasibility study
- Declaration of Intent to Invest
2018
ShchekinoAzot

Shchekino, Russia
Ammonia-urea production complex - Feasibility study
- Preliminary Environmental impact assessment
2018
Angarsk Nitrogen Fertilizer Plant

Angarsk, Russia
Technical upgrade of prilling tower air treatment system (unit No.33/36), facility No.1011
Investment feasibility study2018

ORELMETACHIM

Orel, Russia
Ammonia and urea production complexInvestment feasibility study2018
ULGA – company

Safonovo, Smolensk region, Russia
Methanol production unit with capacity 1 000 000 MTPY
Feasibility study2018
Meleuz mineral fertilizers
Meleuz, Russia
Repair of UKL-7-76 No.2 for ammonium nitrate production and shipment. Capacity 450 000 MTPY of ammonium nitrate
Investment feasibility study2018
Askom Methanol production with capacity 5 000 TPD

Methanol production with capacity 2 500 TPD
Investment feasibility study2018
Kazphosphate, Kazakhstan Ammonia production with capacity 1 000 000 TPY Investment feasibility study2018
Air Liquide

Methanol production complex with capacity of 5,000 MTPD

Off-site facilities
Pre-design work
2018
KazAzot, Aktau, Kazakhstan Ammonia\urea and (or) natural gas deep processing products production complexInvestment feasibility study2017
Novgorodsky GIAP, Veliky Novgorod, Russia Ammonia and urea production complex (Dorogobuzh site)- Feasibility study2017
Yakut gas processing complex, Saha, Yakutsk, Russia Preliminary planning and engineering at feasibility study stage (Methanol production unit with capacity 10000 TPD) - Preliminary engineering surveys2017
Preliminary planning and engineering at feasibility study stage (Methanol production unit with capacity 10000 TPD)
- Preliminary environmental impact assessment
- Assistance for ecological expertise approval
2017
Notdisclosed

Construction of ammonia (2700 MTPD) and urea (3500 MTPD) production complex near the port of Ust-Luga and shipping terminals of ammonia (600 000 MTPD) and urea (3 million MTPD)

Feasibility study2017

Amec Foster Wheeler,
Moscow, Russia

Methanol production unit with capacity 10000 MTPD for JSC Yakut Fuel and Energy Company

Investment feasibility study

2017

Nondisclosed

Methanol production unit with capacity of 5,000 MTPD (Ust-Luga)

Investment feasibility study

2017

Nondisclosed
Methanol production unit with capacity of 5,000 TPD (Sabetta)Pre-design work
2017

Baltic Gas Chemical Company, Saint-Petersburg, Russia

M-15 production unit with capacity 15000 TPY for Chayandinskoye field

Development of declaration of intent

2017

CREON-ENERGY,

Moscow, Russia

Methanol production unit with capacity 1mln TPY (Novoroscement site)

- Methanol production unit tie-up for site infrastructure

2017

Jugterminalproect,

Moscow, Russia

Justification of optimal configuration for production complex

Methanol-Ammonia-Urea complex (Taman region)

Pre-design work

2017

Azot,

Kemerovo, Russia

UAN production unit with capacity 150000 TPD

Investment feasibility study

2017

Teсhnoleasing,

Moscow, Russia

Methanol production unit with capacity of 1 mln MTPY (at industrial site Skovorodino, Amur region)

Investment feasibility study

2016

Novgorodsky GIAP

Veliky Novgorod, Russia

- Sulfuric acid production unit

- Wet-process phosphoric acid production unit

- Monoammonium phosphate (MAP) and\or diammonium phosphate (DAP) production unit

Investment feasibility study

2016

Metafrax

Gubakha, Russia

Ammonia-urea-melamine complex

- Reviewing options for site location

- Development of declaration of intention

- Environmental impact assessment

- Conducting public hearings

2015-2016

Norilsk Nickel, Moscow, Russia

Urea production complex (Dudinka site)

Investment feasibility study

2016

Zhilevskaya kremniorganika

Sitne-shchelkanovo, Moscow region, Russia

Ammonia-urea complex

Investment feasibility study

2016

ShchekinoAzot,

Shchekino, Russia

Methanol production unit with capacity 500000 TPY

Connection of the production unit to the industrial site of JSC ShchekinoAzot taking into account location of Ammonia-Urea complex and sulfuric acid production complex

2016

Ammonia-urea complex

- Development of declaration of intent

2016

Placement of Ammonia- Urea complex and sulfuric acid production complex at industrial site of JSC ShchekinoAzot

- Connection of the sulfuric acid production unit and Ammonia- Urea complex to the industrial site of the plant

2015

Grodno Azot, Grodno, Belarus

Nitrogen complex (ammonia-urea-hydrogen)

Investment feasibility study

2015

KuibyshevAzot, Togliatti, Russia

Urea production unit

Investment feasibility study

2014

Sibmetahim,

Tomsk, Russia

Chemicals manufacturing unit (synthetic fluid \ ammonia-urea melamine complex)

Expert economic assessment

2014

CREON-ENERGY,

Moscow,

Russia

Methanol production with capacity 5000 TPD (Ust-Luga region)

Investment feasibility study

2014

Rosstroy,
Novocherkassk, Russia

Ammonia-urea complex

Investment feasibility study

2014

PhosAgro,

Cherepovets, Russia

Granulated urea production unit with capacity 1500 TPD

Preliminary environmental impact assessment

2014

Ammonia production unit AM-3 (capacity 2200 TPD)

Preliminary environmental impact assessment

2013- 2014

National Chemical Company

Russia

Ammonia-urea-methanol complex (Kozmino, Primorsky territory)

- Declaration of intention development

- Preliminary environmental impact assessment

- Conducting public hearings

2013

ICM,

Saint-Petersburg, Russia

Ammonia–Urea complex (Vistino settlement, Kingisepp district, Leningrad region)

- Declaration of intention development

- Preliminary environmental impact assessment

2012-2013

Minudobreniya, Rossosh, Russia

Ammonia-urea complex

Investment feasibility study

2012

ShchekinoAzot,

Shchekino, Russia

Ammonia-urea complex

Investment feasibility study

2010-2011

Hydrogen production unit

Investment feasibility study

2011

Balakovo Mineral Fertilisers (PhosAgro),

Balakovo, Russia

Above-ground ammonia storage unit

Investment feasibility study

2010

Process inspections & scientific engineering

ShchekinoAzot

Shchekino, Russia
Methodological support of urea unit
Development of measurement methods in accordance with GOST 8.563-2009
2024
NondisclosedInspection of urea unit in order to increase urea quality, optimize the consumption coefficients on feedstock, materials and resources

- Process inspection

- Report on inspection results
2024

NAK Azot,

Novomoskovsk, Russia
Engineering and technical measures development to improve efficiency of evaporation units and the existing prilling tower, aimed at reducing concentration of ammonia in the melt and in the air emissions at the urea unit

- Inspection of the evaporation units and prilling tower

- Engineering and technical measures development
2023
RusVinyl

Kstovo, Russia
Certification of measurement technique
Research and confirmation of methodology compliance to established requirements
2023
EuroChem, NevAzot, Nevinnomyssk, Russia Urea production unit 2A inspection to improve synthesis unit efficiency when operating urea unit and melamine production facility jointly Process inspection 2019
Maxam-Chirchik, Chirchik, Uzbekistan Works on inspection of the existing urea unit to develop measures to reduce emissions and pollutant effluents released to environment
Process inspection
2019
EuroChem, NAK Azot, Novomoskovsk, Russia Technical inspection of evaporation unit (urea plant № 2) - Process inspection
- Issuing recommendations
2019
Maxam-Chirchik, Chirchik, Uzbekistan Technical inspection of nitric acid production units АК-72М\АК-72 - Process inspection 2019
Gazprom neftekhim Salavat

Salavat, Russia
Reconstruction of unit 24 GHZ of “Gazprom neftekhim Salavat” Ltd to achieve the daily output of 1,400 TPD
- Process inspection
- Development of design basis
2019-2020

Nevinnomyssky Azot,

Nevinnomyssk, Russia (EuroChem Group AG)
Performance of works on inspection of evaporation unit (urea plant No. 2)
- Process inspection
- Issuing recommendations
2019
Maxam-Chirchik
Chirchik, Uzbekistan
Process inspection of existing АК-72М and АК- 72 nitric acid units
- Process inspection
2019
PMU, UralChem, Perm, Russia Certification of measurement procedures - Evaluation and confirmation of compliance of measurement procedures with the established requirements
- Process measurement procedures to bring them in line with the requirements
2018
Grodno Azot, Grodno, Belarus Complex inspection of Urea 3 plant- Technical inspection 2018
TechnoChimReagentBel, Grodno, Belarus Certification of measurement procedures- Evaluation and confirmation of compliance of measurement procedures with the established requirements
- Modifying measurement procedures to bring them in line with the requirements
2018
Certification of measurement procedures- Evaluation and confirmation of compliance of measurement procedures with the established requirements
- Modifying measurement procedures to bring them in line with the requirements
2017
Union of producers and consumers of automobile chemical goods, Moscow, Russia Certification of measurement procedures- Evaluation and confirmation of compliance of measurement procedures with the established requirements
- Modifying measurement procedures to bring them in line with the established requirements
 2017
PhosAgro, Cherepovets, Russia Revision of existing operating procedures (urea production units № 1 and №2)Implementation of changes in the constant process procedures
 2017
Salavatnefteorgsintez Salavat, Russia Field supervision and technical support during construction and commissioning (modernization of urea production unit №24 granulation section, capacity 1400 TPD)- Sitesupervision
- Technical support during construction
- Commissioning
 2017

Gasprombank, Moscow,
Azot, Kemerovo, Russia

Technical inspection of SDS-Azot urea production facilities

- Process inspection

- Development of measures on operation optimization

- Investment evalutation

2017

Grodno Azot, Grodno, Belarus

Development of technical solutions for distillation gases treatment unit (urea plant №2)

- FEED

2017

EuroChem, NAK Azot,

Novomoskovsk, Russia

Technological inspection of the prilling tower (complex fertilizers production plant, ammonium nitrate unit)

- Process inspection

- Development of engineering technical measures for stabilization of operation of the prilling tower

2016

Azot,

Kemerovo, Russia

Performance of a complex technical audit of the urea plant developed based on Tecnimont technology

- Process inspection

- Development of engineering solutions optimizing technological processes, reducing energy consumption and enhancing reliability of unit operation

- Investment evaluation

2015

EuroChem, NevAzot, Nevinnomyssk,

Russia

Technical inspection (urea plant № 2, urea units 1-3)

- Process inspection

- Development of engineering solutions reducing energy consumption and increasing capacity

- Feasibility study

2015

Research Institute for Mineral Fertilizers (NIUIF), Moscow, Russia

Development of a reference guide on most appropriate technologies used to produce ammonia, mineral fertilizers and mineral acids (sections developed by NIIK: ammonia, NA, AN, CAN, urea, UAN). Scientific and technical support to get the approval of expertise.

Development of an industry reference guide of the best available technologies

2015

EuroChem, NevAzot

Nevinnomyssk, Russia

Performance of a complex process inspection of the urea section at Urea and melamine unit No.2

Performance of inspection in order to develop measures for optimizing process mode of the urea unit during its joint operation with the melamine unit

2014

FNTC Group spol.s r.o,

Czesh Republic

Process inspection of the urea unit at JSC Farg'onaazot

Process inspection

2013

EuroChem, NAK Azot,

Novomoskovsk, Russia

Technological inspection (urea plant №3, second train) aimed at capacity increase to 1600 t/d

Process inspection

2012

32,5% urea solution production unit (capacity 100000 TPY) including urea solution treatment unit on the basis of urea plant № 2 evaporation unit

Process inspection of urea units with justification for creation of a unit

2011

Acron,

Veliky Novgorod, Russia

Process inspection of the urea unit in order to develop measures aimed at capacity increase and energy saving

Process inspection

2010-2011

PhosAgro,

Cherepovets, Russia

Process monitoring of operation of the urea unit in order to reduce ammonia consumption

Process inspection

2009

Severodonetsk Azot Association, Severodonetsk, Ukraine

Process monitoring of operation of the urea unit equipment

- Process inspection

- Development of measures on revamp for capacity increase and energy saving

2008

Minudobreniya,

Perm,

Russia

Process monitoring of operation of the urea unit equipment

- Process inspection

2006

Technical diagnostics & equipment repair services

Togliattyazot

Togliatti, Russia
Inspection of tubes of II stage waste heat boiler item 112, Unit 05A
Eddy current inspection for heat exchanger tubes
2024
Apatit

Cherepovets, Russia
Repair of urea synthesis reactor item R-201 at urea plant ЦПМ-2 (replacement of 4 lining belts)
Development of technical documentation for repair Test of flat steel samples for resistance to intergranular corrosion
2024
Grodno Azot

Grodno, Belarus
Inspection of reactor item R-201 of Urea unit 4
Corrosion inspection
2024
Grodno Azot

Grodno, Belarus
Inspection of heat- exchanging tubes of II stage waste-heat boiler item 112 of Ammonia unit 4
Eddy current testing of heat exchange tubes
2024

NORE,

Novomoskovsk, Russia
Eddy current testing of heat exchange tubes of equipment at Urea unit 3 (1st train) on the territory of JSC NAK Azot
Eddy current testing of heat exchange tubes
2024

NORE,

Novomoskovsk, Russia
Inspection of heat- exchanging tubes of equipment at 1-B unit of JSC Nevinnomyssky Azot
Eddy current testing of heat exchange tubes
2024
Apatit

Cherepovets, Russia
Inspection of heat- exchanging tubes of equipment at Urea unit 1, Urea unit 2, Urea unit 3, Gas separation unit, Sulfuric acid unit
Eddy current testing of heat exchange tubes
2024
Apatit

Cherepovets, Russia
Inspection of reactor item R-201 at Urea unit 2
Corrosion inspection
2024
Helwan Fertilizer Co

Egypt
Repair of 322-R-0 urea synthesis reactor lining
Development of the technical documentation for repair
2024

NAK Azot,

Novomoskovsk, Russia
Lining repairs of synthesis reactor item 6-3 at Urea-2 unit
Repair works
2024

NAK Azot,

Novomoskovsk, Russia
Lining repairs of synthesis reactor item 11-R-1 at Urea-3 (1) unit
Repair works
2024
Togliattyazot

Togliatti, Russia
Inspection of equipment at 08К unit of urea plant

- Corrosion inspection

- Eddy-current testing of heat- exchange tubes

- Installation supervision
2024
KuibyshevAzot

Togliatti, Russia
Inspection of main process equipment at urea unit, repairs works of distillation column item 7/1
- Corrosion inspection
- Repairs works
2024

NAK Azot,

Novomoskovsk, Russia
Replacement of HP stripper in Urea-3 unit (2st train)
Technical assistance at repair works
2024

NAK Azot,

Novomoskovsk, Russia
Corrosion inspection of urea reactor lining state in terms of corrosion, reveal of fluid leak-through location in equipment item 11-R-1 of Urea unit 3 (1st train)
- Performance of inspection
- Reveal of leak
- Technical assistance at repair works
2024

NORE,

Novomoskovsk,Russia
Corrosion inspection of equipment at Urea unit 3 (2nd train) on the territory of NAK Azot
Performance of corrosion inspection
2023 

NORE,

Novomoskovsk,Russia
Eddy current testing of heat exchange tubes of equipment at Urea unit 3 (2nd train) on the territory of NAK Azot
Performance of eddy-current testing
2023
Togliattiazot

Togliatti,Russia
Corrosion inspection of equipment at Urea unit 08К
Performance of corrosion inspection
2023
Grodno Azot

Grodno, Belarus
Eddy-current testing of heat-exchange tubes of tube bundles in evaporators of Cyclohexanone unit 1
Performance of eddy-current testing
2023
Apatit

Cherepovets,Russia
Eddy-current testing of heat-exchange tubes of pressure vessels
Performance of eddy-current testing
2023
Apatit

Cherepovets,Russia
Inspection of reactor item R-201 at ЦПМ-2 urea unit
Corrosion inspection
2023

Minudobreniya,

Rossosh, Russia

Technical inspection of equipment ИТН No.1 and ИТН No.2
Corrosion inspection
2023
Technologia

Dzerzhinsk, Russia
Lining repairs of synthesis reactor item R-901 at urea unit in KAO Azot, Kemerovo
Repair works
2023
Togliattyazot

Togliatti,Russia
Inspection of the bearing shell of dismantled urea synthesis reactor item 14-R-1
Performance of inspection
2022
Apatit

Cherepovets,Russia
Overhaul of HP urea reactor R-201 (repair of neck lining and 3 head nozzles)
Development of the technical documentation and procurement of required metal products
2022
Apatit

Cherepovets,Russia
Eddy-current testing of heat-exchange tubes of pressure vessels
Performance of eddy-current testing
2022
Apatit

Cherepovets,Russia
Inspection of reactor item R-201 at ЦПМ-2 urea unit
Corrosion inspection
2022
Grodno Azot

Grodno, Belarus
Capital repairs of reactor item R-201 at Urea-3 unit
Repair works
2022
Grodno Azot

Grodno, Belarus
Inspection of desorber at cyclohexagone-1 unit
Eddy-current testing of heat-exchange tubes
2022
Grodno Azot

Grodno, Belarus
Inspection of reactor R- 501А at benzene hydrogenation unit
Eddy-current testing of heat-exchange tubes
2022
Grodno Azot

Grodno, Belarus
Inspection of equipment at Urea-4 unit

- Corrosion inspection

- Eddy-current testing of heat-exchange tubes
2022

NAK Azot

Novomoskovsk, Russia
Repairs works of reactor item 6/2 at Urea-2 unit
Repair works
2022

NORE,

Novomoskovsk, Russia
Inspection of equipment at unit No.2-a (melamine) Nevinnomyssky Azot
Corrosion inspection
2022
Nevinnomyssky Azot

Nevinnomyssk,Russia
Eddy-current testing of vessels item 503
Inspection
2022
KuibyshevAzot

Togliatti,Russia
Inspection and repair of urea reactor item 6/1 at Urea unit No.4
Inspection and repairs works
2022
KuibyshevAzot

Togliatti,Russia
Inspection and repairs works of urea synthesis reactor item 6/2 unit No.4
Inspection and repairs works
2022
UralChem, Berezniki, Russia Replacement of nozzles Р1, Р2, Р3, Р4
Replacement of bottom liner
Replacement of three liner belts in the reactor R-901
Repair works
2021
SORFERT

Algeria

Corrosion inspection and eddy-current testing of heat-exchange tubes of equipment at Urea unit

Corrosion inspection and eddy-current testing of high pressure equipment
2021
CASALE
Eddy-current testing of steam turbine condenser at Navoi Azot, Uzbekistan
Eddy-current testing
2021
Azot, Kemerovo, Russia Replacement of nozzles Р1, Р2, Р3, Р4
Replacement of bottom liner in the reactor R-901
Repair works
2021

NAK Azot

Novomoskovsk, Russia
Corrosion inspection of three synthesis reactors at Urea-2 unit
Corrosion inspection
2021

Apatit

Cherepovets, Russia
Eddy-current testing of equipment item 16-Е-73
Eddy-current testing
2021
Apatit
Cherepovets, Russia
Eddy-current testing of heat-exchange tubes of pressure vessels
Eddy-current testing
2021
Grodno Azot, Grodno, Belarus Replacement of two liner belts of cylindrical part of reactor R-201
Repair works
2021
Grodno Azot, Grodno, Belarus Inspection of reactor item R-201 at Urea-3 unit
Repair works 2021

NORE,

Novomoskovsk, Russia
Corrosion inspection of equipment at Urea-3 unit (1st train) on the territory of NAK Azot
Corrosion inspection and eddy- current testing of equipment
2021

Nevinnomyssky Azot

Nevinnomyssk, Russia
Corrosion inspection of reactor item R-1201 (melamine)
Corrosion inspection
2021
FHU Polimer Grzegorz Grzesik

Poland
Execution of repair works for cylinder shells No.4 and 5 of column K-3 at Uralchem site in Berezniki
Repair works
2020
Grodno Azot

Grodno, Belarus
Performance of works on measuring wall thickness of lining pipes in high pressure stripper item E- 201 of Urea unit 3
Performance of inspection
2020
KuibyshevAzot

Togliatti, Russia
Inspection of corrosion and technical condition of heat exchange and tank equipment and elimination of the detected defects at Urea unit No.4
- Performance of inspections
- Repair works
2020

NAK Azot, 

Novomoskovsk,Russia (EuroChem Group AG)

Services on inspection of corrosion and technical condition of the main technological equipment of Urea unit 3 (2nd train)
Performance of inspection2020
Minudobreniia

Rossosh,Russia
Eddy current testing of technical condition of 100% of heat exchange tubes of the syngas heat exchanger upstream methanator item 136-C
Performance of inspection
2020
Togliattyazot

Togliatti,Russia

Eddy current testing of heat exchange tubes of carbamate condensers items 11-Е-5А, 11-Е-5В, 14-Е-5А, 14-Е-5В of Urea unit No.08K

Performance of inspection
2020
Apatit

Cherepovets,Russia
Eddy current testing of heat exchange tubes of pressure vessels at Apatit units and sections
Performance of inspection
2020
Grodno Azot

Grodno, Belarus
Technical assistance and management of works on lining welds repair for urea synthesis reactor item R-201 at Urea unit No.4
Repair works
2020

Nevinnomyssky Azot,

Nevinnomyssk,Russia (EuroChem Group AG)
Technical assistance in repair of heavy fractions distillation column item D-2203 at Unit No.12А
Repair works
2020
Apatit

Volkhov, Russia
Eddy-current testing of heat exchange tubes of СК-800 equipment operating under excessive pressure
Eddy-current testing 2019
EuroChem, NevAzot, Nevinnomyssk, Russia Corrosion and technical inspection of urea synthesis reactors pos. 6/1, 6/4, distillation columns pos. К-7/1, К-7/2, stripper-distillation units pos. Т8/1, 8/2, mixers pos. 5/1, 5/2, 5/3, 5/4, air heaters pos. 20/3 (urea unit №2А) Performance of inspection
2019
MOPCO, Egypt Urea production unit MOPCO-2 corrosion inspection Corrosion inspection 2019
Urea production unit MOPCO-3 corrosion inspection Corrosion inspection 2019
Industrial group Phosphorite, Leningrad region, Кingisepp, Russia Works on inspection of 100% of heat-exchange tubes by eddy-current testing for the heat recovery boiler and air preheaters at Sulfuric acid unit
Eddy-current testing 2019
AlexFert, Egypt Recirculation heater internal surface heat exchanger tubes cleaning by thermo- pneumo-abrasive method Repair works 2019
KuibyshevAzot, Togliatti, Russia Performance of a repair work complex for Urea synthesis reactor item No. 6/1 (registration No.202КВ)
Repair works 2019
EuroChem, NAK Azot, Novomoskovsk, Russia Corrosion and technical inspection of urea production unit 3 main equipment (train 1) Corrosion inspection 2019
Azot, Kemerovo, Russia Works on inspection and replacement of the upper head, cylindrical sections of shells VI and VII of synthesis reactor item R- 901 lining
Repair works 2019
Grodno Azot, Grodno, Belarus Lining repair of synthesis reactor pos. R-201 urea plant №3 Repair works 2019
«Meleuz mineral fertilizers», Meleuz, Russia Repair of heat exchanger tubes of evaporation unit pos. T-10 (ammonium nitrate production unit) Repair works 2019
EuroChem, NevAzot, Nevinnomyssk, Russia Synthesis reactor relining (pos. 6/3, urea plant № 2) Repair works 2019
Apatite, Cherepovets, Russia Eddy-current testing of pressure vessels' heat exchanger tubes Eddy-current testing 2019
Nitrogénművek Zrt., Hungary Urea reactor R202 relining Repair works
2018
Metafrax, Gubakha, Russia Casale SA, Switzerland Ammonia-urea-melamine complex

- Technical assistance during commissioning and guarantee testing of the prilling tower

- Site supervision
2018-2021
PG Phosphorite, Leningrad region, Kingisepp, Russia Eddy-current testing of heat recovery boiler tubes - Eddy-current testing
- Issuing recommendations for repairs
2018
TogliattiAzot, Togliatti, Russia Equipment corrosion and technical inspection (urea plant № 08К) - Corrosion inspection
- Developing recommendations for repairs
2018
UralChem, Berezniki, Russia Corrosion inspection - Corrosion inspection
- Developing recommendations for repairs
2018
Minudobreniya, Rossosh, Russia Eddy current testing - - Eddy current testing
- Developing recommendations for repairs
2018
EuroChem, NevAzot, Nevinnomyssk, Russia Corrosion and technical inspection of plant №2 - Corrosion inspection
- Developing recommendations for repairs
2018
KuibyshevAzot, Togliatti, Russia Relining of distillation column pos. K-7/2 of plant №4 - Repairs 2018
Grodno Azot, Grodno, Belarus Lining repair of synthesis reactor pos. R-201 urea plant №4 - Repairs 2018
TogliattiAzot, Togliatti, Russia Technical repairs manual - Developing recommendations for repairs 2018
Apatite, Cherepovets, Russia Replacement of mass-transfer trays in urea synthesis reactor pos. R-201 in urea plant №2 - Repair works

2018

Eddy-current testing of pressure vessels' heat exchanger tubes - Nondestructive testing
- Issuing recommendations for equipment operating and repairing

2018

Belenergomash, Belgorod, Russia Steel tubes samples intergranular corrosion testing - Testing2018
Apatite, Cherepovets, Russia Eddy-current testing of heat-exchanger tubes working under pressure. - Nondestructive testing
- Issuing recommendations for equipment operating and repairing
2018
EuroChem, NAK Azot, Novomoskovsk, Russia Corrosion and technical inspection of heat exchanger tubes of high pressure stripper pos. E-201 using eddy current method. - Corrosion and technical inspection
- Issuing recommendations for equipment operating and repairing
2017
EuroChem, NevAzot, Nevinnomyssk, Russia Cleaning heat exchangers pos. E-302 and E- 302B (urea production plant № 2А)- Nondestructive testing
- Equipment cleaning by thermo-pneumo- abrasive method
2017
Nitrogénművek Zrt., Pétfürdő Hungary  Corrosion and technical inspection of stripper pos. E-201 (urea production)- Nondestructive testing 2017
Cleaning heat exchanger tubes of stripper pos. E-201 (urea production)- Electro-hydro- mechanical cleaning of heat exchanger tubes2017

«Meleuz mineral fertilizers», Meleuz, Russia

Replacement of old tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit)

- Nondestructive testing

- Development of repair method&technique

- Repair works

2017

EuroChem, NevAzot, Nevinnomyssk, Russia

Technical and corrosion inspection of urea synthesis reactors pos.6/1 and 6/3 (urea plant №2)

- Nondestructive testing

- Recommendations issue for equipment operating and repairing

2017

Minudobreniya,

Rossosh, Russia

Technical inspection of heat- exchanging tubes (plant АM-2)

- Nondestructive testing

- Recommendations issue for equipment repairing

2017

Grodno Azot,

Grodno,

Belarus

Repair of the lining of the synthesis reactor manhole (pos. R-201, urea plant №3)

- Technical documentation development

- Instrumental control of the works performed

2017

Technical and corrosion inspection of urea synthesis reactor pos. R-201 and HP condenser pos. E-202 (urea plant № 3)

- Inspection of corrosion and technical condition

- Development of recommendations for performance of repair

2017

Technical and corrosion inspection of urea synthesis reactor pos. R-201, HP stripper pos. E-201 and HP condenser pos. E-202 (urea plant № 4)

- Inspection of corrosion and technical condition

- Development of recommendations for performance of repair

2017

TogliattiAzot,

Togliatti, Russia

Inspection and development of recommendation for 14-R-1 synthesis reactor relining (urea production unit 08К)

- Inspection by nondestructive testing

- Development of recommendations for performance of repair

2017

Kuibyshev Azot,

Togliatti,

Russia

Corrosion and technical inspection of the main technological equipment of urea production unit

- Nondestructive testing

- Issuing recommendations for repairing

2017

EuroChem, NevAzot, Nevinnomyssk,

Russia

Corrosion inspection and technical supervision of repair works on distillation column for heavy fractions (pos.D-2203, №12А)

- Nondestructive testing

- Recommendations’ issue for repairing

- Quality control of the works performed

2017

PhosAgro Cherepovets, Russia

Eddy-current testing of pressure vessels' heat exchanger tubes

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2017

ZNIGO,

Borisoglebsk, Voronezh region, Russia

Inspection of heat exchanger tubes of reflux condenser (urea production unit)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2017

Sorovskneft,

Tyumen, Russia

Inspection of heat exchanger tubes of S&T oil heaters

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2016

EuroChem, NevAzot, Nevinnomyssk,

Russia

Inspection of heat exchanger tubes (urea plant 2A)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2016

Synthesis reactor dome relining (pos.6/1, plant №2)

- Development of repair method & technique

- Repair works

2016

Grodno Azot,

Grodno,

Belarus

Synthesis reactor relining on 2400 mm height (pos. R-201, Urea-3)

- Development of repair method &technique

- Repair works

2016

Technical and corrosion inspection of HP reactor pos. R-201, HP stripper pos. E-201(Urea-3)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2016

Egyptian Fertilizers Company (EFC), El Ain Sukhna,

Egypt

Relining of urea reactor 322-R-00 (Urea Plant EFC-1 Suez Fertilizers Co.)

- Inspection

- Development of repair method & technique

- Repair works

2016

UralChem, Azot,

Berezniki,Russia

Relining of urea synthesis reactor pos. R-901

- Development of repair method & technique

- Repair works

2016

EuroChem, NAK Azot,

Novomoskovsk, Russia

Corrosion and technical inspection of urea synthesis reactor pos. 6/1 (urea plant №2)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2016

Eddy-current testing of pressure vessels' heat exchanger tubes

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2016

PhosAgro Cherepovets, Russia

Eddy-current testing of heat- exchanger tubes of carbamate condenser pos. Е-202

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2016

«Meleuz mineral fertilizers», Meleuz, Russia

Replacement of old tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit)

- Nondestructive testing

- Development of repair method &technique

- Repair works

2015

Grodno Azot, Grodno, Belarus

Corrosion and technical inspection of synthesis reactor pos.R-201, high-pressure scrubber pos. Е-203, high-pressure stripper pos. Е-201, high-pressure condenser pos.Е-202 (urea unit 3 and urea unit 4)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2015

Nitrogénművek Zrt.,

Pétfürdő

Hungary

Corrosion and technical inspection of stripper pos. E-201 (urea production)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2015

Azot, Cherkassy,

Ukraine

Development of technical documentation to replace three lining belts of cylindrical section of urea synthesis reactor.

- Technical documentation development

- Field supervision during manufacturing of equipment parts

2015

Minudobreniya,

Rossosh, Russia

Inspection of heat exchanging tubes of nitrous gases coolers (nitric acid production unit AK-72, the second stage)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2015

TogliattiAzot,

Togliatti,

Russia

Corrosion and technical inspection of the main technological equipment, pipelines and valves for urea plant №1,2

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2015

PhosAgro Cherepovets, Russia

Eddy-current testing of pressure vessels' heat exchanger tubes

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2015

DniproAZOT, Dneprodzerzhinsk,

Ukraine

Technical inspection of heat exchanger equipment (urea plant №1, urea plant №2)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2014

Grodno Azot,

Grodno,

Belarus

Corrosion inspection of HP urea synthesis reactor pos. R-201, HP stripper pos. E-201, HP scrubber pos. E-203 (urea plant №3)

HP stripper pos. E-201, HP condenser pos. E-202, additional heat exchanger section for preheater pos. E-302 (urea plant №4)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2014

Repair of two lining belts (urea synthesis reactor pos. R-201, urea plant №3)

- Technical documentation development

- Quality control of the works performed.

2014

Azot, Cherkassy,

Ukraine

Corrosion and technical inspection of gas pipelines, HP heat exchangers, tanks and vessels of plant M-6 (synthesis reactor pos. R-201, stripper pos. E-201, condenser pos. E-202, pipelines reg. No 481, 532, 534, 535)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2014

Inspection of heating chamber exchanging tubes (evaporation unit pos. 5/1 and 5/2, plant M-9)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2014

DniproAZOT

Dneprodzerzhinsk,

Ukraine

Corrosion and technical inspection of lining and internal devices (reactor, stripper, condenser, scrubber) for urea plant № 1 and urea plant № 2.

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2014

Kuibyshev Azot,

Togliatti,

Russia

Corrosion and technical inspection of main equipment for urea plant № 4

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2014

EuroChem,

NAK Azot,

Novomoskovsk,

Russia

Corrosion inspection of heat exchange equipment (urea plant №3 (line 2)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2014

Severodonetsk Azot Association,

Severodonetsk,

Ukraine

Corrosion and technical inspection of synthesis reactors internal surface (urea plant M-3)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

Azot, Cherkassy,

Ukraine

Inspection and surveying of reformer and heat exchanger equipment for plant A-5

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

Grodno Azot,

Grodno,

Belarus

Corrosion inspection of urea synthesis reactor for urea plant № 4.

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

Technical inspection of urea synthesis reactor and HP condenser for urea plant № 3

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

Azot, Kemerovo,

Russia

Synthesis reactor repair support services

- Technical documentation development

- Technical inspection

- Quality control of the works performed

2013

PhosAgro Cherepovets, Russia

Eddy-current testing of pressure vessels' heat exchanger tubes

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

EuroChem,

NAK Azot,

Novomoskovsk,

Russia

Corrosion and technical inspection of main technological equipment (urea plant №3 (first line)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

Acron,

Veliky Novgorod,

Russia

Inspection of heat exchanging tubes of condenser pos. Т-506 (urea unit № 5).

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

Corrosion and technical inspection of urea synthesis reactor K-501 (urea unit № 5)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

EuroChem, NevAzot,

Nevinnomyssk,

Russia

Corrosion inspection using eddy current testing of equipment (plant № 2А, 12А)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

AB Achema,

Lithuania

Corrosion inspection of urea synthesis reactor (Ø1600mm) and HP mixer.

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

FNTC Group spol.s r.o,

Czesh Republic

Corrosion and technical inspection of urea plant, ammonium nitrate and nitric acid units for FerganaAzot

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

Azot, Cherkassy,

Ukraine

Corrosion and technical inspection of equipment (urea plant M-2)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

Grodno Azot,

Grodno, Belarus

Inspection of absorber ferromagnetic heat exchanger tubes (ammonia plant № 4)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2013

Razi Petrochemical Company

Iran

Corrosion inspection of urea plant equipment

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2012-2013

Acron,

Veliky Novgorod,

Russia

Corrosion and technical inspection of distillation column pos. 7/2 (urea plant)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2012

Salavat Neftekhimremstroy, Salavat,

Russia

Repair of urea synthesis reactor pos. 6-1, 6-2 (Gas and Chemical plant «Gasprom nephtehim Salavat», plant № 50)

- Corrosion and technical inspection

- Repair works

- Quality control of the works performed

2012

Grodno Azot, Grodno, Belarus

Heat- exchanger tubes inspection (HP equipment of urea plant №3)

- Nondestructive testing

2012

Azot, Cherkassy,

Ukraine

Ferromagnetic heat- exchanger tubes inspection (pos. 1140-C, ammonia plant A-5)

- Nondestructive testing

2012

Corrosion and technical inspection of equipment (urea plant M-6)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2012

Azot, Kemerovo,

Russia

Emergency repair of the lining of synthesis reactor pos.R-901 (urea plant).

- Location of the defect

- Reactor body repairing

- Quality control of the works performed

2012

EuroChem, NevAzot,

Nevinnomyssk,

Russia

Corrosion and technical inspection of equipment (urea plant №2)

- Nondestructive testing

- Issuing recommendations for equipment operating and repairing

2012

Concern Stirol,

Gorlovka,

Ukraine

Complex repair of synthesis reactor pos. R-901 (urea plant, location1)

- Technical documentation development

- Repair works

- Technical inspection of the works performed.

2012-2013

Concern Stirol,

Gorlovka,

Ukraine

Emergency repairing of synthesis reactor pos. R-901 (urea plant, location 1)

- Location of the defect

- Reactor body repairing

- Technical inspection of the works performed

2012-2013

EuroChem,

NAK Azot,

Novomoskovsk,

Russia

Corrosion and technical inspection of critical equipment (urea plant № 3, second line)

- Nondestructive testing

2012

Acron,

Veliky Novgorod,

Russia

Lining replacement of synthesis reactor pos. 6/4 (urea plant)

- Technical documentation development

- Technical inspection

- Quality control of the works performed

2012-2013

UralChem,

Azot, Berezniki,

Russia

Repair of cylindrical section of the lining of synthesis reactor pos. R-901 (urea plant).

- Corrosion and technical inspection of lining

- Technical documentation development

- Technical inspection

- Quality control of the works performed.

2012

Gazprom Neftekhim Salavat

Salavat,

Russia

Lining replacement of the bottom parts of urea synthesis and distillation column (urea plant №50)

- Technical documentation development

2012

Agro-Cherepovets, Cherepovets,

Russia

Corrosion and technical inspection of critical equipment (urea plant).

- Corrosion and technical inspection of lining using NDT

- recommendation issue for equipment operating and repairing

2012

Azot,

Kemerovo,

Russia

Emergency repairing of the heat exchanger cover pos. E-902 (urea plant)

- Location of the defect

- Repair support services

2012

Togliattiazot,

Togliatti, Russia

Repair of the lining of HP stripper of urea plant

- Location of the defect

- Repair support services

2012

Gazprom Neftekhim Salavat,

Salavat,

Russia

Emergency repairing of synthesis reactor 6/1 (urea plant №50).

- Location of the defect

- Repair support services

2011

EuroChem, NAK Azot,

Novomoskovsk,

Russia

Corrosion and technical inspection of critical equipment (urea plant № 3, first line)

- Inspection

2011

Odessa Port Plant,

Yuzhny,

Ukraine

Corrosion and technical inspection of high pressure equipment (urea plant № 2)

- Inspection

2011

Acron, Veliky Novgorod, Russia

Corrosion and technical inspection of urea synthesis reactor (urea plant № 5)

- Inspection

2011-2012

UralChem,

Azot, Berezniki,

Russia

Repair of the lining of urea unit synthesis reactor

- Location of the defect

- Repair support services

2011

EuroChem, NevAzot,

Nevinnomyssk,

Russia

Repair of two lining belts in urea reactor (urea plant 2А)

- Technical documentation development

- Repairing works assistance

- Quality control of the works performed

2011

PhosAgro, Cherepovets, Russia

Cleaning of heat exchanging equipment of evaporation unit (first stage)

- Removing scales from evaporating unit (first stage) tubes by thermo-pneumo-abrasive method

2011

Acron,

Veliky Novgorod,

Russia

Technical guidance for relining of urea synthesis reactor pos. 6/2 of urea plant

- Technical documentation development

- Repairing works assistance

- Quality control of the works performed

2011

EuroChem, NevAzot, Nevinnomyssk,

Russia

Corrosion and technical inspection of equipment (plants №2, №2А)

- Inspection

2011

DniproAZOT

Dneprodzerzhinsk,

Ukraine

Corrosion and technical inspection of equipment (urea plant№1 and urea plant №2)

- Nondestructive testing

- Recommendation issue for equipment operating and repairing

2011-2012

Concern Stirol,

Gorlovka,

Ukraine

Corrosion and technical inspection of sections №1 and №2 (urea plant)

- Inspection

2011

Odessa Port Plant,

Yuzhny,

Ukraine

Corrosion and technical inspection of equipment (urea units №1and № 2)

- Inspection

2010

EuroChem, NevAzot, Nevinnomyssk,

Russia

Corrosion and technical inspection of equipment (urea plant №2)

- Inspection

2010

Technical guidance for partial relining of synthesis reactor 6/3

- Technical documentation development

- Technical guidance of repair works

2010

Acron,

Veliky Novgorod,

Russia

Corrosion inspection of urea synthesis reactor 6/2

- Inspection

2010

Industrial safety expertise

- Diagnostics of urea synthesis reactor 6/1 and 6/4

2010

Cleaning of heat exchanging equipment of MP distillation

- Removing scales from heat exchanging tubes by pneumocurrent method

2010

Azot, Cherkassy,

Ukraine

Corrosion inspection of equipment (urea plant M-2 and M-6)

- Inspection

2010

Relining of upper part of urea synthesis reactor (plant M-2)

- Development of technical documentation

- Repair works

- Quality control of the works performed

2010

PhosAgro, Cherepovets, Russia

Corrosion and technical inspection of urea plant equipment

- Nondestructive testing

2010

DniproAzot, Dneprodzerzhinsk,

Ukraine

Corrosion and technical inspection of equipment (urea plant №1 and urea plant № 2)

- Inspection

2010

EuroChem, NAK Azot, Novomoskovsk,

Russia

Technical guidance of partial relining of synthesis reactor 6/2

- Technical documentation development

- Repairing works assistance

- Quality control of the works performed

2010

Azot, Kemerovo, Russia

Corrosion inspection of urea synthesis reactor

- Inspection

2010

EuroChem, NevAzot , Nevinnomyssk,

Russia

Corrosion and technical inspection (urea units №2 and №2a)

- Inspection

2009

Industrial safety expertise of technical devices (urea plant №2)

- Corrosion and technical inspection

2008

EuroChem, NAK Azot, Novomoskovsk,

Russia

Repair of the lining of synthesis reactor, separator and stripper (urea plant №3)

- Technical assistance

2008

Azot,

Kemerovo,

Russia

Repair of urea synthesis reactor

- Development of technical documentation and technical guidance for urea synthesis reactors repair

2008

DniproAzot,

Dneprodzerzhinsk,

Ukraine

Industrial safety expertise of technical means

- Corrosion and technical inspection

2008

R&D Institute of Measurement Systems,

Nizhny Novgorod,

Russia

Process diagnostic to determine the remaining service life of equipment and pipelines of treatment plants.

- Inspection

2007

Rikor Electronics, Arzamas, Russia

Industrial safety expertise of technical means

- Equipment diagnostics

2007

PhosAgro, Cherepovets, Russia

Industrial safety expertise of pressurized vessels (urea plant)

- Equipment diagnostic and expert conclusion for service life extension of equipment

2007

EuroChem, NevAzot, Nevinnomyssk,

Russia

Repair of two lining belts (urea reactor)

- Development of technical documentation

- Supervising manufacturing of the material

- Technical assistance

- Field supervision

2007

EuroChem, NAK Azot, Novomoskovsk,

Russia

Inspection of stripper tubes by eddy-current method

- Inspection

2007

Corrosion inspection of stripper

- Inspection

2007

FerghanaAzot,

Uzbekistan

Corrosion inspection of critical vessels and pipelines (urea plant)

- Inspection

2007

DniproAzot,

Dneprodzerzhinsk,

Ukraine

Corrosion and technical inspection of HP reactor, stripper, condenser (plant №2)

- Inspection

- Repair procedure development

- Repair works

2007

Equipment procurement

For production complexes

Metafrax, Gubakha, Russia

Ammonia-urea-melamine complex

Equipment procurement for OSBL facilities

2016-2021

Metafrax, Gubakha, Russia

Casale SA, Switzerland

Ammonia-urea-melamine complex

Equipment procurement for prilling tower construction

Ammoni,

Mendeleevsk, Russia

Ammonia- methanol- urea complex

Equipment procurement for OSBL facilities

2010-2015

For ammonia plants

PhosAgro,

Cherepovets, Russia

Ammonia production unit AM-3 (capacity 2200 TPD)

- Equipment procurement for analytical laboratory

2016-2017

For urea plants

NondisclosedUrea plant technical upgrade
Supply of equipment and materials
2024-present
Togliattiazot

Togliatti, Russia
Urea production unit Supply of distribution tubes for stripper
2024-present
Azot

Kemerovo,Russia
Urea production unit
Supply of conversion booster
2024-present
Nondisclosed
Urea production unit Supply of urea grade steel parts
2024
Nondisclosed
Urea production unitEquipment supply (tray for synthesis reactor, accessories for stripper)
2023-2024
OHK UralChem, Azot branch

Berezniki, Russia
Technical upgrade of the synthesis reactor for urea production
- Equipment supply
- Equipment installation
2022

MOPCO, Egypt

Urea production unit

- Equipment supply

- Equipment installation (lining elements of reactor 322R001)
2022

NAK Azot,

Novomoskovsk, Russia
UAN production unit on the basis of Urea-2 unit with capacity of 1200 MTPD
Supply of packaged unit
2020-2021
Azot

Kemerovo,Russia
Urea production unit
Equipment supply (vortex mixer)
2021
Acron, Veliky Novgorod, Russia
Technical upgrade of urea unit
Critical equipment supply
2020
Chambal Fertilizers and Chemicals Limited (CFCL), India
Supply of vortex mixer for urea synthesis reactor in order to save energy, as well as services on equipment installation in the urea synthesis reactor No.1
- Equipment supply
- Equipment installation
2018
Acron, Veliky Novgorod, Russia Urea production unit №6 construction with capacity 600 TPDEquipment procurement2017-2018
Rashtriya Chemicals and Fertilizers Ltd., Mumbai, IndiaUrea units modernization (Thal)

- Equipment supply (set of internals) for urea reactors

- Equipment installation (three sets of internals) for urea reactors
2017-2018
Gujarat Narmada Valley Fertilizers & Chemicals Ltd, IndiaUrea unit modernization Supply and installation of equipment (vortex mixer) for synthesis reactor
2017

KuibyshevAzot, Togliatti, Russia

Technical modernization of urea unit № 4 (evaporation, hydrolysis and desorption sections)

- Equipment procurement

2016-2017

Rashtriya Chemicals and Fertilizers Ltd., Mumbai, India

RCF Trombay V urea unit modernization

- Equipment supply (set of internals) for urea reactor

- Equipment installation (set of internals) for urea reactor

2015 -2016

Casale SA, Switzerland

Urea production unit and new prilling tower construction (capacity 2200 TPD) at TogliattyAzot site

Equipment supply for prilling tower and new urea reactor auxiliary devices

2015-2016

EuroChem, NAK Azot,

Novomoskovsk,Russia

Revamp of urea unit 2 (gas vent elimination)

- Equipment procurement

2012-2015

EuroChem, NAK Azot,

Novomoskovsk,Russia

Technical modernization of the urea production plant №2

- Equipment procurement

2013-2016

32,5% urea solution production unit (capacity 100000 TPY) including urea solution treatment unit on the basis of urea plant № 2 evaporation unit

- Equipment procurement

2013-2015

Nagarjuna Fertilizers and Chemicals Limited,

India

Urea synthesis unit № 2 modernization

- Equipment supply (vortex mixer for synthesis reactor)

2013

Acron,

Veliky Novgorod, Russia

Urea production units (1-4) revamping aimed to capacity increase up to 2000 TPD and feedstock/energy saving

- Equipment procurement

2016

Azot, Cherkassy, Ukraine

Design and procurement of HP stripper pos. E-201 with capacity increase up to 1500 tpd (urea plants M-2)

- HP stripper procurement

2011-2012

Azot,

Kemerovo, Russia

Urea production unit revamping with high speed drum granulator installation

- Equipment procurement

2011-2013

Acron,

Veliky Novgorod, Russia

Evaporation system for urea production unit and prilling tower modernization with capacity increase

- Equipment procurement

2011-2013

Maxam-Chirchik,

Chirchik,

Uzbekistan

Modernization and technical upgrading of urea unit

- Equipment procurement

- Commissioning

2010-2012

UralChem,

Azot, Berezniki, Russia

Urea synthesis reactor modernization

- Set of Internal Devices procurement

- Field supervision

2010

Salavatnefteorgsintez

Salavat, Russia

Prilling towers’ modernization for urea plant №24

- Equipment procurement

- Commissioning

2009-2010

PhosAgro Cherepovets,

Russia

Prilling tower for urea production (capacity of 1500 TPD)

- Equipment procurement

2008-2012

Acron,

Veliky Novgorod,

Russia

Urea unit №5 on the basis of relocated unit

- Equipment procurement

2007–2011

EuroChem,

NAK Azot, Novomoskovsk,

Russia

Revamp of urea plant №3 with capacity increase to 2000 TPD

- Material procurement

2007–2010

Severodonetsk Azot Association, Severodonetsk, Ukraine

Urea unit revamp with capacity increase from 1200 up to 1500 TPD

- Equipment procurement

2007–2010

EuroChem, NevAzot ,

Nevinnomyssk,

Russia

Urea evaporation unit for melamine plant

- Equipment procurement

2008 – 2010

KuibyshevAzot,

Togliatti,

Russia

Revamp of urea unit with capacity increase

- Equipment procurement

- Field supervision

2007–2008

Severodonetsk Azot Association,

Severodonetsk,

Ukraine

Urea unit revamp with capacity increase from 1000 up to 1200 TPD

- Equipment procurement

2006-2007

PhosAgro,

Cherepovets,

Russia

Revamping of distillation unit with capacity increase (urea production plant)

- Equipment procurement

2007

Salavatnefteorgsintez

Salavat, Russia

Revamping of urea plant №50

- Equipment procurement

2006 –2008

Azot, Kemerovo,

Russia

Revamp of urea synthesis unit

- Procurement of internals into reactor pos. R-101

2006

Grodno Azot, Grodno, Belarus

Revamp of urea production unit, installation of recuperator

- Equipment procurement

- Field supervision

2006

Acron,

Veliky Novgorod,

Russia

Installation of the 5th urea synthesis reactor

Equipment procurement

2006

NevAzot,

Nevinnomyssk,

Russia

Revamping of urea production plant №2

- Equipment procurement

- Field supervision

2006

Azot, Kemerovo,

Russia

Revamp of urea synthesis unit

- Procurement of internals into reactor pos. R-101

- Field supervision

2006

For ammonia nitrate production units

KazAzot,

Aktau, Kazakhstan

Ammonia nitrate production unit modernization: HSDG for ammonia nitrate manufacturing

Equipment procurement

2011-2012

For storages

Pervouralsky novotrubny zavod, Perovuralsk,

Russia

Revamp of liquid ammonia storage unit № 33

Equipment procurement

2006-2007

Zawolzhsky Motorny Zavod,

Zavolshye, Russia

Revamp of sulphuric acid storage unit

Equipment supply for turnkey project

2006-2007

Petrol storage unit

Equipment supply for turnkey project

2006

Nizhegorodsky mashinostroitelny zavod,

Russia

Revamping of chlorine storage unit and chlorinator

Equipment supply for turnkey project

2006-2007

For other facilities

NAK Azot,

Novomoskovsk, Russia ( MHK EuroChem)
Wet scrubbing unit for dusty air – foam hydrofilter of urea unit
Equipment procurement 2019

QAFCO (Qatar Fertilizer Company),

Qatar

Multipurpose High Speed Drum Granulation (HSDG) Pilot Plant for production of Granulated Urea with additives, capacity 100 kg per hour

- Equipment procurement

- Installation supervision,

- Commissioning

2014-2015

PVFCCо,

Phu My I, Ba Ria Vung Tau, Vietnam

HSDG unit for production of compound fertilizers (capacity 100 kg/h)

- Equipment procurement

- Installation supervision

- Commissioning

2014-2015

Zawolzhsky Motorny Zavod,

Zavolshye, Russia

Project development and construction of testing station for diesel engines

Equipment supply for turnkey project

2009

For equipment repair works

NAK Azot,

Novomoskovsk, Russia ( MHK EuroChem)
Repair of Urea reactor item 11-R-1 at Urea-3(1) unit
Supply of lining elements
2024

NAK Azot,

Novomoskovsk, Russia ( MHK EuroChem)
Repair of Urea reactor item 11-R-1 at Urea-3(1) unit
Supply of lining elements
2024

Nevinnomyssky Azot,

Nevinnomyssk, Russia ( MHK EuroChem)
Repair of cylindrical section of the lining of synthesis reactor item 6/1, unit No.2Equipment procurement
2021

Meleuz mineral fertilizers

Meleuz, Russia

Replacement of old tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit AS-72М)

Steel structures supply for repairs works

2017

Grodno Azot, Grodno, Belarus

Repair of the lining of the synthesis reactor neck (item R-201, Urea-3 unit)

Steel structures supply for repairs works

2017

Egyptian Fertilizers Company (EFC), El Ain Sukhna,

Egypt

Lining repairs works at urea reactor item 322-R-00

Steel structures supply for repairs works

2016

Meleuz mineral fertilizers, Meleuz, Russia

Replacement of old tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit)

Equipment procurement

2015

Grodno Azot, Grodno, Belarus

Repair of two lining belts (urea synthesis reactor pos. R-201, urea plant №3)

Steel structures supply for repairs works

2014

Corrosion inspection of urea synthesis reactor (urea plant №4)

Steel structures supply for repairs works

2013

Azot, Kemerovo, Russia

Synthesis reactor repair support services

Steel structures supply for repairs works

2013

Concern Stirol,

Gorlovka, Ukraine

Complex repair of synthesis reactor pos. R-901 (urea unit, location1)

Steel structures supply for repairs works

2012-2013

Acron,

Veliky Novgorod, Russia

Lining replacement of synthesis reactor pos. 6/4 (urea unit )

Steel structures supply for repairs works

2012-2013

UralChem, Azot

Berezniki, Russia

Repair of cylindrical section of the lining of synthesis reactor pos. R-901 (urea unit)

Steel structures supply for repairs works

2012

EuroChem, NevAzot,

Nevinnomyssk, Russia

Repair of two lining belts in urea reactor (urea unit 2А)

Steel structures supply for repairs works

2011

Acron,

Veliky Novgorod, Russia

Set of internal devices installation into urea plant reactor №5

Steel structures supply for repairs works

2011

Technical guidance for relining of urea synthesis reactor pos. 6/2 of urea plant

Steel structures supply for repairs works

2011

Azot, Cherkassy,

Ukraine

Relining of upper part of urea synthesis reactor (plant M-2)

Steel structures supply for repairs works

2010

EuroChem, NAK Azot, Novomoskovsk,

Russia

Technical guidance of partial relining of synthesis reactor 6/2

Steel structures supply for repairs works

2010

EuroChem, NevAzot, Nevinnomyssk,

Russia

Repair of two lining belts (urea reactor)

- Supervising manufacturing of material

2007

Kuibyshev Azot, Togliatti, Russia

Revamping of urea unit storage

- Field supervision

- Commissioning works

2007

Fertalge Industries SPA,

Algeria

Prilling tower for urea production

- Field supervision

2002-2005