Customer
|
Project
|
Scope of services of NIIK
|
Year
|
EPC/Turnkey projects
|
Metafrax Gubakha, Russia
|
Ammonia-urea-melamine complex
|
Construction of OSBL facilities on a turn-key basis (project documentation and detail design, equipment supply, construction and installation, commissioning works)
|
2016-2021
|
Apatit
Cherepovets, Russia | UKL-7-76M production of non-concentrated nitric acid with a capacity of 135 000 MTPY | Turnkey construction (project documentation and detailed design documentation, equipment supply, construction and installation, commissioning works) | 2017-2020 |
PhosAgro,
Cherepovets,
Russia Mitsubishi Heavy Industries,
Japan
|
Ammonia production unit AM-3 (capacity 2200 TPD)
|
Turn-key project for construction of a new analytical laboratory of ammonia production unit
|
2016-2017
|
Ammoni Mendeleevsk,
Tatarstan,
Russia
|
Ammonia-methanol-urea complex
|
Construction
of OSBL facilities on a turn-key basis (project documentation and detailed design documentation, equipment supply, construction and installation, commissioning works)
|
2010-2015
|
Zawolzhsky Motorny Zawod Zavolshye,
Russia
|
Construction of testing station for diesel engines
|
Construction
Turnkey project
|
2009
|
Zawolzhsky Motorny Zawod Zavolshye,
Russia
|
Revamp of sulphuric acid storage unit
|
Revamp Turnkey project
|
2006-2007
|
Petrol storage unit
|
Construction Turnkey project
|
2006
|
Nizhegorodsky machine-building plant,
Russia
|
Revamping of chlorine storage unit and chlorinator
|
Revamp Turnkey project
|
2006-2007
|
Design engineering
|
Production complexes
|
Nondisclosed
| Ammonia-Urea
complex | Adaptation of Licensors' Basic Engineering Packages
to Russian norms and standards
| 2020 |
Nondisclosed |
Ammonia-urea complex
|
Adaptation of licenser’s basic engineering package to Russian norms and regulations
|
2020
|
China National Chemical
Engineering Co. (CNCEC),
Ltd., China (Shchekinoazot site)
|
Ammonia-Urea Complex
|
- Adaptation of the Licensors’ BEPs to RF norms and regulations
- Project documentation for the complex (ISBL/ OSBL facilities)
| 2019-2021
|
- Adaptation of detail
design documentation developed
by Customer to RF norms and regulations |
2022 |
- Repeated Project documentation |
2024 |
Field supervision and technical assistance
|
Present |
Metafrax, Gubakha, Russia, Casale S.A., Switzerland
|
Ammonia-urea-melamine complex
|
- Basic design for OSBL
facilities (Melamine 2 unit)
- Correction of BEP for prilling tower with capacity 1150 TPD at operation of Melamine-2 unit |
2018-2019
|
Metafrax, Gubakha, Russia
|
Ammonia-urea-melamine complex
|
-
Development of detail design for site arrangement
-
Adaptation of licenser’s basic
engineering package to Russian norms and regulations
-
Authority package development (ISBL/OSBL)
- Construction of OSBL facilities on a turn-key basis (detail design, equipment supply,
construction and installation, commissioning works)
|
2016-2021
|
Metafrax, Gubakha, Russia
Casale S.A.,
Switzerland
|
Ammonia-urea-melamine complex
|
-
Development
of basic design for OSBL facilities and prilling tower
-
Detail
design (ISBL facilities’
architectural and civil documentation)
|
2016-2021
|
Ammoni,
Mendeleevsk,
Tatarstan,
Russia
|
Ammonia-methanol-urea complex
|
-
Development of authority package (ISBL/OSBL)
- Construction of OSBL facilities on a turn- key basis (detail
design, equipment
supply, construction and installation, commissioning works)
|
2010-2015
|
Ammoni,
Mendeleevsk,
Tatarstan,
Russia
Mitsubishi Heavy
Industries, Ltd. (MHI), Japan
|
Ammonia-methanol-urea
complex
|
-
Adaptation of licenser’s
documentation on ISBL facilities to Russian norms and regulations,
-
Detail design (architectural and civil documentation
for urea production
ISBL facilities)
-
Licenser’s equipment certification for ISBL facilities
|
ICM,
Saint-Petersburg,
Russia
|
Ammonia-urea complex (Vistino, Kingisepp, Leningrad region)
|
-
Adaptation of BE/FEED licensor’s documentation to Russian norms and Regulations
-
Development of authority package (ISBL/OSBL)
|
2013-2015
|
Ammonia production units
|
JSC NAK Azot,
Novomoskovsk, Russia | Construction
of isothermal storage
for liquid ammonia with capacity 10,000 tons | Main technical solutions development | 2023 |
Giammarco Vetrocoke Srl, Italy
|
CO2 removal system modernization (ammonium production unit designed by TEC) aimed at capacity increase up to 2000 TPD at Perm mineral fertilizer site.
|
Project documentation |
2018-2019
|
Haldor Topsoe (HTAS), Denmark
|
Ammonia unit modernization aimed at capacity
increase up to 2000 TPD at Uralchem site (Kirovo-Chepetsk, Kirov region)
|
-
Adaptation of design basis to Russian norms and regulations
-
Development of authority package including documentation for CO2 removal unit
|
2015-2017
|
Tulagiprochem Tula, Russia
|
Ammonia
production unit and liquid ammonia
storage unit (Kingisepp Plant)
|
Development of authority package for OSBL facilities
|
2014-2015
|
PhosAgro,
Cherepovets, Russia
|
Ammonia production unit AM-3 (capacity 2200 TPD)
|
-
Adaptation of licenser’s basic engineering package to Russian norms
and regulations
- Project Documentation
|
2013-2017
|
PhosAgro,
Cherepovets, Russi
Mitsubishi Heavy Industries,Japan
|
Ammonia production unit AM-3 (capacity 2200 TPD)
|
- Detail design (architectural and civil parts)
-
Turnkey project for construction of a new analytical laboratory for ammonia production unit
|
2014-2017
2016-2017
|
Linde Engineering RUS
(representative office
of LINDE AG, Germany)
|
Ammonia production unit
|
-
Adaptation
of licenser’s basic engineering package
to Russian norms and regulations
- Project documentation
- Detail design development
|
2013-2017
|
Nevinnomyssky Azot, Nevinnomyssk, Russia
|
Commercial grade aqua ammonia production unit (unit No.11)
|
- Project documentation - Detailed design documentation
|
2013-2014
|
Nitric acid units
|
Apatit JSC (JSC PhosAgro), Cherepovets, Russia |
UKL-7-76M production of non-concentrated nitric acid with a capacity of 135 000 mtpy |
Turnkey construction (design and detailed design documentation, equipment supply,
construction and installation, commissioning) |
2017-2020 |
Methanol units
|
GPN-Razvitie
Saint-Petersburg, Russia | Gas Chemical Complex for production of methanol | - Technical assistance - Project documentation audit | 2022-2023 |
Nondisclosed | Methanol unit. (Kingisepp). Water treatment unit | Project documentatio | 2022 |
Not disclosed
(Confidential Information)
|
Methanol unit
|
- Adaptation of the Licensor's FEED package to the rules and regulations of the Russian Federation - Development of FEED parts in the scope of the construction part and the HVAC system - Project documentation
|
2020-2021
|
Hyundai Engineering Co., Ltd. (HEC)
| Methanol unit | Adaptation of the Licensor's FEED package to RF norms and regulations
| 2019-2021 |
OOO «G T M 1»,
Volgograd, Russia
|
Methanol unit |
- Adaptation of the Licensor's FEED package to RF norms and regulations
- Project documentation
|
2019-2023
|
Metafrax,
Gubaha, Russia
|
Technical modernization of methanol production unit (integration within an ammonia-methanol-urea complex)
|
- Detailed design documentation |
2019 |
Technolizing, Skovorodino, Russia
|
Methanol production unit with capacity 3000 TPD
|
Adaptation of licenser’s basic engineering package to Russian norms and regulations
|
2018-2020
|
Assistance of engineering surveys
|
2018-2021
|
Engineering & Consulting services on organizational issues related to public hearings preparation
Consulting services
on construction issues
|
2021 2022
|
Nizhnekamskneftekhim, Nizhnekamsk, Tatarstan
|
Methanol production with capacity 500 000 TPY
|
- Adaptation of Licensor’s BEP to RF norms and regulations - Project documentation
|
2021
|
Metafrax,
Gubaha, Russia
Casale SA, Switzerland
|
Technical upgrade of Methanol production unit including integration to ammonia-urea-methanol complex
|
- Adaptation of licenser’s
basic engineering
package to Russian
norms and regulations
- Detailed design of civil part
|
2018-2020
|
ShchekinoAzot,
Shchekino,
Russia
|
Methanol production unit with capacity 500 000 TPY
|
- Adaptation of licenser’s basic engineering package to Russian norms and regulations
- Project documentation
- Detail design development
|
2018-2021
|
- Field supervision
|
2019-2022
|
Baltic Gas Chemical Company, Saint-Petersburg, Russia
|
Baltic methanol production plant
|
-
Adaptation of licenser’s basic engineering package to Russian norms and regulations
- Project documentation Detailed design documentation-
|
2015-2021
|
Urea production units
|
Nondisclosed | Urea Plant technical
upgrade | EP-contract
| 2024 - present |
Nondisclosed | Urea Plant technical
upgrade in order to switch to 2-year
non-stop operation | - Project Documentation (TX (process) part) - Detailed design documentation | 2024 - present |
KuibyshevAzot
Togliatti,
Russia
| Urea Unit No. 4 technical upgrade in order to improve product quality and stabilize
the operation of the pre-evaporation stage and evaporation units
| - Detailed design documentation - Passing Industrial Safety Expertise
| 2024 - present
|
Farg'onaazot, Republic of Uzbekistan (Indorama Corporation Pte. Ltd)
| Revamp of the urea plant with capacity
increase up to 1500 TPD with possible integration into construction of melamine unit |
BEP | 2024 - present
|
Azotremmash, Togliatti | Manufacturing of urea condenser tube bundle item 11-Е-5А
| - Detailed construction documentation (RKD) - Technical assistance of manufacturing
| 2023-2024 |
Nondisclosed | 4 Urea Units revamp in order to increase capacity to MTPD 3100 and to provide common synthesis section | - Main technical solutions development - Project documentation - Detailed design documentation - Equipment design documentation - License for the set of internals - Technical assistance at procurement and manufacturing of equipment | 2023-2024 |
Nondisclosed | 4 Urea Units revamp in order to increase capacity to MTPD 3100 and to provide common synthesis section | Technical assistance for construction and installation works | 2024-present |
KuibyshevAzot, Togliatti,
Russia | Urea unit No.4. Technical upgrade of the compressor station in the synthesis and distillation building. CO2 compressor unit
| - Engineering geological surveys
- Inspection of civil structures for building
652 - Detailed design documentation (partially)
| 2021-2023 |
UralChem, Branch Azot Berezniki, Russia |
Technical upgrade of the synthesis column for urea production
|
Detailed design documentation
|
2020-2021
|
Nevinnomyssky Azot Nevinnomyssk, Russia
(EuroChem Group)
|
Technical upgrade of the evaporation unit of workshop No. 2-a of urea production
|
Detailed design documentation
|
2020-2021
|
Novomoskovsk-Remstroiservis, Novomoskovsk, Russia
|
Modernization
of the pre- decomposition unit item 11-E-2A in the urea unit No. 3 (train 1) of NAK Azot JSC
|
Detailed design documentation
|
2020
|
TECNIMONT RUSSIA,
PJSC KuibyshevAzot |
Urea production unit
|
- Detail design development (civil, electrical, HVAC sections)
- Adaptation of detail design to Russian norms and regulations
|
2022 |
KuibyshevAzot, Togliatti, Russia
|
Technical modernization
of urea plant №4
|
- Project development
- Detail design
development
|
2018-2019
|
Novgorodsky
GIAP Veliky Novgorod, Russia
|
Urea unit № 6 modernization aimed at capacity increase to 2050 TPD (Acron site)
|
- Main technical solutions development
- Authority Package documentation
- Detail design documentation |
2021
|
Urea granulation unit with capacity 2000 TPD (Acron site)
|
- Project documentation
- Detail design documentation |
2018-2020
|
New urea production unit №6 with
capacity 600 TPD (Acron site)
|
- Project documentation - Detail design documentation
|
2018
|
Urea unit №5 modernization aimed at capacity increase
to 1250 TPD (Acron site)
|
- Project documentation - Detail design documentation
|
2017
|
KuibyshevAzot, Togliatti, Russia
Stamicarbon, The Netherlands
|
Urea production unit
with capacity 1500 TPD (at KuibyshevAzot site)
|
-
Adaptation of licenser’s documentation on ISBL facilities to Russian norms and regulations,
-
BEP for urea production OSBL facilities
-
Project documentation
|
2017 - 2019
|
KuibyshevAzot,
Togliatti, Russia
|
Technical
modernization of urea unit № 4 (evaporation, hydrolysis and desorption
sections)
|
- Detail design documentation
|
2016-2017
|
Minudobreniya, Perm,
Russia
Stamicarbon, The Netherlands
|
Urea production unit
modernization aimed at capacity increase to 2700 TPD, new prilling tower construction
|
-
Adaptation of licenser’s
basic engineering package to Russian norms and regulations,
-
BEP for prilling tower
- Project documentation
|
2015-2019
|
Minudobreniya, Perm,
Russia
|
Urea production unit modernization aimed at capacity increase to 2700 TPD, new prilling tower construction
|
Detail design documentation |
2015-2019
|
Togliattiazot,
Togliatti, Samara, Russia
|
Urea production unit
and new prilling tower construction (capacity 2200 TPD) at
TogliattyAzot site
|
Adaptation of licenser’s basic engineering package to Russian norms and
regulations
|
2015-2016
|
Authority package development (including prilling tower and handling system) |
2019
|
Detailed design documentation |
2020
|
Field supervision
|
2018-2023
|
PhosAgro-Cherepovets Cherepovets, Russia
|
Urea
granulation unit, capacity 1500 TPD
|
- Project documentation - Detail design documentation
|
2014-2017
|
Technical
modernization of urea production unit № 2 aimed at capacity increase to
1650 TPD
|
- Project documentation - Detail design documentation - Technical assistance for equipment manufacturing
|
2014-2016
|
EuroChem,
NAK Azot,
Novomoskovsk,
Russia
|
Technical
modernization of urea production unit № 2 aimed at capacity increase to
1500 TPD
|
- Project documentation - Detail design documentation
|
2013-2017
|
Technical
modernization of urea plant № 3 (second
line) with capacity increase to 1450
TPD
|
- Project documentation - Detail design documentation
|
2013-2016
|
|
UAN production
unit on the basis of urea production
plant № 2 (capacity 1200 TPD)
|
- Project documentation - Detail design documentation
|
2013-2014
|
Revamp of urea unit
№2 (gas vent elimination)
|
- Project documentation - Detail design documentation
|
2012-2015
|
32,5% urea
solution production unit (capacity 100000 TPY) including urea
solution treatment unit on the basis of urea plant № 2 evaporation unit
|
- Project documentation - Detail design documentation
|
2011-2015
|
Chemoproject,
Czech Republic
|
AZOMURES S.A.
plant' s prilling tower modernization aimed to capacity increase from 900 to
1425 TPD, keeping the tower´s height and ensuring the same quality level
|
-
Acting as general design contractor
-
Development of technical solutions
|
2012
|
Acron Velikiy
Novgorod, Russia
|
Urea production
units (№1-4) revamping aimed to
capacity increase up to 2000 TPD and
feedstock / energy saving
|
- Project documentation - Detail design documentation
|
2009-2016
|
Urea synthesis unit
revamp (№5)
|
- Project documentation - Detail design documentation
|
2013-2014
|
Azot,
Kemerovo, Russia
|
Urea production
unit revamp with high speed drum granulator installation
|
- Project documentation - Detail design documentation
|
2011-2013
|
Kuibyshev Azot,
Togliatti, Russia
|
Acid ammonia
recovery unit downstream urea unit absorption tower | - Project documentation - Detail design documentation
|
2011-2012
|
EuroChem, NAK Azot,
Novomoskovsk,Russia
|
Technical
modernization of evaporation unit № 5 for urea production unit №2
(capacity 1000 TPD)
|
- Project documentation - Detail design documentation
|
2011-2012
|
Acron,
Veliky Novgorod,Russia
|
Computer process simulator for
personal training and knowledge assessment
|
-
Computer-generated technological simulator for
urea production assembly №5
|
2011-2012
|
Evaporation system for urea production unit and prilling tower modernization with capacity increase
|
- Detail design documentation
|
2011-2013
|
Maxam-Chirchik,
Chirchik,
Uzbekistan
|
Modernization and
technical upgrading of urea unit
|
- Project documentation - Detail design documentation
|
2010-2012
|
EuroChem, NevAzot Nevinnomyssk, Russia
|
Modernization of unit №2 (urea plant №2)
|
- Project documentation - Detail design documentation
|
2010-2011
|
EuroChem, NAK
Azot Novomoskovsk, Russia
|
IComputer simulator for personnel training
and knowledge
assessmen
|
- Computer-generated process simulator of urea production unit
|
2010-2011
|
PhosAgro,
Cherepovets, Russia
|
Urea plant
production unit with capacity 1500 TPD, procured by “Chemoproject” (Czech- | - Project documentation - Detail design documentation
|
2010-2012
|
Design Institute
«Salavatgasonephte-himproect»,
Salavat, Republic of Bashkortostan,
Russia
|
Prilling tower for urea plant №24 of JSC Salavatnefteorgsintez
|
-
Adaptation of licenser’s basic engineering package (“TEC”, Japan) to
Russian norms and regulations
- Project documentation - Detail design documentation
|
2010-2011
|
PhosAgro,
Cherepovets, Russia
|
Computer simulator
for personnel training and knowledge assessment
|
- Computer-generated process simulator for urea production unit
|
2010-2011
|
Revamp of urea synthesis evaporation unit
|
- Project documentation - Detail design documentation
|
2010
|
Kuibyshev Azot,
Togliatti, Russia
|
Prilling tower
revamp (urea plant №4)
|
- Detail design documentation
|
2010
|
Revamp of evaporation unit (urea plant №1,
unit № 4)
|
- Detail design documentation
|
2010
|
Salavatnefteorgsintez
Salavat, Russia
|
Prilling towers revamp (urea plant №24)
|
- Project documentation - Detail design documentation
|
2009-2010
|
Yokogawa Electric,
Moscow
|
Technical support of control system
for CO2 compressor with arrangement of a room for a set of technical devices at JSC NAK Azot
|
Detailed design documentation
|
2009
|
Acron, Veliky
Novgorod, Russia
|
Design of
granulated urea unit based on Rotoform technology
|
Detailed design documentation
|
2009
|
PhosAgro AG -
Cherepovetsky Azot, Cherepovets, Russia
|
Prilling tower for Urea production unit with capacity 1500 TPD
|
- Project documentation - Detail design documentation
|
2008-2012
|
Togliattiazot,
Togliatti, Samara, Russia
|
Prilling tower
modernization (urea plant)
|
-
Detailed design documentation
|
2008-2009
|
Acron, Veliky
Novgorod, Russia
|
Urea unit revamp
with capacity increase and energy saving
|
- Project documentation
- Detail design documentation
|
2008
|
Voskresensk Mineral
Fertilizers, Voskresensk, Russia
|
Urea
production unit with capacity 600
(1200) TPD
|
- Project documentation
|
2008
|
Acron,
Veliky Novgorod, Russia
|
Urea unit №5 on the
basis of relocated unit
|
- Project documentation - Detail design documentation
|
2007-2011
|
EuroChem, NevAzot, Nevinnomyssk,
Russia
|
Prilling tower revamp (urea unit, plant 2A)
|
- Project documentation - Detail design documentation
|
2007-2009
|
Grodno Azot,
Grodno, Belarus
|
Revamp of urea
plant №4 with capacity increase
|
- Feasibility study
- Architectural and civil design
|
2007-2012
|
EuroChem,
NAK
Azot, Novomoskovsk, Russia
|
Urea production
unit on the basis of relocatable unit with capacity increase and energy
saving
|
- Project documentation - Detail design documentation
|
2007-2010
|
Revamp of urea
plant №3 with capacity increase to 2000 TPD
|
- Project documentation - Detail design documentation
|
2007-2010
|
Severodonetsk Azot
Association, Severodonetsk, Ukraine
|
Development of
basic design for urea unit revamp with capacity increase from 1200 up to 1500
TPD
|
- Project documentation - Detail design documentation
|
2007-2010
|
EuroChem, NevAzot ,
Nevinnomyssk, Russia
|
Urea evaporation
unit for melamine plant
|
- Project documentation
- Detail design documentation
|
2008-2010
|
TogliattiAzot,
Togliatti, Russia
|
Technical upgrading
of urea unit with integration of melamine unit
|
- Project documentation
|
2007 – 2008
|
KuibyshevAzot,
Togliatti,
Russia
|
Revamp of urea unit
with capacity increase
|
- Project documentation - Detail design documentation
|
2007 – 2008
|
Salavatnefteorgsintez
Salavat, Russia
|
Basic design for
urea prilling tower | - Project documentation - Detail design documentation
|
2007-2008
|
Severodonetsk Azot
Association,
Severodonetsk, Ukraine
|
Development of
basic design for urea unit revamp with capacity increase from 1000 up to 1200
TPD
|
- Project documentation - Detail design documentation
|
2006-2007
|
AB Achema,
Lithuania
|
Urea production unit
based on relocatable equipment
|
- Project documentation - Detail design documentation
-
Development of operational manuals
|
2006-2008
|
PhosAgro,
Cherepovets, Russia
|
Revamping of
distillation unit with capacity
increase (urea production plant)
|
- Project documentation - Detail design documentation
|
2007
|
EuroChem, NAK Azot, Novomoskovsk, Russia
|
Computer process simulator for personnel training and knowledge assessment
|
- Computer process
simulator of urea unit
|
2006-2008
|
Azot Cherkassy, Ukraine
|
Revamping of urea
unit М-6
|
- Project documentation - Detail design documentation
|
2006-2010
|
Salavatnefteorgsintez,
Salavat, Russia
|
Revamping of urea
plant №50
|
- Project documentation - Detail design documentation
|
2006-2008
|
Fertalge Industries
SPA,
Algeria
|
Urea unit prilling
tower
|
- Project documentation - Detail design documentation
|
2002-2005
|
Dorogobuzh Verkhnedneprovsky, Smolensk region, Russia
|
Urea production
unit based on relocatable equipment, urea storage unit, prilling
tower
|
- Project documentation
|
2006-2007
|
Grodno Azot,
Grodno, Belarus
|
Revamp of urea
production unit, installation of recuperator
|
- Detail design documentation
|
2006
|
Acron,
Veliky Novgorod, Russia
|
Installation of the
5th urea synthesis reactor
|
- Detail design documentation
|
2006
|
NevAzot,
Nevinnomyssk, Russia
|
Revamp of urea
production unit №2
|
- Project documentation - Detail design documentation
|
2006
|
Melamine production units
|
Ammoni
Mendeleevsk, Tatarstan,
Russia | Melamine unit of 40 000 TPY based on EUROTECNICA HP technology | - Adaptation of BEP to RF norms and rules - Project documentation (specific sections) | |
EuroChem, NevAzot Nevinnomyssk, Russia
|
Melamine unit by
LURGI AG technology, Germany
|
-
Authority package based on foreign licensor’s basic
engineering package
-
Detailed design of architectural and civil part
|
2007-2011
|
TogliattiAzot,
Togliatti, Russia
|
Technical upgrading
of urea unit with integration of melamine unit
|
Project documentation
|
2007-2008
|
Acron Veliky Novgorod, Russia
|
Melamine production unit
|
- Feasibility study
- Environmental
impact assessment
|
2006-2007
|
Hydrogen production units
|
Shchekinoazot,
Shchekino, Russia
|
Hydrogen recovery
unit
|
-
Acting as general design contractor
- Project documentation based on foreign licensor’s basic
engineering package
-
Detailed design documentation
|
2010-2011
|
Ammonium nitrate production units
|
Nondisclosed | Technical upgrade of ammonia nitrate production section
Modification of the flow diagram for preparation of magnesium
nitrate solution
| - Main technical solutions - Detailed design documentation - Assistance at industrial safety expertise
| 2023-2024 |
NIUIF, Cherepovets,
Russia
|
High speed drum granulation unit for urea and ammonium nitrate based fertilizers production within creation of a pilot unit for granulated fertilizers production
|
- Main technical solutions development
|
2018-2019
|
TomskAzot,
Seversk, Тomskiy
region, Russia
|
Modernization
of the existing Drum Granulation unit
to shift it to the production of the granulated ammonium nitrate.
|
Equipment design documentation developmet
|
2017
|
KazAzot,
Aktau, Kazakhstan
|
Ammonia nitrate production unit modernization: HSDG for ammonia nitrate manufacturing
|
- Main technical solution development - Detail design
documentation
|
2011-2012
|
Other production units and infrastructure facilities
|
Nondisclosed | Ethanolamine Plant Technical
Upgrade
| - Detailed design documentation - Passing Industrial Safety Expertise
| 2024 - present |
Nondisclosed
| Polypropylene Unit included into a gas chemical complex | - Project documentation
- Adaptation of Detailed
design documentation developed by the customer to Russian norms and standards
- Development of Detailed design documentation for the disciplines: OVKV (HVAC), EM (electrical), VK (UG and sewage), APS (AFA), APT (AFF), CC (Communication), CCTV - Site supervision
| 2024 - present |
Nondisclosed
| Technical upgrade of industrial warehouse building with administration and amenity building
| - Detailed design documentation - Assistance at industrial safety expertise
| 2023 - present
|
KHOMA-ADGEZIV Dzerzhinsk, Russia | Energy Center. Engineering
systems
| Detailed design documentation | 2022-2023
|
InvestKhimAgro Kyshtym, Chelyabinsk region, Russia
| Production of ammonium sulfate, NPK, DAP, MAP
| - Project documentation - Detail design documentation - Field supervision
| 2022 2022-2023 2022-2024
|
Tulagiprochem Tula, Russia | Potassium nitrate production
at JSC Nevinnomyssky Azot
| Cost estimate documentation (within the scope detailed
design)
| 2022 |
Sinopec Engineering Group Rus LLC (SINOPEC) Blagoveshchensk, Russia |
Amur Gas Chemical Complex (AGCC) for production of polyethylene and polypropylene (PE, PP, HDPE, LAO), HDPE production plant |
Project documentation
|
2021-2022 |
NIPIGAS Tyumen, Russia |
AGCC
Pyrolysis plant for mixed raw materials
|
Detailed design documentation |
2021-2022 |
TECNIMONT RUSSIA Moscow, Russia |
AGCC
Process plants for PE, PP, LAO. Auxiliary
systems and shells
(cooling towers, flare),
substation, operator's room, process buildings
and structures)
|
- Project documentation - Detailed design
in part of plot plan & external
water supply and water disposal
system |
2020-2022 |
Nondisclosed |
AGCC
Revamp of the gas supply network
|
Project documentation |
2021
|
Nondisclosed |
AGCC
Gas treatment complex (off-site facilities, household
building with canteen) Gas treatment complex (off-site facilities, fire station & gas rescue service) Gas treatment complex (inter-unit racks)
|
Project documentation
|
2020-2022 |
NAK Azot, Novomoskovsk, Russia (EuroChem) |
Installation
of the hydro foamy filtration system (wet scrubbing) at urea plant
|
- Detailed design documentation - Installation supervision
- Field supervision
- Technical assistance during commissioning
|
2020
|
UralChem Berezniki,
Russia
|
Technical modernization of nitrate- nitrite salt production unit (building 449)
|
- Main technical solution development - Development of Design
Basis |
2018-2019
|
Volzhskiy Orgsintez Volzhsky, Volgograd region,Russia
|
Sodium dimetilditiocarbamate production unit, capacity 15000 tons per year
|
Adaptation of detailed
design in EPC process part
|
2018-2019
|
Sodium
dimetilditiocarbamate production unit, capacity 15000 tons per year
|
- Project documentation - Detailed design documentation
|
2017-2018
|
FCE plant named after Sverdlov
Dzerzhinsk, Nizhny Novgorod region,
Russia
|
Modernization aimed at construction of a small-scale hexogen production unit (using technology № 2.1.6.100)
|
- Field supervision for construction |
2018
|
Revamp and technical upgrade of unit for equipping
of special items, providing
production process mechanization and automation
|
- Field supervision for construction |
2018-2019
|
Salavat Neftekhimremstroy
Salavat,
Russia
|
Development of detailed design for additional heating equipment U-EA 602, U-EA 603, U-EA 604 based on technical documentation M/DK-14-169.00.00.BO.
Development of design and estimate documentation for steam tracing change.
|
- Detailed design development
- Estimate documentation
- Field supervision
|
2018
|
Korund-Cyan, Dzerzhinsk, Russia
|
Second train of sodium cyanide production unit revamp &
construction (additional works on SMIS (engineering system monitoring)
|
- Detail design
documentation |
2018-2019 |
Technical upgrade Sodium cyanide production unit. Additional equipment installation (buildings B60, B40) |
- Adaptation of licenser’s (EPC) detailed design
|
2018-2019 |
Modernization and construction of railway tracks |
- Project documentation - Detail design documentation
|
2018-2019 |
Modernization of
administrative and service building A13 | - Project documentation - Detail design documentation
| 2017 |
Checking the feasibility to replace design lining of combustion furnace with brick masonry
(building B70)
|
- Detailed
design documentation |
2017 |
Technical upgrade of the second train of cooling water unit (Sodium cyanide production unit, building
В50)
|
- Project documentation - Detail design documentation
|
2016-2017
|
Sodium cyanide production unit modernization& construction (2nd train) |
- Detailed design
development
|
2016
|
Technical upgrade of Alkali storage
(sodium cyanide production unit, building
B80)
|
- Project documentation - Detail design documentation
|
2016
|
Technical upgrade of Sodium cyanide storage
|
Detail design documentation
|
2015
|
Sodium cyanide
production unit with capacity of
80000 TPD (first and second line)
|
-
Acting as general design contractor
- Project documentation based on foreign licensor’s basic
engineering package (EPC, Germany)
- Detail design documentation
|
2010-2012
|
SNF Flopam
Qatar
|
Acrylamide and polyacrylamide production unit with capacity of 60 000 TPY
|
- Project documentation |
2017
|
QAFCO (Qatar Fertilizer Company),
Qatar
|
Multipurpose
High Speed Drum Granulation (HSDG) Pilot Plant for production of granulated urea with additives, capacity
100 kg per hour
|
-
Technology licensing
-
Engineering
|
2014-2015
|
PVFCCо,
Phu My I, Ba Ria Vung Tau, Vietnam
|
High Speed Drum Granulation unit for production of compound fertilizers (capacity 100 kg/h)
|
-
Technology licensing
-
Engineering
|
2014-2015
|
Kuibyshev Azot,
Togliatti, Russia
|
Implementation of catalytic purification system, compressor plant, outdoor installations and production buildings
(energy efficient cyclohexanol production unit
installation project, capacity 140000 TPY)
|
- Project documentation
- Detail design documentation
|
2012-2014
|
Nizhfarm,
Nizhny Novgorod, Russia
|
Grass-root gel
production plant
|
-
Adaptation of licenser’s
basic engineering package (“Chemofarm engineering”, Belgrad, Serbia)
to Russian norms and regulations
|
2011
|
Zawolzhsky
Motorny Zawod,
Zavolshye, Russia
|
Technical upgrading
of pipelines for acids solution discharge in heat-treating workshop
|
-
Detailed design documentation
|
2011
|
TIKO-Plastic,
Dzerzhinsk, Russia
|
Expanding capacity
of plastic film production plant. Production building construction
|
-
Acting as general design contractor
- Project documentation
- Detail design documentation (architectural and civil documentation)
|
2010-2011
|
Nexis,
Perm, Russia
|
CAN (capacity
10 000 TPY) and magnesium nitrate production units (solid or liquid
form)
|
-
Development of Design Basis
- Development of equipment
design documentation for non- standardized equipment
|
2010-2011
|
AutoVAZ,
Togliatti, Russia
|
Technical upgrading
of liquid ammonia evaporation unit
|
- Project documentation - Detailed design documentation - Correction of current regulations
|
2010
|
Zawolzhsky
Motorny Zawod Zavolshye, Russia
|
Construction of
testing station for diesel engines
|
Turnkey project
|
2009
|
TIKO-Plastic, Dzerzhinsk, Russia | Production unit of polyethylene film and products | Acting as general
designer
| 2006-2007 |
Korund,
Dzerzhinsk,Russia
|
Lacquer, paint and
polyester resins production unit
|
-
Acting as general design contractor
-
Detailed design documentation (infrastructure)
|
2005-2007
|
Storage and logistic facilities
|
Nondisclosed | Ammonia storage technical
upgrade
| Main technical solutions
| 2024-present |
Nondisclosed | Nitric acid storage
with pump house | - Execution of engineering surveys
- Preparation of environmental impact assessment materials, arrangement of public hearings with preparation of final documents
- Project documentation - Scientific and technical support
- Assistance at state ecological expertise and main state expertise - Detailed design documentation
- Technical assistance at the stage of equipment and materials procurement
| 2022-2024
2024-2025
|
Togliattiazot, Togliatti, Russia (JSC OKHK Uralchem)
| Ammonia and mineral fertilizer
transshipment complex with capacity of 5 million
TPY in Taman seaport
Facilities: compressor station; upstream
power distribution panel; sewage pumping station
and reservoirs; water reservoir and pump house; control room; KTP.RU.
Diesel generator room
| - Detailed design documentation - Field supervision
| 2022-2023 |
Metafrax,
Gubaha, Russia
|
Revamp of urea storage unit unloading
section
|
- Project documentation - Detail design documentation
|
2013
|
Korund Dzerzhinsk, Russia
|
Revamp of chlorine storage unit, adaptation
to industry safety requirements | - Detail design documentation
|
2009
|
Ammoni,
Mendeleevsk, Russia
|
Construction of
urea storage complex
|
Basic design
|
2008-2009
|
Pervouralsky novotrubny zavod Perovuralsk, Russia
|
Revamp of liquid ammonia storage unit № 33
|
- Project documentation - Detail design documentation
|
2006-2007
|
Zawolzhsky
Motorny Zavod,
Zavolshye,
Russia
|
Revamp of sulphuric
acid storage unit
|
Revamp turnkey project
|
2006-2007
|
Petrol storage unit
|
Construction turnkey project
|
2006
|
Nizhegorodsky mashinostroitelny zavod,
Russia
|
Revamping of
chlorine storage unit and chlorinator
|
Revamp turnkey project
|
2006-2007
|
Kuibyshev Azot Togliatti, Russia
|
Revamp of urea storage
unit
|
- Project documentation - Detail design documentation
|
2007
|
TIKO-Plastic,
Dzerzhinsk, Russia
|
Feedstock and final
product storage facilities
|
- Project documentation - Detail design documentation
|
2006
|
Pre-design services
|
Nondisclosed | Hydrogen production unit with capacity
of 207 000 nm3/h, which is a chemical-process part of nuclear power engineering plant with high temperature gas-cooled reactors
| Pre-design documentation
|
2023 - present |
Nondisclosed | Urea production unit with capacity of 3150 MTPD by NIIK technology
| Investment feasibility study
| 2022 |
Nondisclosed
| Methanol production unit with capacity
of 140,000 MTPY
| Investment feasibility study
| 2022 |
Nondisclosed
| Urea production unit with capacity of 3150 MTPD
| Investment feasibility study
| 2020 |
Ammoni
Mendeleevsk, Tatarstan, Russia
| Melamine production unit with capacity
of 40 000 and 60 000 MTPY based on HP technology of EUROTECNICA | Investment feasibility study
| 2020 |
Apatit
Cherepovets,
Russia
| Ammonia production
| Consulting services
on preliminary study of infrastructure facilities of the new ammonia
unit and cost estimation for project implementation
|
2019-2020 |
Nondisclosed
| Ammonia- methanol- urea\other nitrogen products complex
| Front-end engineering (detailed estimation of overall scope, reviewing options for site location in the territory of the Russian Federation)
| 2019-2020 |
Nondisclosed
| Ammonia-methanol-urea complex
| Front-end engineering for 7 options of production complex arrangement at different construction sites
| 2019 |
Gaz-Sintez LLC
Vyborg, Russia
|
5000 MTPD Methanol
Plant
|
- Investment feasibility study
- Declaration of Intent to Invest |
2018 |
ShchekinoAzot
Shchekino, Russia
|
Ammonia-urea production complex
|
- Feasibility study
- Preliminary Environmental impact assessment |
2018 |
Angarsk Nitrogen Fertilizer
Plant
Angarsk, Russia
| Technical upgrade of prilling tower air treatment system (unit
No.33/36), facility No.1011
| Investment feasibility study | 2018 |
ORELMETACHIM
Orel, Russia
| Ammonia and urea production complex | Investment feasibility study | 2018 |
ULGA – company
Safonovo,
Smolensk region, Russia
| Methanol production unit with capacity
1 000 000 MTPY
| Feasibility study | 2018 |
Meleuz mineral fertilizers Meleuz, Russia
| Repair of UKL-7-76
No.2 for ammonium
nitrate production and shipment. Capacity 450 000 MTPY of ammonium nitrate
| Investment feasibility study | 2018 |
Askom
| Methanol production with capacity 5 000 TPD
Methanol production with capacity 2 500 TPD
| Investment feasibility study | 2018 |
Kazphosphate,
Kazakhstan
| Ammonia production with capacity
1 000 000 TPY
| Investment feasibility study | 2018 |
Air Liquide | Methanol production complex with capacity
of 5,000 MTPD
Off-site facilities
| Pre-design work
| 2018 |
KazAzot, Aktau,
Kazakhstan
| Ammonia\urea and (or) natural gas deep processing products production complex | Investment feasibility study | 2017 |
Novgorodsky GIAP, Veliky Novgorod,
Russia
| Ammonia and urea production complex (Dorogobuzh site) | - Feasibility study | 2017 |
Yakut gas processing complex,
Saha, Yakutsk,
Russia
| Preliminary planning and engineering at feasibility study stage (Methanol production unit with capacity 10000 TPD) | - Preliminary engineering surveys | 2017 |
|
Preliminary planning and engineering at feasibility study stage (Methanol production unit with capacity 10000 TPD)
| - Preliminary environmental impact assessment - Assistance for ecological expertise approval | 2017 |
Notdisclosed | Construction of ammonia (2700 MTPD) and urea (3500 MTPD) production complex near the port of Ust-Luga and shipping terminals of ammonia (600 000 MTPD) and urea (3 million
MTPD) | Feasibility study | 2017 |
Amec Foster Wheeler,
Moscow, Russia
|
Methanol production unit with capacity
10000 MTPD for JSC Yakut Fuel and Energy Company
|
Investment
feasibility study
|
2017
|
Nondisclosed
|
Methanol production unit with capacity
of 5,000 MTPD (Ust-Luga)
|
Investment
feasibility study
|
2017
|
Nondisclosed
| Methanol production unit with capacity
of 5,000 TPD (Sabetta) | Pre-design work
| 2017 |
Baltic Gas Chemical
Company, Saint-Petersburg, Russia
|
M-15 production unit
with capacity 15000 TPY for Chayandinskoye field
|
Development of declaration of
intent
|
2017
|
CREON-ENERGY,
Moscow, Russia
|
Methanol production
unit with capacity 1mln TPY (Novoroscement site)
|
-
Methanol production unit tie-up for site infrastructure
|
2017
|
Jugterminalproect,
Moscow, Russia
|
Justification of optimal configuration for production complex
Methanol-Ammonia-Urea complex
(Taman region)
|
Pre-design work
|
2017
|
Azot,
Kemerovo, Russia
|
UAN production unit
with capacity 150000 TPD
|
Investment
feasibility study
|
2017
|
Teсhnoleasing,
Moscow, Russia
|
Methanol production unit with capacity
of 1 mln MTPY (at industrial site Skovorodino, Amur region)
|
Investment
feasibility study
|
2016
|
Novgorodsky
GIAP Veliky Novgorod, Russia
|
-
Sulfuric acid production unit
-
Wet-process phosphoric acid production unit
-
Monoammonium phosphate (MAP) and\or diammonium phosphate
(DAP) production unit
|
Investment
feasibility study
|
2016
|
Metafrax Gubakha, Russia
|
Ammonia-urea-melamine complex
|
-
Reviewing options for site
location
-
Development of declaration of
intention
-
Environmental impact assessment
-
Conducting public hearings
|
2015-2016
|
Norilsk Nickel, Moscow,
Russia
|
Urea production complex (Dudinka
site)
|
Investment feasibility study
|
2016
|
Zhilevskaya kremniorganika Sitne-shchelkanovo, Moscow region, Russia
|
Ammonia-urea complex
|
Investment feasibility study
|
2016
|
ShchekinoAzot,
Shchekino, Russia |
Methanol production
unit with capacity 500000 TPY
|
Connection of the production unit to the industrial site of JSC ShchekinoAzot taking into account location of Ammonia-Urea complex and sulfuric acid production complex
|
2016
|
Ammonia-urea
complex
|
- Development of declaration of intent
|
2016
|
Placement of Ammonia- Urea complex
and sulfuric acid production complex at industrial site of JSC ShchekinoAzot
|
- Connection of the sulfuric acid production unit and Ammonia- Urea complex to the industrial site of the plant
|
2015
|
Grodno Azot, Grodno, Belarus
|
Nitrogen complex
(ammonia-urea-hydrogen)
|
Investment feasibility study
|
2015
|
KuibyshevAzot,
Togliatti, Russia
|
Urea production unit
|
Investment feasibility study
|
2014
|
Sibmetahim,
Tomsk, Russia
|
Chemicals
manufacturing unit (synthetic fluid \ ammonia-urea melamine complex)
|
Expert economic assessment
|
2014
|
CREON-ENERGY,
Moscow,
Russia
|
Methanol production with capacity 5000 TPD (Ust-Luga region)
|
Investment feasibility study
|
2014
|
Rosstroy,
Novocherkassk, Russia
|
Ammonia-urea complex
|
Investment feasibility study
|
2014
|
PhosAgro,
Cherepovets, Russia
|
Granulated
urea production unit with capacity 1500 TPD
|
Preliminary environmental impact assessment
|
2014
|
Ammonia production
unit AM-3 (capacity 2200 TPD)
|
Preliminary environmental impact assessment
|
2013- 2014
|
National Chemical
Company Russia
|
Ammonia-urea-methanol complex (Kozmino, Primorsky territory)
|
-
Declaration of intention development
- Preliminary environmental impact assessment
-
Conducting public hearings
|
2013
|
ICM,
Saint-Petersburg, Russia
|
Ammonia–Urea complex
(Vistino settlement, Kingisepp district, Leningrad region)
|
-
Declaration of intention development
- Preliminary environmental impact assessment
|
2012-2013
|
Minudobreniya, Rossosh, Russia
|
Ammonia-urea complex
|
Investment feasibility study
|
2012
|
ShchekinoAzot,
Shchekino, Russia
|
Ammonia-urea
complex
|
Investment feasibility study
|
2010-2011
|
Hydrogen production unit
|
Investment feasibility study
|
2011
|
Balakovo Mineral
Fertilisers
(PhosAgro),
Balakovo, Russia
|
Above-ground ammonia storage unit
|
Investment feasibility study
|
2010
|
Process inspections & scientific engineering
|
ShchekinoAzot
Shchekino, Russia
| Methodological support of urea unit
| Development of measurement methods in accordance with GOST 8.563-2009
| 2024 |
Nondisclosed | Inspection of urea unit in order to increase urea quality, optimize
the consumption coefficients on feedstock, materials and resources
| - Process inspection - Report on inspection results
| 2024 |
NAK Azot,
Novomoskovsk, Russia
| Engineering and technical measures
development to improve efficiency of evaporation units and the existing prilling
tower, aimed at reducing concentration of ammonia in the melt and in the air emissions at the urea unit
| - Inspection of the evaporation units and prilling tower
- Engineering and technical measures development
| 2023 |
RusVinyl
Kstovo, Russia
| Certification
of measurement technique
| Research and confirmation of methodology compliance to established requirements
| 2023 |
EuroChem, NevAzot, Nevinnomyssk,
Russia
|
Urea production unit 2A inspection to improve synthesis unit efficiency when operating urea unit and melamine production facility jointly |
Process inspection
|
2019 |
Maxam-Chirchik,
Chirchik,
Uzbekistan
|
Works on inspection of the existing urea unit to develop measures to reduce emissions and pollutant effluents released
to environment
|
Process inspection
|
2019 |
EuroChem,
NAK Azot,
Novomoskovsk,
Russia
|
Technical inspection of evaporation unit (urea plant № 2) |
- Process inspection
- Issuing recommendations
|
2019 |
Maxam-Chirchik,
Chirchik,
Uzbekistan
|
Technical inspection of nitric acid production units АК-72М\АК-72 |
- Process inspection |
2019 |
Gazprom neftekhim Salavat
Salavat, Russia
| Reconstruction of unit 24 GHZ of “Gazprom neftekhim
Salavat” Ltd to achieve the daily output
of 1,400 TPD
| - Process inspection - Development of design basis
| 2019-2020 |
Nevinnomyssky Azot,
Nevinnomyssk, Russia (EuroChem Group AG)
| Performance of works on inspection
of evaporation unit (urea plant No. 2)
| - Process inspection - Issuing recommendations | 2019 |
Maxam-Chirchik Chirchik, Uzbekistan
| Process inspection of existing АК-72М
and АК- 72 nitric acid units
| - Process inspection
| 2019 |
PMU, UralChem, Perm,
Russia
|
Certification of measurement procedures |
- Evaluation and
confirmation of
compliance of
measurement
procedures with the
established requirements
- Process measurement procedures to bring them in line with the requirements
|
2018 |
Grodno Azot, Grodno, Belarus
| Complex inspection of Urea 3 plant | - Technical inspection
| 2018 |
TechnoChimReagentBel,
Grodno,
Belarus
| Certification of measurement procedures | - Evaluation and confirmation of compliance of measurement procedures with the established requirements - Modifying measurement procedures to bring them in line with the requirements
| 2018 |
Certification of measurement procedures | - Evaluation and confirmation of compliance of measurement procedures with the established requirements - Modifying measurement procedures to bring them in line with the requirements
| 2017 |
Union of producers and consumers of automobile chemical goods,
Moscow,
Russia
| Certification of measurement procedures | - Evaluation and confirmation of compliance of measurement procedures with the established requirements - Modifying measurement procedures to bring them in line with the established requirements
| 2017 |
PhosAgro,
Cherepovets,
Russia
| Revision of existing operating procedures (urea production units № 1 and №2) | Implementation
of changes in the constant process procedures
| 2017 |
Salavatnefteorgsintez
Salavat,
Russia
| Field supervision and technical support during construction and commissioning (modernization of urea production unit №24 granulation section, capacity 1400 TPD) | - Sitesupervision - Technical support during construction - Commissioning
| 2017 |
Gasprombank, Moscow, Azot, Kemerovo, Russia
|
Technical inspection
of SDS-Azot urea production
facilities
|
- Process inspection - Development of measures
on operation optimization - Investment evalutation
|
2017
|
Grodno Azot, Grodno, Belarus
|
Development of
technical solutions for distillation gases treatment unit (urea plant №2)
|
-
FEED
|
2017
|
EuroChem, NAK Azot,
Novomoskovsk, Russia
|
Technological inspection of the prilling
tower (complex fertilizers production plant, ammonium nitrate unit)
|
- Process inspection - Development of engineering technical measures
for stabilization of operation of the prilling
tower
|
2016
|
Azot, Kemerovo, Russia
|
Performance of a complex technical
audit of the urea plant developed based on Tecnimont technology
|
- Process inspection
-
Development of engineering solutions optimizing technological
processes, reducing energy
consumption and enhancing reliability
of unit operation
-
Investment evaluation
|
2015
|
EuroChem,
NevAzot, Nevinnomyssk,
Russia
|
Technical inspection
(urea plant № 2, urea units 1-3)
|
- Process inspection
-
Development of engineering solutions
reducing energy consumption and increasing capacity
-
Feasibility study
|
2015
|
Research Institute for Mineral Fertilizers
(NIUIF), Moscow, Russia
|
Development of a
reference guide on most appropriate technologies used to produce ammonia,
mineral fertilizers and mineral acids (sections developed by NIIK: ammonia,
NA, AN, CAN, urea, UAN). Scientific and technical
support to get the approval of expertise.
|
Development of an industry reference guide of the best available
technologies
|
2015
|
EuroChem, NevAzot Nevinnomyssk, Russia
|
Performance of a complex process inspection of the urea section
at Urea and melamine
unit No.2
|
Performance of inspection in order to develop
measures for optimizing process
mode of the urea unit during its joint operation with the melamine
unit
|
2014
|
FNTC Group spol.s
r.o,
Czesh Republic
|
Process inspection of the urea unit at JSC Farg'onaazot
|
Process inspection
|
2013
|
EuroChem, NAK
Azot,
Novomoskovsk, Russia
|
Technological inspection (urea plant №3, second train) aimed at
capacity increase to 1600 t/d
|
Process inspection
|
2012
|
32,5% urea solution production unit (capacity 100000 TPY) including urea solution treatment unit on
the basis of urea plant № 2 evaporation
unit
|
Process inspection of urea units with justification for creation of a unit
|
2011
|
Acron,
Veliky Novgorod, Russia
|
Process inspection of the urea unit in order to develop measures aimed at capacity increase and energy saving
|
Process inspection
|
2010-2011
|
PhosAgro,
Cherepovets, Russia
|
Process monitoring of operation of the urea unit in order to reduce ammonia
consumption
|
Process inspection
|
2009
|
Severodonetsk Azot
Association, Severodonetsk, Ukraine
|
Process monitoring of operation of the urea unit equipment
|
- Process inspection - Development of measures
on revamp for capacity increase and energy saving |
2008
|
Minudobreniya,
Perm,
Russia
|
Process monitoring of operation of the urea unit equipment
|
- Process inspection
|
2006
|
Technical diagnostics & equipment repair services
|
Togliattyazot
Togliatti, Russia
| Inspection of tubes of II stage waste heat boiler item 112, Unit 05A
| Eddy current inspection for heat exchanger
tubes
| 2024 |
Apatit
Cherepovets, Russia
| Repair of urea synthesis reactor item R-201 at urea plant ЦПМ-2 (replacement of 4 lining belts)
| Development of technical documentation for repair Test of flat steel samples for resistance to intergranular corrosion
| 2024
|
Grodno Azot
Grodno, Belarus
| Inspection of reactor item R-201 of Urea unit 4
| Corrosion inspection
| 2024 |
Grodno Azot
Grodno, Belarus
| Inspection of heat- exchanging tubes of II stage waste-heat boiler item 112 of Ammonia
unit 4
| Eddy current testing of heat exchange tubes
| 2024
|
NORE,
Novomoskovsk, Russia
| Eddy current testing of heat exchange tubes
of equipment at Urea unit 3 (1st train) on the territory
of JSC NAK Azot
| Eddy current testing of heat exchange tubes
| 2024
|
NORE, Novomoskovsk, Russia
| Inspection of heat- exchanging tubes of equipment at 1-B unit of JSC Nevinnomyssky Azot
| Eddy current testing of heat exchange tubes
| 2024
|
Apatit
Cherepovets, Russia
| Inspection of heat- exchanging tubes of equipment at Urea unit 1, Urea unit 2, Urea unit 3, Gas separation unit, Sulfuric acid unit
| Eddy current testing of heat exchange tubes
| 2024
|
Apatit
Cherepovets, Russia
| Inspection of reactor item R-201 at Urea unit 2
| Corrosion inspection
| 2024
|
Helwan Fertilizer Co
Egypt
| Repair of 322-R-0 urea synthesis reactor
lining
| Development of the technical documentation for repair
| 2024 |
NAK Azot,
Novomoskovsk, Russia
| Lining repairs
of synthesis reactor item 6-3 at Urea-2 unit
| Repair works
| 2024
|
NAK Azot,
Novomoskovsk, Russia
| Lining repairs
of synthesis reactor item 11-R-1
at Urea-3
(1) unit
| Repair works
| 2024
|
Togliattyazot
Togliatti, Russia
| Inspection of equipment at 08К unit of urea plant
| - Corrosion inspection
- Eddy-current testing
of heat- exchange tubes - Installation supervision
| 2024 |
KuibyshevAzot
Togliatti, Russia
| Inspection of main process equipment at urea unit, repairs
works of distillation column item 7/1
| - Corrosion inspection - Repairs works
| 2024
|
NAK Azot, Novomoskovsk, Russia
| Replacement of HP stripper in Urea-3 unit (2st train)
| Technical assistance at repair works
| 2024
|
NAK Azot, Novomoskovsk, Russia
| Corrosion inspection of urea reactor lining
state in terms of corrosion, reveal of fluid leak-through location in equipment
item 11-R-1 of Urea unit 3 (1st train)
| - Performance of inspection - Reveal of leak - Technical assistance at repair works | 2024
|
NORE,
Novomoskovsk,Russia
| Corrosion inspection of equipment
at Urea unit 3 (2nd train) on the territory of NAK Azot
| Performance of corrosion inspection
| 2023 |
NORE, Novomoskovsk,Russia
| Eddy current testing of heat exchange tubes
of equipment at Urea unit 3 (2nd train) on the territory
of NAK Azot
| Performance of eddy-current testing
| 2023 |
Togliattiazot
Togliatti,Russia
| Corrosion inspection of equipment
at Urea unit 08К
| Performance of corrosion inspection
| 2023 |
Grodno Azot
Grodno, Belarus
| Eddy-current
testing of heat-exchange tubes
of tube bundles in evaporators
of Cyclohexanone unit 1
| Performance of eddy-current testing
| 2023 |
Apatit
Cherepovets,Russia
| Eddy-current
testing of heat-exchange tubes of pressure vessels
| Performance of eddy-current testing
| 2023 |
Apatit
Cherepovets,Russia | Inspection of reactor item R-201 at ЦПМ-2 urea unit
| Corrosion inspection
| 2023 |
Minudobreniya, Rossosh, Russia | Technical inspection of equipment
ИТН No.1 and ИТН No.2
| Corrosion inspection
| 2023 |
Technologia
Dzerzhinsk, Russia
| Lining repairs
of synthesis reactor item R-901
at urea unit in KAO Azot, Kemerovo
| Repair works
| 2023 |
Togliattyazot
Togliatti,Russia
| Inspection of the bearing shell of dismantled urea synthesis reactor
item 14-R-1
| Performance of inspection
| 2022 |
Apatit
Cherepovets,Russia
| Overhaul of HP urea reactor R-201 (repair of neck lining and 3 head nozzles)
| Development of the technical documentation and procurement of required metal products
| 2022 |
Apatit
Cherepovets,Russia
| Eddy-current
testing of heat-exchange tubes of pressure vessels
| Performance of eddy-current testing
| 2022 |
Apatit
Cherepovets,Russia
| Inspection of reactor item R-201 at ЦПМ-2 urea unit
| Corrosion inspection
| 2022 |
Grodno Azot
Grodno, Belarus
| Capital repairs of reactor item R-201
at Urea-3 unit
| Repair works
| 2022 |
Grodno Azot
Grodno, Belarus
| Inspection of desorber
at cyclohexagone-1 unit
| Eddy-current
testing of heat-exchange tubes
| 2022 |
Grodno Azot
Grodno, Belarus
| Inspection of reactor R- 501А at benzene hydrogenation unit
| Eddy-current
testing of heat-exchange tubes
| 2022 |
Grodno Azot
Grodno, Belarus
| Inspection of equipment at Urea-4 unit
| - Corrosion inspection - Eddy-current testing
of heat-exchange tubes
| 2022 |
NAK Azot
Novomoskovsk, Russia
| Repairs works of reactor item 6/2 at Urea-2 unit
| Repair works
| 2022 |
NORE,
Novomoskovsk, Russia
| Inspection of equipment at unit No.2-a (melamine) Nevinnomyssky Azot
| Corrosion inspection
| 2022 |
Nevinnomyssky Azot
Nevinnomyssk,Russia
| Eddy-current
testing of vessels item 503
| Inspection
| 2022 |
KuibyshevAzot
Togliatti,Russia
| Inspection and repair
of urea reactor item 6/1 at Urea unit No.4
| Inspection and repairs
works
| 2022 |
KuibyshevAzot
Togliatti,Russia
| Inspection and repairs works of urea synthesis
reactor item 6/2 unit No.4
| Inspection and repairs
works
| 2022 |
UralChem,
Berezniki,
Russia
|
Replacement of nozzles Р1, Р2, Р3, Р4 Replacement of bottom liner Replacement of three liner belts in the reactor R-901
|
Repair works
|
2021
|
SORFERT
Algeria
| Corrosion inspection and eddy-current testing of heat-exchange tubes
of equipment at Urea unit | Corrosion inspection and eddy-current testing
of high pressure equipment
| 2021 |
CASALE
| Eddy-current
testing of steam turbine
condenser at Navoi Azot, Uzbekistan
| Eddy-current
testing
| 2021 |
Azot,
Kemerovo,
Russia
|
Replacement of nozzles Р1, Р2, Р3, Р4 Replacement of bottom liner in the reactor R-901
|
Repair works
|
2021
|
NAK Azot
Novomoskovsk, Russia
| Corrosion inspection of three synthesis
reactors at Urea-2 unit
| Corrosion inspection
| 2021 |
Apatit
Cherepovets, Russia
| Eddy-current
testing of equipment
item 16-Е-73
| Eddy-current
testing
| 2021 |
Apatit Cherepovets, Russia | Eddy-current
testing of heat-exchange tubes of pressure vessels
| Eddy-current
testing
| 2021 |
Grodno Azot, Grodno, Belarus
|
Replacement of two liner belts of cylindrical part of reactor R-201
|
Repair works
|
2021
|
Grodno Azot, Grodno, Belarus
|
Inspection of reactor item R-201 at Urea-3 unit
|
Repair works
| 2021 |
NORE,
Novomoskovsk, Russia
| Corrosion inspection of equipment
at Urea-3 unit (1st train) on the territory of NAK Azot
| Corrosion inspection and eddy- current testing
of equipment
| 2021 |
Nevinnomyssky Azot
Nevinnomyssk, Russia
| Corrosion inspection of reactor
item R-1201 (melamine)
| Corrosion inspection
| 2021 |
FHU Polimer Grzegorz Grzesik
Poland
| Execution of repair works for cylinder shells No.4 and 5 of column K-3 at Uralchem site in Berezniki
| Repair works
| 2020 |
Grodno Azot
Grodno, Belarus
| Performance of works on measuring wall thickness of lining
pipes in high pressure
stripper item E- 201 of Urea unit 3
| Performance of inspection
| 2020 |
KuibyshevAzot
Togliatti, Russia
| Inspection of corrosion and technical condition
of heat exchange and tank equipment
and elimination of the detected defects
at Urea unit No.4
| - Performance of inspections - Repair works
| 2020 |
NAK Azot, Novomoskovsk,Russia (EuroChem Group AG) | Services on inspection of corrosion and technical condition
of the main technological equipment of Urea unit 3 (2nd train)
| Performance of inspection | 2020 |
Minudobreniia
Rossosh,Russia
| Eddy current testing of technical condition of 100% of heat exchange tubes of the syngas heat exchanger upstream methanator item 136-C
| Performance of inspection
| 2020 |
Togliattyazot
Togliatti,Russia
| Eddy current
testing of heat exchange tubes
of carbamate condensers items 11-Е-5А, 11-Е-5В, 14-Е-5А, 14-Е-5В of Urea unit No.08K | Performance of inspection
| 2020 |
Apatit
Cherepovets,Russia | Eddy current testing of heat exchange tubes
of pressure vessels at Apatit units and sections
| Performance of inspection
| 2020 |
Grodno Azot
Grodno, Belarus
| Technical assistance and management of works on lining welds repair for urea synthesis reactor item R-201 at Urea unit No.4
| Repair works
| 2020 |
Nevinnomyssky Azot,
Nevinnomyssk,Russia (EuroChem Group AG)
| Technical assistance in repair of heavy fractions
distillation column item D-2203
at Unit No.12А
| Repair works
| 2020 |
Apatit
Volkhov,
Russia
|
Eddy-current
testing of heat exchange
tubes of СК-800 equipment operating under excessive pressure
|
Eddy-current testing
|
2019 |
EuroChem, NevAzot,
Nevinnomyssk,
Russia
|
Corrosion and technical inspection of urea synthesis reactors pos. 6/1, 6/4, distillation columns pos. К-7/1, К-7/2, stripper-distillation units pos. Т8/1,
8/2, mixers pos. 5/1, 5/2, 5/3, 5/4, air heaters pos. 20/3 (urea unit №2А) |
Performance of inspection
|
2019 |
MOPCO,
Egypt
|
Urea production unit MOPCO-2 corrosion inspection |
Corrosion inspection
|
2019 |
Urea production unit MOPCO-3 corrosion inspection |
Corrosion inspection
|
2019 |
Industrial group Phosphorite,
Leningrad region, Кingisepp, Russia
|
Works on inspection of 100% of heat-exchange tubes by eddy-current testing for the heat recovery
boiler and air preheaters at Sulfuric acid unit
|
Eddy-current testing
|
2019 |
AlexFert,
Egypt
|
Recirculation heater internal surface heat exchanger tubes cleaning by thermo- pneumo-abrasive method |
Repair works
|
2019 |
KuibyshevAzot, Togliatti, Russia
|
Performance of a repair work complex for Urea synthesis
reactor item No. 6/1 (registration No.202КВ)
|
Repair works
|
2019 |
EuroChem,
NAK Azot,
Novomoskovsk,
Russia
|
Corrosion and technical inspection of urea production unit 3 main equipment (train 1) |
Corrosion inspection
|
2019 |
Azot,
Kemerovo,
Russia
|
Works on inspection and replacement of the upper head, cylindrical sections of shells VI and VII of synthesis reactor item R- 901 lining
|
Repair works
|
2019 |
Grodno Azot,
Grodno,
Belarus
|
Lining repair of synthesis reactor pos. R-201 urea plant №3 |
Repair works
|
2019 |
«Meleuz mineral fertilizers», Meleuz,
Russia
|
Repair of heat exchanger tubes of evaporation unit pos. T-10 (ammonium nitrate production unit) |
Repair works
|
2019 |
EuroChem, NevAzot, Nevinnomyssk,
Russia
|
Synthesis reactor relining (pos. 6/3, urea plant № 2) |
Repair works
|
2019 |
Apatite,
Cherepovets,
Russia
|
Eddy-current testing of pressure vessels' heat exchanger tubes |
Eddy-current testing
|
2019 |
Nitrogénművek Zrt., Hungary
|
Urea reactor R202 relining |
Repair works
|
2018 |
Metafrax, Gubakha, Russia
Casale SA, Switzerland
|
Ammonia-urea-melamine complex |
- Technical assistance during commissioning and guarantee testing of the prilling tower
- Site supervision
|
2018-2021 |
PG Phosphorite, Leningrad region, Kingisepp, Russia
|
Eddy-current testing of heat recovery boiler tubes |
- Eddy-current testing
- Issuing
recommendations
for repairs
|
2018 |
TogliattiAzot, Togliatti, Russia
|
Equipment corrosion and technical inspection (urea plant № 08К) |
- Corrosion inspection
- Developing recommendations for repairs
|
2018 |
UralChem,
Berezniki,
Russia
|
Corrosion inspection |
- Corrosion inspection
- Developing recommendations for repairs
|
2018 |
Minudobreniya,
Rossosh, Russia
|
Eddy current testing |
- - Eddy current testing
- Developing recommendations for repairs
|
2018 |
EuroChem, NevAzot, Nevinnomyssk,
Russia
|
Corrosion and technical inspection of plant №2 |
- Corrosion inspection
- Developing recommendations for repairs
|
2018 |
KuibyshevAzot, Togliatti, Russia
|
Relining of distillation column pos. K-7/2 of plant №4 |
- Repairs
|
2018 |
Grodno Azot,
Grodno,
Belarus
|
Lining repair of synthesis reactor pos. R-201 urea plant №4 |
- Repairs
|
2018 |
TogliattiAzot,
Togliatti,
Russia
|
Technical repairs manual |
- Developing recommendations for repairs
|
2018 |
Apatite,
Cherepovets,
Russia
|
Replacement of mass-transfer trays in urea synthesis reactor pos. R-201 in urea plant №2
|
- Repair works
|
2018
|
Eddy-current testing of pressure vessels' heat exchanger tubes
|
- Nondestructive testing
- Issuing recommendations for equipment operating and repairing
|
2018
|
Belenergomash,
Belgorod,
Russia
| Steel tubes samples intergranular corrosion testing | - Testing | 2018 |
Apatite,
Cherepovets,
Russia
| Eddy-current testing of heat-exchanger tubes working under pressure. | - Nondestructive testing - Issuing recommendations for equipment operating and repairing
| 2018 |
EuroChem,
NAK Azot,
Novomoskovsk,
Russia
| Corrosion and technical inspection of heat exchanger tubes of high pressure stripper pos. E-201 using eddy current method. | - Corrosion and technical inspection
- Issuing recommendations for equipment operating and repairing
| 2017 |
EuroChem, NevAzot, Nevinnomyssk,
Russia
| Cleaning heat exchangers pos. E-302 and E- 302B (urea production plant № 2А) | - Nondestructive testing - Equipment cleaning by thermo-pneumo- abrasive method
| 2017 |
Nitrogénművek Zrt.,
Pétfürdő
Hungary | Corrosion and technical inspection of stripper pos. E-201 (urea production) | - Nondestructive testing | 2017 |
Cleaning heat exchanger tubes of stripper pos. E-201 (urea production) | - Electro-hydro- mechanical cleaning of heat exchanger tubes | 2017 |
«Meleuz mineral
fertilizers», Meleuz, Russia
|
Replacement of old
tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit)
|
-
Nondestructive testing
-
Development of repair
method&technique
-
Repair works
|
2017
|
EuroChem,
NevAzot, Nevinnomyssk, Russia
|
Technical and
corrosion inspection of urea
synthesis reactors pos.6/1 and 6/3
(urea plant №2)
|
-
Nondestructive testing
-
Recommendations issue for equipment operating and repairing |
2017 |
Minudobreniya,
Rossosh,
Russia
|
Technical inspection
of heat- exchanging tubes (plant АM-2)
|
-
Nondestructive testing
-
Recommendations issue for equipment repairing
|
2017
|
Grodno Azot,
Grodno,
Belarus
|
Repair of the lining
of the synthesis reactor manhole (pos. R-201, urea plant №3)
|
-
Technical documentation development
- Instrumental control of the works performed
|
2017
|
Technical
and corrosion inspection of urea synthesis reactor pos. R-201 and HP
condenser pos. E-202 (urea plant № 3)
|
-
Inspection of corrosion and technical condition
- Development of recommendations for performance of repair
|
2017
|
Technical
and corrosion inspection of urea synthesis reactor pos. R-201, HP stripper
pos. E-201 and HP condenser pos. E-202 (urea plant № 4)
|
- Inspection of corrosion and technical condition
- Development of recommendations for performance of repair
|
2017
|
TogliattiAzot,
Togliatti, Russia
|
Inspection
and development of recommendation for
14-R-1 synthesis reactor relining
(urea production unit 08К)
|
- Inspection by nondestructive testing - Development of recommendations for performance of repair
|
2017
|
Kuibyshev Azot,
Togliatti,
Russia
|
Corrosion
and technical inspection of the main
technological equipment of urea production unit
|
-
Nondestructive testing
-
Issuing recommendations for repairing
|
2017
|
EuroChem,
NevAzot, Nevinnomyssk,
Russia
|
Corrosion inspection and technical
supervision of repair works on distillation column for heavy fractions (pos.D-2203, №12А)
|
-
Nondestructive testing
-
Recommendations’ issue for repairing
-
Quality control of the works performed
|
2017
|
PhosAgro Cherepovets, Russia
|
Eddy-current testing of pressure vessels' heat exchanger tubes
|
-
Nondestructive testing
- Issuing recommendations for equipment
operating and repairing
|
2017
|
ZNIGO,
Borisoglebsk,
Voronezh region, Russia
|
Inspection of heat
exchanger tubes of reflux condenser (urea production unit)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2017
|
Sorovskneft,
Tyumen, Russia
|
Inspection of heat exchanger tubes of S&T
oil heaters
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2016
|
EuroChem, NevAzot, Nevinnomyssk,
Russia
|
Inspection of heat exchanger tubes (urea plant 2A)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2016
|
Synthesis reactor dome relining (pos.6/1, plant №2)
|
-
Development of repair method
& technique
-
Repair works
|
2016
|
Grodno Azot,
Grodno,
Belarus
|
Synthesis reactor relining on 2400 mm height (pos. R-201, Urea-3)
|
-
Development of repair method
&technique
-
Repair works
|
2016
|
Technical and
corrosion inspection of HP reactor pos. R-201, HP stripper pos. E-201(Urea-3)
|
- Nondestructive testing
- Issuing recommendations for equipment
operating and repairing
|
2016
|
Egyptian Fertilizers
Company (EFC), El Ain Sukhna,
Egypt
|
Relining of urea
reactor 322-R-00 (Urea Plant EFC-1 Suez Fertilizers Co.)
|
-
Inspection
-
Development of repair method
& technique
-
Repair works
|
2016
|
UralChem, Azot,
Berezniki,Russia
|
Relining of urea synthesis reactor
pos. R-901
|
-
Development of repair method
& technique
-
Repair works
|
2016
|
EuroChem, NAK Azot, Novomoskovsk, Russia
|
Corrosion and technical inspection of urea synthesis reactor pos. 6/1 (urea plant №2)
|
- Nondestructive testing
- Issuing recommendations for equipment
operating and repairing
|
2016
|
Eddy-current testing of pressure vessels' heat exchanger tubes
|
- Nondestructive testing
- Issuing recommendations for equipment
operating and repairing
|
2016
|
PhosAgro Cherepovets, Russia
|
Eddy-current testing of heat- exchanger tubes of carbamate
condenser pos. Е-202
|
- Nondestructive testing
- Issuing recommendations for equipment operating and repairing
|
2016
|
«Meleuz mineral fertilizers», Meleuz, Russia
|
Replacement of old
tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit)
|
- Nondestructive testing
- Development of repair method &technique
- Repair works
|
2015
|
Grodno Azot, Grodno, Belarus
|
Corrosion and
technical inspection of synthesis reactor pos.R-201, high-pressure scrubber
pos. Е-203,
high-pressure stripper pos. Е-201, high-pressure condenser pos.Е-202 (urea unit 3 and urea unit 4)
|
-
Nondestructive testing
-
Issuing recommendations for
equipment operating and repairing
|
2015
|
Nitrogénművek Zrt.,
Pétfürdő
Hungary
|
Corrosion and
technical inspection of stripper pos. E-201 (urea production)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2015
|
Azot, Cherkassy,
Ukraine
|
Development of
technical documentation to replace three lining belts of cylindrical section
of urea synthesis reactor.
|
-
Technical documentation development
-
Field supervision during
manufacturing of equipment parts
|
2015
|
Minudobreniya,
Rossosh, Russia
|
Inspection of heat
exchanging tubes of nitrous gases coolers (nitric acid production unit AK-72, the second
stage)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2015
|
TogliattiAzot,
Togliatti,
Russia
|
Corrosion
and technical inspection of the main
technological equipment, pipelines and valves for urea plant №1,2
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2015
|
PhosAgro Cherepovets, Russia
|
Eddy-current testing of pressure vessels' heat exchanger tubes
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2015
|
DniproAZOT,
Dneprodzerzhinsk,
Ukraine
|
Technical inspection of heat exchanger equipment (urea plant №1, urea plant №2)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2014
|
Grodno Azot,
Grodno,
Belarus
|
Corrosion inspection
of HP urea synthesis reactor pos. R-201, HP stripper pos. E-201, HP scrubber pos. E-203 (urea plant №3)
HP stripper pos. E-201, HP condenser pos.
E-202, additional heat exchanger
section for preheater pos. E-302 (urea plant №4)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2014
|
Repair of two lining
belts (urea synthesis reactor pos.
R-201, urea plant №3)
|
-
Technical documentation development
-
Quality control of the works performed.
|
2014
|
Azot, Cherkassy,
Ukraine
|
Corrosion and
technical inspection of gas pipelines, HP heat exchangers, tanks and
vessels of plant M-6 (synthesis reactor pos. R-201, stripper pos. E-201, condenser
pos. E-202, pipelines reg. No 481,
532, 534, 535)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2014
|
Inspection of heating chamber exchanging tubes
(evaporation unit pos. 5/1 and 5/2,
plant M-9)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2014
|
DniproAZOT
Dneprodzerzhinsk,
Ukraine
|
Corrosion and
technical inspection of lining and internal devices (reactor, stripper,
condenser, scrubber) for urea plant № 1 and urea plant № 2.
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2014
|
Kuibyshev Azot,
Togliatti,
Russia
|
Corrosion and
technical inspection of main equipment for urea plant № 4
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2014
|
EuroChem,
NAK Azot,
Novomoskovsk,
Russia
|
Corrosion inspection
of heat exchange equipment (urea plant №3 (line 2)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2014
|
Severodonetsk Azot Association,
Severodonetsk,
Ukraine
|
Corrosion and technical inspection of synthesis
reactors internal surface (urea
plant M-3)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
Azot, Cherkassy,
Ukraine
|
Inspection and
surveying of reformer and heat exchanger equipment for plant A-5
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
Grodno Azot,
Grodno,
Belarus
|
Corrosion inspection of urea synthesis reactor for urea plant № 4.
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
Technical inspection of urea synthesis reactor and HP condenser for urea plant № 3
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
Azot, Kemerovo,
Russia
|
Synthesis reactor repair support
services
|
-
Technical documentation development
-
Technical inspection
-
Quality control of the works performed
|
2013
|
PhosAgro Cherepovets, Russia
|
Eddy-current testing of pressure vessels' heat exchanger tubes
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
EuroChem,
NAK Azot,
Novomoskovsk,
Russia
|
Corrosion and technical inspection
of main technological equipment
(urea plant №3 (first line)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
Acron,
Veliky Novgorod,
Russia
|
Inspection of heat exchanging tubes of condenser pos. Т-506 (urea unit № 5).
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
Corrosion and technical inspection of urea synthesis reactor K-501 (urea unit № 5)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
EuroChem, NevAzot,
Nevinnomyssk,
Russia
|
Corrosion inspection using eddy current testing of equipment (plant № 2А, 12А)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
AB Achema,
Lithuania
|
Corrosion inspection of urea synthesis reactor (Ø1600mm) and HP mixer.
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
FNTC Group spol.s
r.o,
Czesh Republic
|
Corrosion and technical inspection of urea plant, ammonium nitrate and nitric acid units for FerganaAzot
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
Azot, Cherkassy,
Ukraine
|
Corrosion and technical inspection of equipment (urea plant M-2)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
Grodno Azot,
Grodno, Belarus
|
Inspection of absorber ferromagnetic heat exchanger tubes (ammonia plant № 4)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2013
|
Razi Petrochemical Company
Iran
|
Corrosion inspection of urea
plant equipment
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2012-2013
|
Acron,
Veliky Novgorod,
Russia
|
Corrosion and technical inspection of distillation column pos.
7/2 (urea plant)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2012
|
Salavat Neftekhimremstroy, Salavat,
Russia
|
Repair of urea synthesis reactor
pos. 6-1, 6-2 (Gas and Chemical
plant «Gasprom nephtehim Salavat»,
plant № 50)
|
-
Corrosion and technical inspection
-
Repair works
-
Quality control of the works performed
|
2012
|
Grodno Azot, Grodno, Belarus
|
Heat- exchanger tubes inspection (HP equipment of urea plant №3)
|
-
Nondestructive testing
|
2012
|
Azot,
Cherkassy,
Ukraine
|
Ferromagnetic heat- exchanger tubes inspection (pos. 1140-C, ammonia
plant A-5)
|
-
Nondestructive testing
|
2012
|
Corrosion and technical inspection of equipment (urea plant M-6)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2012
|
Azot, Kemerovo,
Russia
|
Emergency repair of the lining of synthesis reactor pos.R-901 (urea plant).
|
-
Location of the defect
-
Reactor body repairing
-
Quality control of the works performed
|
2012
|
EuroChem, NevAzot,
Nevinnomyssk,
Russia
|
Corrosion and technical inspection of equipment (urea plant №2)
|
-
Nondestructive testing
-
Issuing recommendations for equipment operating and repairing
|
2012
|
Concern Stirol,
Gorlovka,
Ukraine
|
Complex repair of synthesis reactor pos.
R-901 (urea plant, location1)
|
-
Technical documentation development
-
Repair works
-
Technical inspection of the works performed.
|
2012-2013
|
Concern Stirol,
Gorlovka,
Ukraine
|
Emergency repairing of
synthesis reactor pos. R-901 (urea
plant, location 1)
|
-
Location of the defect
-
Reactor body repairing
-
Technical inspection of the works performed
|
2012-2013
|
EuroChem,
NAK Azot,
Novomoskovsk,
Russia
|
Corrosion and technical inspection of critical equipment (urea plant №
3, second line)
|
-
Nondestructive testing
|
2012
|
Acron,
Veliky Novgorod,
Russia
|
Lining replacement of synthesis reactor pos. 6/4 (urea plant)
|
-
Technical documentation development
-
Technical inspection
-
Quality control of
the works performed
|
2012-2013
|
UralChem,
Azot, Berezniki,
Russia
|
Repair of cylindrical section of the lining of synthesis reactor pos.
R-901 (urea plant).
|
-
Corrosion and technical inspection of lining
-
Technical documentation development
-
Technical inspection
-
Quality control of the works performed.
|
2012
|
Gazprom Neftekhim Salavat
Salavat,
Russia
|
Lining replacement of the bottom
parts of urea synthesis and distillation column (urea plant №50)
|
-
Technical documentation development
|
2012
|
Agro-Cherepovets, Cherepovets,
Russia
|
Corrosion and technical inspection
of critical equipment (urea plant).
|
-
Corrosion and technical inspection of lining
using NDT
-
recommendation issue for equipment operating and repairing
|
2012
|
Azot,
Kemerovo,
Russia
|
Emergency repairing of the heat exchanger cover
pos. E-902 (urea plant)
|
-
Location of the defect
-
Repair support services
|
2012
|
Togliattiazot,
Togliatti, Russia
|
Repair of the lining of HP stripper of urea plant
|
-
Location of the defect
-
Repair support services
|
2012
|
Gazprom Neftekhim Salavat,
Salavat,
Russia
|
Emergency repairing of synthesis reactor 6/1 (urea plant №50).
|
-
Location of the defect
-
Repair support services
|
2011
|
EuroChem,
NAK Azot,
Novomoskovsk,
Russia
|
Corrosion and technical inspection of critical equipment (urea plant № 3,
first line)
|
-
Inspection
|
2011
|
Odessa Port Plant,
Yuzhny,
Ukraine
|
Corrosion and technical inspection of high pressure equipment (urea plant № 2)
|
-
Inspection
|
2011
|
Acron, Veliky
Novgorod, Russia
|
Corrosion and technical inspection of urea synthesis reactor
(urea plant № 5)
|
-
Inspection
|
2011-2012
|
UralChem,
Azot, Berezniki,
Russia
|
Repair of the lining of urea unit synthesis
reactor
|
-
Location of the defect
-
Repair support services
|
2011
|
EuroChem, NevAzot,
Nevinnomyssk,
Russia
|
Repair of two lining belts in urea reactor (urea
plant 2А)
|
-
Technical documentation development
-
Repairing works assistance
-
Quality control of the works performed
|
2011
|
PhosAgro, Cherepovets, Russia
|
Cleaning
of heat exchanging equipment of evaporation unit (first stage)
|
-
Removing scales from evaporating unit (first stage) tubes by thermo-pneumo-abrasive
method
|
2011
|
Acron,
Veliky Novgorod,
Russia
|
Technical
guidance for relining of urea
synthesis reactor pos. 6/2 of
urea plant
|
-
Technical documentation development
-
Repairing works assistance
-
Quality control of the works performed
|
2011
|
EuroChem, NevAzot,
Nevinnomyssk,
Russia
|
Corrosion and
technical inspection of equipment (plants №2, №2А)
|
-
Inspection
|
2011
|
DniproAZOT
Dneprodzerzhinsk,
Ukraine
|
Corrosion and
technical inspection of equipment (urea plant№1 and urea plant №2)
|
-
Nondestructive testing
-
Recommendation issue for equipment operating and repairing
|
2011-2012
|
Concern Stirol,
Gorlovka,
Ukraine
|
Corrosion and
technical inspection of sections №1 and №2 (urea plant)
|
-
Inspection
|
2011
|
Odessa Port Plant,
Yuzhny,
Ukraine
|
Corrosion and technical inspection of
equipment (urea units №1and № 2)
|
-
Inspection
|
2010
|
EuroChem, NevAzot, Nevinnomyssk,
Russia
|
Corrosion and technical inspection of
equipment (urea plant №2)
|
-
Inspection
|
2010
|
Technical guidance for partial relining of
synthesis reactor 6/3
|
-
Technical documentation development
-
Technical guidance of repair works
|
2010
|
Acron,
Veliky Novgorod,
Russia
|
Corrosion inspection of urea synthesis
reactor 6/2
|
-
Inspection
|
2010
|
Industrial safety expertise
|
-
Diagnostics of urea synthesis reactor 6/1 and 6/4
|
2010
|
Cleaning of heat exchanging equipment of MP
distillation
|
-
Removing scales from heat exchanging tubes by pneumocurrent method
|
2010
|
Azot, Cherkassy,
Ukraine
|
Corrosion inspection of equipment (urea plant
M-2 and M-6)
|
-
Inspection
|
2010
|
Relining of upper part of urea synthesis
reactor (plant M-2)
|
-
Development of technical documentation
-
Repair works
-
Quality control of the works performed
|
2010
|
PhosAgro, Cherepovets, Russia
|
Corrosion and technical inspection of urea
plant equipment
|
-
Nondestructive testing
|
2010
|
DniproAzot, Dneprodzerzhinsk,
Ukraine
|
Corrosion and technical inspection of
equipment (urea plant №1 and urea plant № 2)
|
-
Inspection
|
2010
|
EuroChem, NAK Azot, Novomoskovsk,
Russia
|
Technical guidance of partial relining of
synthesis reactor 6/2
|
-
Technical documentation development
-
Repairing works assistance
-
Quality control of the works performed
|
2010
|
Azot, Kemerovo, Russia
|
Corrosion inspection of urea synthesis
reactor
|
-
Inspection
|
2010
|
EuroChem, NevAzot , Nevinnomyssk,
Russia
|
Corrosion and technical inspection (urea
units №2 and №2a)
|
-
Inspection
|
2009
|
Industrial safety expertise of technical
devices (urea plant №2)
|
-
Corrosion and technical inspection
|
2008
|
EuroChem, NAK Azot,
Novomoskovsk,
Russia
|
Repair of the
lining of synthesis reactor, separator and stripper (urea plant №3)
|
-
Technical assistance
|
2008
|
Azot,
Kemerovo,
Russia
|
Repair of urea synthesis reactor
|
-
Development of technical documentation and
technical guidance for urea synthesis reactors repair
|
2008
|
DniproAzot,
Dneprodzerzhinsk,
Ukraine
|
Industrial safety expertise of technical
means
|
-
Corrosion and technical inspection
|
2008
|
R&D Institute of Measurement Systems,
Nizhny Novgorod,
Russia
|
Process diagnostic to determine the remaining service life of
equipment and pipelines
of treatment plants.
|
-
Inspection
|
2007
|
Rikor Electronics, Arzamas, Russia
|
Industrial safety expertise of technical
means
|
-
Equipment diagnostics
|
2007
|
PhosAgro, Cherepovets, Russia
|
Industrial safety
expertise of pressurized vessels (urea
plant)
|
-
Equipment diagnostic and expert conclusion
for service life extension of equipment
|
2007
|
EuroChem, NevAzot,
Nevinnomyssk,
Russia
|
Repair of two
lining belts (urea reactor)
|
-
Development of technical documentation
-
Supervising manufacturing of the material
-
Technical assistance
-
Field supervision
|
2007
|
EuroChem,
NAK Azot, Novomoskovsk,
Russia
|
Inspection of
stripper tubes by eddy-current method
|
-
Inspection
|
2007
|
Corrosion
inspection of stripper
|
-
Inspection
|
2007
|
FerghanaAzot,
Uzbekistan
|
Corrosion
inspection of critical vessels and pipelines (urea plant)
|
-
Inspection
|
2007
|
DniproAzot,
Dneprodzerzhinsk,
Ukraine
|
Corrosion and
technical inspection of HP reactor,
stripper, condenser (plant №2)
|
-
Inspection
-
Repair procedure development
-
Repair works
|
2007
|
Equipment procurement
|
For production complexes
|
Metafrax, Gubakha, Russia
|
Ammonia-urea-melamine complex
|
Equipment procurement for OSBL facilities
|
2016-2021
|
Metafrax, Gubakha, Russia
Casale SA,
Switzerland
|
Ammonia-urea-melamine
complex
|
Equipment procurement for prilling tower construction
|
Ammoni,
Mendeleevsk, Russia
|
Ammonia- methanol-
urea complex
|
Equipment procurement for OSBL facilities
|
2010-2015
|
For ammonia plants
|
PhosAgro,
Cherepovets, Russia
|
Ammonia production
unit AM-3 (capacity 2200 TPD)
|
-
Equipment procurement for analytical laboratory
|
2016-2017
|
For urea plants
|
Nondisclosed | Urea plant technical
upgrade
| Supply of equipment and materials
| 2024-present |
Togliattiazot
Togliatti, Russia
|
Urea production unit
|
Supply of distribution tubes for stripper
|
2024-present
|
Azot
Kemerovo,Russia
|
Urea production unit
|
Supply of conversion booster
|
2024-present
|
Nondisclosed
|
Urea production unit
|
Supply of urea grade steel parts
|
2024 |
Nondisclosed
| Urea production unit | Equipment supply
(tray for synthesis reactor, accessories for stripper)
| 2023-2024 |
OHK UralChem, Azot branch
Berezniki, Russia
| Technical upgrade of the synthesis
reactor for urea production
| - Equipment supply - Equipment installation | 2022 |
MOPCO, Egypt | Urea production unit
| - Equipment supply - Equipment installation (lining elements of reactor 322R001)
| 2022 |
NAK Azot,
Novomoskovsk, Russia
| UAN production unit on the basis of Urea-2 unit with capacity
of 1200 MTPD
| Supply of packaged unit
| 2020-2021 |
Azot
Kemerovo,Russia
| Urea production unit
| Equipment supply
(vortex mixer)
| 2021 |
Acron, Veliky Novgorod,
Russia
| Technical upgrade of urea unit
| Critical equipment
supply
| 2020 |
Chambal Fertilizers and Chemicals Limited (CFCL), India
| Supply of vortex mixer for urea synthesis reactor in order to save energy,
as well as services on equipment installation in the urea synthesis reactor No.1
| - Equipment supply - Equipment installation
| 2018 |
Acron,
Veliky Novgorod,
Russia
| Urea production unit №6 construction with capacity 600 TPD | Equipment procurement | 2017-2018 |
Rashtriya Chemicals and Fertilizers Ltd., Mumbai, India | Urea units modernization (Thal) | - Equipment supply (set of internals) for urea reactors
- Equipment installation (three
sets of internals) for urea reactors
| 2017-2018 |
Gujarat Narmada Valley Fertilizers & Chemicals Ltd, India | Urea unit modernization | Supply and installation of equipment (vortex
mixer) for synthesis reactor
| 2017 |
KuibyshevAzot,
Togliatti, Russia
|
Technical
modernization of urea unit № 4 (evaporation, hydrolysis and desorption
sections)
|
-
Equipment procurement
|
2016-2017
|
Rashtriya Chemicals and
Fertilizers Ltd., Mumbai, India
|
RCF Trombay V urea unit modernization
|
- Equipment supply (set of internals) for urea reactor
- Equipment installation (set of internals) for urea reactor
|
2015 -2016
|
Casale SA, Switzerland
|
Urea production unit
and new prilling tower construction (capacity 2200 TPD) at TogliattyAzot
site
|
Equipment supply for prilling tower and new urea reactor auxiliary
devices
|
2015-2016
|
EuroChem, NAK Azot,
Novomoskovsk,Russia
|
Revamp of urea unit 2 (gas vent elimination)
|
-
Equipment procurement
|
2012-2015
|
EuroChem, NAK Azot,
Novomoskovsk,Russia
|
Technical
modernization of the urea production plant №2
|
-
Equipment procurement
|
2013-2016
|
32,5% urea
solution production unit (capacity 100000 TPY) including urea
solution treatment unit on the basis of urea plant № 2 evaporation unit
|
-
Equipment procurement
|
2013-2015
|
Nagarjuna
Fertilizers and Chemicals Limited,
India
|
Urea synthesis unit № 2 modernization
|
- Equipment supply
(vortex mixer for synthesis
reactor)
|
2013
|
Acron,
Veliky Novgorod, Russia
|
Urea production units (1-4) revamping aimed to capacity increase up to 2000 TPD and feedstock/energy saving
|
-
Equipment procurement
|
2016
|
Azot, Cherkassy, Ukraine
|
Design and procurement of HP stripper pos. E-201
with capacity increase up to
1500 tpd (urea plants M-2)
|
-
HP stripper procurement
|
2011-2012
|
Azot,
Kemerovo, Russia
|
Urea production unit revamping with high speed drum
granulator installation
|
-
Equipment procurement
|
2011-2013
|
Acron,
Veliky Novgorod, Russia
|
Evaporation system for urea production unit and prilling tower
modernization with capacity increase
|
-
Equipment procurement
|
2011-2013
|
Maxam-Chirchik,
Chirchik,
Uzbekistan
|
Modernization and
technical upgrading of urea unit
|
-
Equipment procurement
-
Commissioning
|
2010-2012
|
UralChem,
Azot, Berezniki, Russia
|
Urea synthesis
reactor modernization
|
-
Set of Internal Devices procurement
-
Field supervision
|
2010
|
Salavatnefteorgsintez
Salavat, Russia
|
Prilling towers’ modernization for urea plant №24
|
-
Equipment procurement
-
Commissioning
|
2009-2010
|
PhosAgro Cherepovets,
Russia
|
Prilling tower for urea production (capacity of
1500 TPD)
|
-
Equipment procurement
|
2008-2012
|
Acron,
Veliky Novgorod,
Russia
|
Urea
unit №5 on the basis of relocated unit
|
-
Equipment procurement
|
2007–2011
|
EuroChem,
NAK Azot, Novomoskovsk,
Russia
|
Revamp of urea
plant №3 with capacity increase to 2000 TPD
|
-
Material procurement
|
2007–2010
|
Severodonetsk Azot
Association, Severodonetsk, Ukraine
|
Urea unit revamp
with capacity increase from 1200 up to 1500 TPD
|
-
Equipment procurement
|
2007–2010
|
EuroChem, NevAzot ,
Nevinnomyssk,
Russia
|
Urea evaporation
unit for melamine plant
|
-
Equipment procurement
|
2008 – 2010
|
KuibyshevAzot,
Togliatti,
Russia
|
Revamp of urea unit
with capacity increase
|
-
Equipment procurement
-
Field supervision
|
2007–2008
|
Severodonetsk Azot
Association,
Severodonetsk,
Ukraine
|
Urea unit revamp
with capacity increase from 1000 up to 1200 TPD
|
-
Equipment procurement
|
2006-2007
|
PhosAgro,
Cherepovets,
Russia
|
Revamping of
distillation unit with capacity increase (urea production plant)
|
-
Equipment procurement
|
2007
|
Salavatnefteorgsintez
Salavat, Russia
|
Revamping of urea
plant №50
|
-
Equipment procurement
|
2006 –2008
|
Azot, Kemerovo,
Russia
|
Revamp of urea
synthesis unit
|
-
Procurement of internals into reactor pos.
R-101
|
2006
|
Grodno Azot,
Grodno, Belarus
|
Revamp of urea
production unit, installation of recuperator
|
- Equipment procurement
- Field supervision
|
2006
|
Acron,
Veliky Novgorod,
Russia
|
Installation of the
5th urea synthesis reactor
|
Equipment procurement
|
2006
|
NevAzot,
Nevinnomyssk,
Russia
|
Revamping of urea
production plant №2
|
-
Equipment procurement
-
Field supervision
|
2006
|
Azot, Kemerovo,
Russia
|
Revamp of urea
synthesis unit
|
-
Procurement of internals into reactor pos.
R-101
-
Field supervision
|
2006
|
For ammonia nitrate production units
|
KazAzot,
Aktau, Kazakhstan
|
Ammonia nitrate production unit modernization: HSDG for ammonia nitrate manufacturing
|
Equipment procurement
|
2011-2012
|
For storages
|
Pervouralsky novotrubny zavod, Perovuralsk,
Russia
|
Revamp of liquid ammonia storage unit № 33
|
Equipment procurement
|
2006-2007
|
Zawolzhsky Motorny Zavod,
Zavolshye, Russia
|
Revamp of sulphuric
acid storage unit
|
Equipment supply for turnkey project
|
2006-2007
|
Petrol storage unit
|
Equipment supply for turnkey project
|
2006
|
Nizhegorodsky mashinostroitelny zavod,
Russia
|
Revamping of
chlorine storage unit and chlorinator
|
Equipment supply for turnkey project
|
2006-2007
|
For other facilities
|
NAK Azot,
Novomoskovsk, Russia ( MHK EuroChem)
| Wet scrubbing
unit for dusty air – foam hydrofilter of urea unit
|
Equipment procurement
|
2019
|
QAFCO (Qatar Fertilizer Company),
Qatar
|
Multipurpose
High Speed Drum Granulation (HSDG) Pilot Plant for production of Granulated Urea with additives, capacity
100 kg per hour
|
-
Equipment procurement
- Installation supervision,
-
Commissioning
|
2014-2015
|
PVFCCо,
Phu My I, Ba Ria Vung Tau, Vietnam
|
HSDG
unit for production of compound
fertilizers (capacity 100 kg/h)
|
-
Equipment procurement
- Installation supervision
-
Commissioning
|
2014-2015
|
Zawolzhsky
Motorny Zavod,
Zavolshye, Russia
|
Project development
and construction of testing station for diesel engines
|
Equipment supply for turnkey project
|
2009
|
For equipment repair works
|
NAK Azot,
Novomoskovsk, Russia ( MHK EuroChem)
|
Repair of Urea reactor item 11-R-1 at Urea-3(1) unit
|
Supply of lining elements
|
2024 |
NAK Azot,
Novomoskovsk, Russia ( MHK EuroChem)
| Repair of Urea reactor item 11-R-1 at Urea-3(1) unit
| Supply of lining elements
| 2024 |
Nevinnomyssky Azot,
Nevinnomyssk, Russia ( MHK EuroChem)
| Repair of cylindrical section of the lining
of synthesis reactor item 6/1, unit No.2 | Equipment procurement
| 2021 |
Meleuz
mineral fertilizers Meleuz,
Russia
|
Replacement of old
tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit AS-72М)
|
Steel structures supply
for repairs works
|
2017
|
Grodno Azot, Grodno, Belarus
|
Repair of the lining of the synthesis
reactor neck (item R-201, Urea-3
unit)
|
Steel structures supply
for repairs works
|
2017
|
Egyptian Fertilizers
Company (EFC), El Ain Sukhna,
Egypt
|
Lining repairs
works at urea reactor item 322-R-00
|
Steel structures supply
for repairs works
|
2016
|
Meleuz
mineral fertilizers, Meleuz,
Russia
|
Replacement of old tubes
of evaporation unit (pos.Т-10, ammonium nitrate production unit)
|
Equipment procurement
|
2015
|
Grodno Azot, Grodno, Belarus
|
Repair of two lining
belts (urea synthesis reactor pos.
R-201, urea plant №3) | Steel structures supply
for repairs works
|
2014
|
Corrosion
inspection of urea synthesis
reactor (urea plant №4) | Steel structures supply
for repairs works
|
2013
|
Azot, Kemerovo, Russia
|
Synthesis reactor repair support
services
|
Steel structures supply
for repairs works
|
2013
|
Concern Stirol,
Gorlovka, Ukraine
|
Complex repair of synthesis reactor pos.
R-901 (urea unit, location1)
|
Steel structures supply
for repairs works
|
2012-2013
|
Acron,
Veliky Novgorod, Russia
|
Lining replacement of synthesis reactor pos. 6/4 (urea unit )
|
Steel structures supply
for repairs works
|
2012-2013
|
UralChem, Azot Berezniki, Russia
|
Repair of cylindrical section of the lining of synthesis reactor pos. R-901 (urea unit)
|
Steel structures supply
for repairs works
|
2012
|
EuroChem, NevAzot,
Nevinnomyssk, Russia
|
Repair of two lining belts in urea reactor (urea unit 2А)
|
Steel structures supply
for repairs works
|
2011
|
Acron,
Veliky
Novgorod, Russia
|
Set of internal devices installation into urea plant reactor №5
|
Steel structures supply
for repairs works
|
2011
|
Technical guidance for relining of urea synthesis reactor pos. 6/2 of urea plant
|
Steel structures supply
for repairs works
|
2011
|
Azot, Cherkassy,
Ukraine
|
Relining of upper part of urea synthesis
reactor (plant M-2)
|
Steel structures supply
for repairs works
|
2010
|
EuroChem, NAK Azot, Novomoskovsk,
Russia
|
Technical guidance of partial relining of
synthesis reactor 6/2
|
Steel structures supply
for repairs works
|
2010
|
EuroChem, NevAzot,
Nevinnomyssk,
Russia
|
Repair of two
lining belts (urea reactor)
|
-
Supervising manufacturing of material
|
2007
|
Kuibyshev Azot,
Togliatti, Russia
|
Revamping of urea unit storage
|
-
Field supervision
-
Commissioning works
|
2007
|
Fertalge Industries
SPA,
Algeria
|
Prilling tower
for urea production
|
-
Field supervision
|
2002-2005
|