Customer |
Project |
Scope of services of NIIK |
Year |
|
EPC/Turnkey projects |
||||
Metafrax, Gubakha, Russia |
Ammonia-urea-melamine complex |
- Сonstruction of OSBL facilities on a turn- key basis (basic and detail design, equipment procurement, assembly&installation, start- up & commissioning) |
2016 to present |
|
PhosAgro, Cherepovets, Russia Mitsubishi Heavy Industries, Japan |
Ammonia production unit AM-3 (capacity 2200 TPD) |
- Turn-key project for construction of a new analytical laboratory (ammonia production plant) |
2016-2017 |
|
Ammoni, Mendeleevsk, Tatarstan, Russia |
Ammonia-methanol-urea complex |
- Сonstruction of OSBL facilities on a turn- key basis (basic and detail design, equipment procurement, assembly&installation, start- up & commissioning) |
2010-2015 |
|
Zawolzhsky Motorny Zawod, Zavolshye, Russia |
Construction of testing station for diesel engines |
- Turnkey project |
2009 |
|
Zawolzhsky Motorny Zawod, Zavolshye, Russia |
Revamp of sulphuric acid storage unit |
- Turnkey project |
2006-2007 |
|
Petrol storage unit |
- Turnkey project |
2006 |
||
Nizhegorodsky machine-building plant, Russia |
Revamping of chlorine storage unit and chlorinator |
- Turnkey project |
2006-2007 |
|
Design engineering |
||||
Production complexes |
||||
Not disclosed (Confidential Information) | Ammonia-urea- complex | - Adaptation of licenser’s basic engineering package to Russian norms and regulations | 2020 | |
UCC Shchekinoazot Ltd., Schekino, Russia China National Chemical Engineering Co. (CNCEC), Ltd., China |
Urea-Ammonia Complex |
- Adaptation of the Basic Projects of the Licensors to the norms and rules of the Russian Federation - Design documentation for the complex (ISBL / OSBL objects) |
2019 - 2021 | |
- Adaptation of Working Documentation developed by CNCEC to the norms and rules of the Russian Federation | Under development | |||
Metafrax, Gubakha, Russia, Casale S.A., Switzerland | Ammonia-urea-melamine complex |
- Basic design for OSBL
facilities (Melamine 2 unit) - Revision of basic design for prilling tower with capacity 1150 TPD |
2018 to present |
|
Metafrax, Gubakha, Russia |
Ammonia-urea-melamine complex |
- Development of detail design for site arrangement - Adaptation of licenser’s basic engineering package to Russian norms and regulations - Authority package development (ISBL/OSBL) - Construction of OSBL facilities on a turn-key basis (detail design, equipment procurement, assembly& installation, start-up&comissioning) |
2016 to present |
|
Metafrax, Gubakha, Russia Casale S.A., Switzerland |
Ammonia-urea-melamine complex |
- Development of basic design for OSBL facilities and prilling tower - Detail design (ISBL facilities’ architectural and civil documentation) |
||
Ammoni, Mendeleevsk, Tatarstan, Russia |
Ammonia-methanol-urea complex |
- Development of authority package (ISBL/OSBL) - Сonstruction of OSBL facilities on a turn- key basis (detail design, equipment procurement, assembly&installation, start- up & commissioning) |
2010-2015 |
|
Ammoni, Mendeleevsk, Tatarstan, Russia Mitsubishi Heavy Industries, Ltd. (MHI), Japan |
Ammonia-methanol-urea complex |
- Adaptation of licenser’s documentation on ISBL facilities to Russian norms and regulations, - Detail design (architectural and civil documentation for urea production ISBL facilities) - Licenser’s equipment certification |
||
ICM, Saint-Petersburg, Russia |
Ammonia –urea complex (Vistino, Kingisepp, Leningrad region) |
- Adaptation of BE/FEED licensor’s documentation to Russian norms and Regulations - Development of authority package (ISBL/OSBL) |
2013-2015 |
|
Ammonia production units |
||||
Geammarco Vetrocoke Srl, Italy |
CO2 removal system modernization (ammonium production unit designed by TEC) aimed at capacity increase up to 2000 TPD at Perm mineral fertilizer site. |
- - Authority package development - Development of authority package including documentation for CO2 removal unit |
2018 - 2019 |
|
Haldor Topsoe (HTAS), Denmark |
Ammonia unit modernization aimed at capacity increase up to 2000 TPD at Uralchem site (Kirovo-Chepetsk, Kirov region) |
- Adaptation of design basis to Russian norms and regulations - Development of authority package including documentation for CO2 removal unit |
2015 -2017 |
|
Tulagiprohim, Tula, Russia |
Ammonia production unit and liquid ammonia storage unit (Kingisepp Plant) |
- Development of authority package for OSBL facilities |
2014-2015 |
|
PhosAgro, Cherepovets, Russia |
Ammonia production unit AM-3 (capacity 2200 TPD) |
- Adaptation of licenser’s basic engineering package to Russian norms and regulations - Development of basic and detailed design |
2013-2017 |
|
PhosAgro, Cherepovets, Russia Mitsubishi Heavy Industries, Japan |
Ammonia production unit AM-3 (capacity 2200 TPD) |
- Detail design (architectural and civil documentation) - Turn-key project for construction of a new analytical laboratory (ammonia production plant) |
2014-2017 2016-2017 |
|
Not disclosed (Confidential Information) |
Ammonia production unit |
- Adaptation of licenser’s basic engineering package to Russian norms and regulations - Authority package development Detail design development |
2013-2017 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Commercial grade aqua ammonia production unit (plant №11) |
- Authority package development - Detail design development |
2013-2014 |
|
Not disclosed (Confidential Information) | Methanol production unit |
- Adaptation of the Licensor's FEED package to the rules and regulations of the Russian Federation - Development of FEED parts in the scope of the construction part and the HVAC system - Project documentation |
2020-2021 | |
OOO «G T M 1», Volgograd, Russia | Methanol production |
- Adaptation of the Licensor's FEED package to the rules and regulations of the Russian Federation - Project documentation |
Under development | |
Metafrax, Gubaha, Russia | Technical modernization of methanol production unit (integration within an ammonia-methanol-urea complex) | - Detailed design development | Under development | |
Technolizing, Skovorodino, Russia | Methanol production unit with capacity 3000 TPD | Adaptation of licenser’s basic engineering package to Russian norms and regulations |
2018 – 2020 |
|
Engineering research assistance |
Under development |
|||
Engineering&Consulting services on organizational issues related to public hearings |
2021 |
|||
Nizhnekamskneftekhim, Nizhnekamsk, Tatarstan | Methanol production with capacity 500 000 TPY |
- Authority package
development - Detailed design development - Field supervision |
Under development |
|
Metafrax, Gubaha, Russia, Casale SA, Switzerland | Methanol production unit modernization including integration to ammonia-urea-methanol complex |
- Adaptation of licenser’s
basic engineering
package to Russian
norms and regulations - Detailed design of civil part |
2018 to present |
|
ShchekinoAzot, Shchekino, Russia | Methanol production unit with capacity 500 000 TPY |
- Adaptation of licenser’s basic engineering package to Russian norms and regulations - Authority package development - Detail design development |
2018 – 2021 |
|
- Field supervision |
Under development |
|||
Baltic Gas Chemical Company, Saint-Petersburg, Russia |
Baltic methanol production plant |
- Adaptation of licenser’s basic engineering package to Russian norms and regulations - Authority Package development - Detail design development |
2015 – to present |
|
Urea production units |
||||
Not specified under the terms of confidentiality | Technical re-equipment of the synthesis column for urea production | Working documentation | 2020 - 2021 | |
JSC Nevinnomyssky Azot, Nevinnomyssk, Russia (EuroChem Group AG) | Technical re-equipment of the evaporation unit of workshop No. 2-a of urea production | Working documentation | 2020 - 2021 | |
ООО “Novomoskovsk-Remstroiservis”, Novomoskovsk, Russia | Modernization of the pre-decomposition unit pos. 11-E-2A in the urea plant No. 3 (stage 1) of NAK Azot JSC | Working documentation | 2020 | |
Not disclosed (Confidential Information) | Urea production unit |
- Detail design development (civil, electrical, HVAC sections) - Adaptation of detail design to Russian norms and regulations |
Under development | |
KuibyshevAzot, Togliatti, Russia | Technical modernization of urea plant №4 |
- Authority Package
development - Detail design development |
2018 - 2019 |
|
Novgorodsky GIAP, Veliky Novgorod, Russia |
Urea unit № 6 modernization aimed at capacity increase to 2050 TPD (Acron site) |
- Main technical solutions development - Authority Package development - Detail design development |
2021 |
|
Urea granulation unit with capacity 2000 TPD (Acron site) |
- Authority Package
development - Detail design development |
2018 to present |
||
New urea production unit №6 with capacity 600 TPD (Acron site) |
- Authority Package development - Detail design development |
2018 |
||
Urea unit №5 modernization aimed at capacity increase to 1250 TPD (Acron site) |
- Authority Package development - Detail design development |
2017 |
||
KuibyshevAzot, Togliatti, Russia Stamicarbon, The Netherlands |
Urea production unit with capacity 1500 TPD (at KuibyshevAzot site) |
- Adaptation of licenser’s documentation on ISBL facilities to Russian norms and regulations, - Basic design for urea production OSBL facilities - Authority Package development |
2017 - 2019 |
|
KuibyshevAzot, Togliatti, Russia |
Technical modernization of urea unit № 4 (evaporation, hydrolysis and desorption sections) |
- Detail design development |
2016-2017 |
|
Minudobreniya, Perm, Russia Stamicarbon, The Netherlands |
Urea production unit modernization aimed at capacity increase to 2700 TPD, new prilling tower construction |
- Adaptation of licenser’s basic engineering package to Russian norms and regulations, - Basic design documentation development for prilling tower - Authority package development |
2015-2019 |
|
Minudobreniya, Perm, Russia | Urea production unit modernization aimed at capacity increase to 2700 TPD, new prilling tower construction | - Detail design development |
2015 - 2019 |
|
Togliattiazot, Togliatti, Samara, Russia |
Urea production unit and new prilling tower construction (capacity 2200 TPD) at TogliattyAzot site |
Adaptation of licenser’s basic engineering package to Russian norms and regulations |
2015- 2016 |
|
Authority package development (including prilling tower and handling system). |
2019 |
|||
Detailed design development |
2020 |
|||
Field supervision |
Under development |
|||
PhosAgro- Cherepovets, Cherepovets, Russia |
Urea granulation unit, capacity 1500 TPD |
- Authority package development - Detailed design development |
2014-2017 |
|
Technical modernization of urea production unit № 2 aimed at capacity increase to 1650 TPD |
- Authority package development - Detailed design development |
2014-2016 |
||
EuroChem, NAK Azot, Novomoskovsk, Russia |
Technical modernization of urea production unit № 2 aimed at capacity increase to 1500 TPD |
- Authority package development - Detailed design development |
2013-2017 |
|
Technical modernization of urea plant № 3 (second line) with capacity increase to 1450 TPD |
- Authority package development - Detailed design development |
2013-2016 |
||
UAN production unit on the basis of urea production plant № 2 (capacity 1200 TPD) |
- Authority package development - Detailed design development |
2013-2014 |
||
Revamp of urea unit №2 (gas vent elimination) |
- Authority package development - Detailed design development |
2012-2015 |
||
32,5% urea solution production unit (capacity 100000 TPY) including urea solution treatment unit on the basis of urea plant № 2 evaporation unit |
- Authority package development - Detailed design development |
2011-2015 |
||
Chemoproject, Czech Republic |
AZOMURES S.A. plant' s prilling tower modernization aimed to capacity increase from 900 to 1425 TPD, keeping the tower´s height and ensuring the same quality level. |
- Acting as general design contractor - Development of technical solutions |
2012 |
|
Acron, Veliky Novgorod, Russia |
Urea production units (№1-4) revamping aimed to capacity increase up to 2000 TPD and feedstock / energy saving |
- Authority package development - Detailed design development |
2009- |
|
Urea synthesis unit revamp (№5) |
- Authority package development - Detailed design development |
2013-2014 |
||
Azot, Kemerovo, Russia |
Urea production unit revamp with high speed drum granulator installation |
- Authority package Development - Detailed design development |
2011-2013 |
|
Kuibyshev Azot, Togliatti, Russia |
Acid ammonia recovery unit downstream urea unit absorption tower |
- Authority package Development - Detailed design development |
2011-2012 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Technical modernization of evaporation unit № 5 for urea production unit №2 (capacity 1000 TPD) |
- Authority package Development - Detailed design development |
2011-2012 |
|
Acron, Veliky Novgorod, Russia |
Implementation of computer process simulator for personal training and knowledge assessment |
- Computer-generated technological simulator for urea production assembly №5 |
2011-2012 |
|
Evaporation system for urea production unit and prilling tower modernization with capacity increase |
- Detailed design development |
2011-2013 |
||
Maxam-Chirchik, Chirchik, Uzbekistan |
Modernization and technical upgrading of urea unit |
- Authority package Development - Detailed design development |
2010-2012 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Modernization of unit №2 (urea plant №2) |
- Authority package Development - Detailed design development |
2010-2011 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Implementation of computer process simulator for personnel training and knowledge assessment |
- Hard- and software complex |
2010 – 2011 |
|
PhosAgro, Cherepovets, Russia |
Urea plant production unit with capacity 1500 TPD, procured by “Chemoproject” (Czech Republic) |
- Authority package Development - Detailed design development |
2010- 2012 |
|
Design Institute «Salavatgasonephte-himproect», Salavat, Republic of Bashkortostan, Russia |
Prilling tower for urea plant №24 |
- Adaptation of licenser’s basic engineering package (“TEC”, Japan) to Russian norms and regulations - Authority package development - Detailed design development |
2010- 2011 |
|
PhosAgro, Cherepovets, Russia |
Implementation of computer process simulator for personnel training and knowledge assessment |
- Hard- and software complex |
2010- 2011 |
|
Revamp of urea synthesis evaporation unit |
- Authority package development - Detailed design development |
2010 |
||
Kuibyshev Azot, Togliatti, Russia |
Prilling tower revamp (urea plant №4) |
- Detailed design development |
2010 |
|
Revamp of evaporation unit (urea plant №1, unit № 4) |
- Detailed design development |
2010 |
||
Salavatnefteorgsintez Salavat, Russia |
Prilling towers revamp (urea plant №24) |
- Authority package development - Detailed design development |
2009-2010 |
|
Yokogawa Electric, Moscow |
Development of control system for CO2 compressor with arrangement of a room for a set of technical devices at NAK “Azot" |
- Detailed design development |
2009 |
|
Acron, Veliky Novgorod, Russia |
Design of granulated urea unit based on Rotoform technology |
- Detailed design development |
2009 |
|
PhosAgro AG - Cherepovetsky Azot, Cherepovets, Russia |
Urea production unit with capacity 1500 TPD, procured by “Chemoproject” (Czech Republic) |
- Authority package development - Detailed design development |
2008 – 2012 |
|
Togliattiazot, Togliatti, Samara, Russia |
Prilling tower modernization (urea plant) |
- Detailed design development |
2008-2009 |
|
Acron, Veliky Novgorod, Russia |
Urea unit revamp with capacity increase and energy saving |
- Authority package development - Detailed design development |
2008 |
|
UralChem, Voskresensk Mineral Fertilizers, Voskresensk, Russia |
Urea production unit with capacity 600 (1200) TPD |
- Authority package development |
2008 |
|
Acron, Veliky Novgorod, Russia |
Urea unit №5 on the basis of relocated unit |
- Authority package development - Detailed design development |
2007 – 2011 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Prilling tower revamp (urea unit, plant 2A) |
- Authority package development - Design documentation development |
2007-2009 |
|
Grodno Azot, Grodno, Belarus |
Revamp of urea plant №4 with capacity increase |
- Feasibility study, - Architectural and civil design |
2007 – 2012 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Urea production unit on the basis of relocatable unit with capacity increase and energy saving |
- Authority package development - Detailed design development |
2007– 2010 |
|
Revamp of urea plant №3 with capacity increase to 2000 TPD |
- Authority package development - Detailed design development |
2007 – 2010 |
||
Severodonetsk Azot Association, Severodonetsk, Ukraine |
Development of basic design for urea unit revamp with capacity increase from 1200 up to 1500 TPD |
- Authority package development - Detailed design development |
2007 – 2010 |
|
EuroChem, NevAzot , Nevinnomyssk, Russia |
Urea evaporation unit for melamine plant |
- Authority package development - Detailed design development |
2008 – 2010 |
|
TogliattiAzot, Togliatti, Russia |
Technical upgrading of urea unit with integration of melamine unit |
- Authority package development |
2007 – 2008 |
|
KuibyshevAzot, Togliatti, Russia |
Revamp of urea unit with capacity increase |
- Authority package development - Detailed design development |
2007 – 2008 |
|
Salavatnefteorgsintez Salavat, Russia |
Basic design for urea prilling tower |
- Authority package development - Detailed design development |
2007-2008 |
|
Severodonetsk Azot Association, Severodonetsk, Ukraine |
Development of basic design for urea unit revamp with capacity increase from 1000 up to 1200 TPD |
- Authority package development - Detailed design development |
2006-2007 |
|
AB Achema, Lithuania |
Urea production unit based on relocatable equipment |
- Authority package development - Detailed design development - Development of operational manuals |
2006-2008 |
|
PhosAgro, Cherepovets, Russia |
Revamping of distillation unit with capacity increase (urea production plant) |
- Authority package development - Detailed design development |
2007 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Implementation of computer process simulator for personnel training and knowledge assessment |
- Hard- and software complex |
2006-2008 |
|
Ostchem Group, Azot, Cherkassy, Ukraine |
Revamping of urea unit М-6 |
- Authority package development - Detailed design development |
2006-2010 |
|
Salavatnefteorgsintez, Salavat, Russia |
Revamping of urea plant №50 |
- Authority package development - Detailed design development |
2006 – 2008 |
|
Fertalge Industries SPA, Algeria |
Prilling tower for urea production |
- Authority package development - Detailed design development |
2006-2008 |
|
Dorogobuzh, Verkhnedneprovsky, Smolensk region, Russia |
Urea production unit based on relocatable equipment, urea storage unit, prilling tower |
- Authority package development |
2006 - 2007 |
|
Grodno Azot, Grodno, Belarus |
Revamp of urea production unit, installation of recuperator |
- Detailed design development |
2006 |
|
Acron, Veliky Novgorod, Russia |
Installation of the 5th urea synthesis reactor |
- Detailed design development |
2006 |
|
NevAzot, Nevinnomyssk, Russia |
Revamp of urea production unit №2 |
- Authority package development - Detailed design development |
2006 |
|
Melamine production |
||||
EuroChem, NevAzot, Nevinnomyssk, Russia |
Melamine unit by LURGI AG technology, Germany |
- Authority package based on foreign licensor’s basic engineering package - Detailed design of architectural and civil part |
2007 – 2011 |
|
TogliattiAzot, Togliatti, Russia |
Technical upgrading of urea unit with integration of melamine unit |
- Authority package development |
2007 – 2008 |
|
Acron, Veliky Novgorod, Russia |
Melamine production unit |
- Feasibility study - Environmental impact investigation |
2006 – 2007 |
|
Hydrogen production |
||||
Shchekinoazot, Shchekino, Russia |
Hydrogen recovery unit |
- Acting as general design contractor - Authority package development based on foreign licensor’s basic engineering package - Detailed design development |
2010-2011 |
|
Ammonium nitrate production |
||||
NIUIF, Cherepovets, Russia | High speed drum granulation unit for urea and ammonium nitrate based fertilizers production | - Technical solutions development |
2018-2019 |
|
TomskAzot,
|
Modernization of the existing Drum Granulation unit to shift it to the production of the granulated ammonium nitrate. |
- Design documentation development |
2017 |
|
KazAzot, Aktau, Kazakhstan |
Ammonia nitrate production unit modernization: HSDG for ammonia nitrate manufacturing |
- Technical solution development - Detail design development |
2011-2012 |
|
Other production |
||||
Not specified under the terms of confidentiality | AGCC | - Authority package development | 2021 to present | |
Not specified under the terms of confidentiality | AGCC | - Detailed design development | 2021 to present | |
Not specified under the terms of confidentiality | AGCC |
- Authority package development - Detailed design in part of plot plan & external water supply and water disposal system |
2020 to present | |
Not specified under the terms of confidentiality | AGCC | - Authority package development | 2020 - 2021 | |
Not specified under the terms of confidentiality | AGCC | - Authority package development | 2020 - 2021 | |
Not specified under the terms of confidentiality | AGCC | - Authority package development | 2020 - 2021 | |
Not specified under the terms of confidentiality | Reconstruction of the gas supply network | - Authority package development | 2021 | |
Not disclosed (Confidential Information) | Gas treatment plant (OSBL facilities, household building with canteen) | - Authority package development | 2020 to present | |
Gas treatment plant (OSBL facilities, fire station & gas rescue service) | - Authority package development | 2020 to present | ||
Gas treatment plant (intershop racks) | - Authority package development | 2020 to present | ||
Not disclosed (Confidential Information) | Installation of the hydro foamy filtration system (wet scrubbing) |
- Detail design development - Field supervision - Technical assistance during commissioning |
2020 | |
UralChem, Berezniki, Russia | Technical modernization of nitrate- nitrite salt production unit (building 449) |
- Technical solution development - Basic Engineering Design |
2018-2019 |
|
Volzhskiy Orgsintez- Volzhsky, Volgograd region, Russia |
Sodium dimetilditiocarbamate production unit, capacity 15000 tons per year | - Adaptation of licenser’s (EPC) detailed design |
2018 - 2019 |
|
Sodium dimetilditiocarbamate production unit, capacity 15000 tons per year |
- Authority package development - Detailed design development |
2017-2018 |
||
FCE plant named after Sverdlov Dzerzhinsk, Nizhny Novgorod region, Russia | Modernization aimed at construction of a small-scale hexogen production unit (using technology № 2.1.6.100) | - Construction design supervision |
2018 |
|
Technical modernization providing production process mechanization and automation | - Construction design supervision | 2018-2019 | ||
Salavat Neftekhimremstroy, Salavat, Russia | Development of detailed design for additional heating equipment U-EA 602, U-EA 603, U-EA 604 based on technical documentation M/DK-14-169.00.00.BO. Development of design and estimate documentation for steam tracing change. |
- Detailed design development - Estimate documentation - Field supervision |
2018 |
|
Korund-Cyan, Dzerzhinsk, Russia |
Sodium cyanide production unit modernization& construction (second stage: additional engineering system monitoring) | - Detail design development | 2018-2019 | |
Sodium cyanide production unit modernization. Additional equipment installation (buildings B60, B40) | - Adaptation of licenser’s (EPC) detailed design | 2018-2019 | ||
Modernization and construction of railway tracks |
- Authority package development - Detailed design development |
2018 - 2019 | ||
Modernization of administrative and service building A 13 | - Authority
package development - Detailed design development | 2017 | ||
Testing the feasibility of repairing furnace lining (building B70) | - Detailed design development | 2017 | ||
Technical modernization of the cooling water unit (Sodium cyanide production unit, building В50) |
- Authority package development - Detailed design development |
2016-2017 |
||
Sodium cyanide production unit modernization& construction | - Detailed design development |
2016 |
||
Alcali storage unit modernization (sodium cyanide production unit, building B80) |
- Authority package development - Detailed design development |
2016 |
||
Sodium cyanide storage unit technical modernization |
- Detailed design development |
2015 |
||
Sodium cyanide production unit with capacity of 80000 TPD (first and second line) |
- Acting as general design contractor - Authority package development based on foreign licensor’s basic engineering package (EPC, Germany) - Detailed design development |
2010-2012 |
||
SNF Flopam
Qatar |
Acrylamide and polyacrylamide production unit with capacity of 60 000 TPY | - Authority package development | 2017 | |
QAFCO (Qatar Fertilizer Company), Qatar |
Multipurpose High Speed Drum Granulation (HSDG) Pilot Plant for production of granulated urea with additives, capacity 100 kg per hour |
- Technology licensing - Engineering |
2014-2015 |
|
PVFCCо, Phu My I, Ba Ria Vung Tau, Vietnam |
High Speed Drum Granulation unit for production of compound fertilizers (capacity 100 kg/h) |
- Technology licensing - Engineering |
2014-2015 |
|
Kuibyshev Azot, Togliatti, Russia |
Implementation of catalytic purification system, compressor plant, outdoor installations and production buildings (energy efficient cyclohexanol production unit installation project, capacity 140000 TPY) |
- Authority package development - Detailed design development |
2012-2014 |
|
Nizhfarm, Nizhny Novgorod, Russia |
Grass-root gel production plant |
- Adaptation of licenser’s basic engineering package (“Chemofarm engineering”, Belgrad, Serbia) to Russian norms and regulations |
2011 |
|
Zawolzhsky Motorny Zawod, Zavolshye, Russia |
Technical upgrading of pipelines for acids solution discharge in heat-treating workshop |
- Detailed design development |
2011 |
|
TIKO-Plastic, Dzerzhinsk, Russia |
Expanding capacity of plastic film production plant. Production building construction |
- Acting as general design contractor - Authority package development - Detail design development (architectural and civil documentation) |
2010-2011 |
|
Nexis, Perm, Russia |
CAN (capacity 10 000 TPY) and magnesium nitrate production units (solid or liquid form) |
- Development of initial data for design works - Development of design documentation for nonstandardized equipment |
2010 |
|
AutoVAZ, Togliatti, Russia |
Technical upgrading of liquid ammonia evaporation unit |
- Authority package development - Detailed design development - Adaptation of technical rules to current regulations |
2010 |
|
Zawolzhsky Motorny Zawod, Zavolshye, Russia |
Construction of testing station for diesel engines |
- Turnkey project |
2009 |
|
Korund, Dzerzhinsk, Russia |
Lacquer, paint and polyester resins production unit |
- Acting as general design contractor - Detailed design development (infrastructure) |
2005-2007 |
|
Storage units |
||||
Metafrax, Gubaha, Russia |
Revamp of urea storage unit unloading section |
- Authority package development - Detailed design development |
2013 |
|
Korund, Dzerzhinsk, Russia |
Revamp of chlorine storage unit, adaptation to industry safety requirements |
- Detailed design development |
2009 |
|
Ammoni, Mendeleevsk, Russia |
Construction of urea storage complex |
- Basic design |
2008 – 2009 |
|
Pervouralsky novotrubny works, Perovuralsk, Russia |
Revamp of liquid ammonia storage unit № 33 |
- Authority package development - Detailed design development |
2006-2007 |
|
Zawolzhsky Motorny Zawod, Zavolshye, Russia |
Revamp of sulphuric acid storage unit |
- Turnkey project |
2006-2007 |
|
Petrol storage unit |
- Turnkey project |
2006 |
||
Nizhegorodsky machine-building plant, Russia |
Revamping of chlorine storage unit and chlorinator |
- Turnkey project |
2006-2007 |
|
Kuibyshev Azot, Togliatti, Russia |
Revamping of urea storage unit |
- Authority package development - Detailed design development |
2007 |
|
TIKO-Plastic, Dzerzhinsk, Russia |
Feedstock and final product storage facilities |
- Authority package development - Detailed design development |
2006 |
|
Pre-design services |
||||
Not disclosed (Confidential information) | Urea production | - Investment feasibility study | Under development | |
Apatite, Cherepovets, Russia | Ammonia production | - Consulting services on effective facility arrangement, estimation of the project cost | 2019-2020 | |
Not disclosed (Сonfidential information) | Ammonia- methanol- urea\other nitrogen products complex | - Front-end engineering (detailed estimation of overall scope, reviewing options for site location) | 2019-2020 | |
Not disclosed (Сonfidential information) | Ammonia- methanol- urea complex | - Front- end engineering (developing options for different construction sites) | 2019 | |
Not disclosed (Сonfidential information) | Methanol production complex in extreme conditions of the Far North | - Investment feasibility study - Declaration of intention development |
2019 | |
Not disclosed (Сonfidential information) | Ammonia- urea production complex | - Feasibility study - Environmental impact assessment |
2018 | |
«Meleuz mineral fertilizers», Meleuz, Russia | Methanol production complex | - Investment feasibility study - Declaration of intention development | 2019 | |
«Meleuz mineral fertilizers», Meleuz, Russia | Repair of UKL-7-76 №2 for ammonium nitrate production and shipment. Capacity 450 000 TPY | Investment feasibility study | Under development | |
Askom | Methanol production with capacity 2 500 TPD | - Investment feasibility study | 2018 | |
Kazphosphate, Kazakhstan | Ammonia production with capacity 1 000 000 TPY | - Investment feasibility study | Under development | |
KazAzot, Aktau, Kazakhstan | Ammonia\urea and (or) natural gas deep processing products production complex | - Investment feasibility study | 2017 | |
Novgorodsky GIAP, Veliky Novgorod, Russia | Ammonia and urea production complex (Dorogobuzh site) | - Feasibility study | 2017 | |
Yakut gas processing complex, Saha, Yakutsk, Russia | Preliminary planning and engineering at feasibility study stage (Methanol production unit with capacity 10000 TPD) | - Preconstruction surveys | 2017 | |
Development of environmental impact assessment reports | - Environmental impact assessment Assisting with ecological expertize approval | 2017 | ||
Not disclosed (Confidential Information) | Methanol production | - Feasibility study | 2017 | |
Amec Foster Wheeler,
|
Methanol production unit with capacity 10000 TPD for Yakut Fuel and Energy Company |
- Investment feasibility study |
Under development |
|
Not disclosed (Confidential Information) |
Methanol production unit |
- Investment feasibility study |
2017 |
|
Baltic Gas Chemical Company, Saint-Petersburg, Russia |
M-15 production unit with capacity 15000 TPY for Chayandinskoye field. |
- Development of declaration of intention |
2017 |
|
CREON-ENERGY, Moscow, Russia |
Methanol production unit with capacity 1mln TPY (Novoroscement site) |
- Methanol production unit tie- up for site infrastructure |
2017 |
|
Jugterminalproect, Moscow, Russia |
Methanol- Ammonia- Urea complex (Taman region) |
- Front-end engineering design |
2017 |
|
Azot, Kemerovo, Russia |
UAN production unit with capacity 150000 TPD |
- Investment feasibility study |
2017 |
|
Teсhnoleasing, Moscow, Russia |
Methanol production unit (Skovorodino, Amur region) |
- Investment feasibility study |
2017 |
|
Novgorodsky GIAP, Veliky Novgorod, Russia |
- Sulfuric acid production unit - Wet-process phosphoric acid production unit - Monoammonium phosphate (MAP) and\or diammonium phosphate (DAP) production unit |
- Investment feasibility study |
2016 |
|
Metafrax, Gubakha, Russia |
Ammonia-urea-melamine complex |
- Reviewing options for site location - Development of declaration of intention - Environmental impact assessment - Conducting public hearings |
2015 -2016 |
|
OJSC MMC Norilsk Nickel, Moscow, Russia |
Urea production complex (Dudinka site) |
- Investment feasibility study |
2016 |
|
LLC Zhilevskaya kremniorganika, Sitne-shchelkanovo, Moscow region, Russia |
Ammonia-urea complex |
- Investment feasibility study |
2016 |
|
ShchekinoAzot, Shchekino, Russia |
Methanol production unit with capacity 500000 TPY |
- Reviewing options for methanol unit location at ShchekinoAzot site |
2016 |
|
Ammonia-urea complex |
- Development of declaration of intention |
2016 |
||
Sulphuric acid production unit construction |
- Site location estimation |
2015 |
||
Grodno Azot, Grodno, Belarus |
Nitrogen complex (ammonia-urea-hydrogen) |
- Investment feasibility study |
2015 |
|
KuibyshevAzot, Togliatti, Russia |
Urea production unit |
- Investment feasibility study |
2014 |
|
Sibmetahim, Tomsk, Russia |
Chemicals manufacturing unit (synthetic fluid \ ammonia-urea melamine complex) |
- Expert economic assessment |
2014 |
|
CREON-ENERGY, Moscow, Russia |
Methanol production with capacity 5000 TPD (Ust-Luga region) |
- Investment feasibility study |
2014 |
|
Rosstroy,
|
Ammonia-urea complex |
- Investment feasibility study |
2014 |
|
PhosAgro, Cherepovets, Russia |
Granulated urea production unit with capacity 1500 TPD |
- Pre-feasibility study |
2014 |
|
Ammonia production unit AM-3 (capacity 2200 TPD) |
- Pre-feasibility study |
2013- 2014 |
||
National Chemical Company, Russia |
Gaz -chemical complex (Kozmino, Primorsky territory) |
- Declaration of intention development - Environmental Impact assessment - Conducting public hearings |
2013 |
|
ICM, Saint-Petersburg, Russia |
Ammonia –urea complex (Kingisepp region, Leningrad region) |
- Declaration of intention development - Environmental impact assessment |
2012-2013 |
|
Minudobreniya, Rossosh, Russia |
Ammonia-urea complex |
- Investment feasibility study |
2012 |
|
ShchekinoAzot, Shchekino, Russia |
Ammonia-urea complex |
- Investment feasibility study |
2010- 2011 |
|
Hydrogen production unit |
- Investment feasibility study |
2011 |
||
Balakovo Mineral Fertilisers (PhosAgro), Balakovo, Russia |
Above-ground ammonia storage unit |
- Investment feasibility study |
2010 |
|
Technical assessment & inspection services |
||||
EuroChem, NevAzot, Nevinnomyssk, Russia | Urea production unit 2A inspection to improve synthesis unit efficiency when operating urea unit and melamine production facility jointly | - Technical inspection | 2019 | |
Maxam-Chirchik, Chirchik, Uzbekistan | Urea production unit inspection to develop options to reduce emissions and minimize the amount of effluents | - Technical inspection |
2019 | |
EuroChem, NAK Azot, Novomoskovsk, Russia | Technical inspection of evaporation unit (urea plant № 2) | - Technical inspection - Issuing recommendations |
2019 | |
Maxam-Chirchik, Chirchik, Uzbekistan | Technical inspection of nitric acid production units АК-72М\АК-72 | - Technical inspection | 2019 | |
PMU, UralChem, Perm, Russia | Certification of measurement procedures | - Evaluation and
confirmation of
compliance of
measurement
procedures with the
established requirements - Modifying measurement procedures to bring them in line with the requirements |
2018 | |
Grodno Azot, Grodno, Belarus | Complex inspection of Urea 3 plant | - Technical inspection | 2018 | |
TechnoChimReagentBel, Grodno, Belarus | Certification of measurement procedures | - Evaluation and confirmation of compliance of measurement procedures with the established requirements - Modifying measurement procedures to bring them in line with the requirements | 2018 | |
Certification of measurement procedures | - Evaluation and confirmation of compliance of measurement procedures with the established requirements - Modifying measurement procedures to bring them in line with the requirements | 2017 | ||
Union of producers and consumers of automobile chemical goods, Moscow, Russia | Certification of measurement procedures | - Evaluation and confirmation of compliance of measurement procedures with the established requirements - Modifying measurement procedures to bring them in line with the established requirements | 2017 | |
PhosAgro, Cherepovets, Russia | Revision of existing operating procedures (urea production units № 1 and №2) | Making amendments to the operating procedures | 2017 | |
Salavatnefteorgsintez Salavat, Russia | Field supervision and technical support during construction and commissioning (modernization of urea production unit №24 granulation section, capacity 1400 TPD) | - Field supervision - Technical support during construction - Commissioning | 2017 | |
Gasprombank, |
Technical inspection of SDS- Azot urea production facilities |
- Equipment & urea production process condition assessment, development of engineering solutions optimizing technological processes, reducing energy consumption and enhancing reliability of unit operation. |
2017 |
|
Grodno Azot, Grodno, Belarus |
Development of technical solutions for distillation gases treatment unit (urea plant №2) |
- Investment feasibility study |
2017 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Technological inspection of the prilling tower (complex fertilizers production plant, ammonium nitrate unit ) |
- Technical inspection - Issuing recommendations and developing engineering solutions optimizing prilling tower technological mode. |
2016 |
|
Azot, Kemerovo, Russia |
Complex technical inspection of urea production plant (Tecnimont technology) |
- Technical inspection - Development of engineering solutions optimizing technological processes, reducing energy consumption and enhancing reliability of unit operation - Investment evaluation |
2015 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Technical inspection (urea plant № 2, urea units 1-3) |
- Technical inspection - Development of engineering solutions reducing energy consumption and increasing capacity - Feasibility study |
2015 |
|
Research Institute for Mineral Fertilizers (NIUIF), Moscow, Russia |
Development of a reference guide on most appropriate technologies used to produce ammonia, mineral fertilizers and mineral acids (sections developed by NIIK: ammonia, NA, AN, CAN, urea, UAN). Scientific and technical support to get the approval of expertise. |
2015 |
||
EuroChem, NevAzot , Nevinnomyssk, Russia |
Complex technical inspection (melamine\urea units №2a) |
- Technical inspection - Development of engineering solutions optimizing technological process during operation with melamine unit |
2014 |
|
FNTC Group spol.s r.o, Czesh Republic |
Technical inspection of urea plant at FerganaAzot |
- Technical inspection |
2013 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Technological inspection (urea plant №3, second line) aimed at capacity increase to 1600 t/d |
- Technical inspection |
2012 |
|
32,5% urea solution production unit (capacity 100000 TPY) including urea solution treatment unit on the basis of urea plant № 2 evaporation unit |
- Urea units technical inspection considering the construction of a new unit |
2011 |
||
Acron, Veliky Novgorod, Russia |
Technical inspection of urea plant aimed at capacity increase and energy saving |
- Technical inspection |
2010-2011 |
|
PhosAgro, Cherepovets, Russia |
Technological monitoring of urea unit performance in order to reduce ammonia consumption |
- Technical inspection |
2009 |
|
Severodonetsk Azot Association, Severodonetsk, Ukraine |
Process monitoring of urea unit operation |
- Technical inspection - Recommendation issuing for capacity increase and energy saving |
2008 |
|
Minudobreniya, Perm, Russia |
Monitoring of urea production unit equipment |
- Technical inspection |
2006 |
|
Diagnostics & repair services | ||||
UralChem, Berezniki, Russia | Replacement of nozzles Р1, Р2, Р3, Р4 Replacement of bottom liner Replacement of three liner belts in the reactor R-901 | Revamps | 2021 | |
Azot, Kemerovo, Russia | Replacement of nozzles Р1, Р2, Р3, Р4 Replacement of bottom liner in the reactor R-901 | Revamps | 2021 | |
EuroChem, NAK Azot, Novomoskovsk, Russia | Repair of three liner belts of cylindrical part of Urea Reactor pos. 11-R-1 | Revamps | 2021 | |
Grodno Azot, Grodno, Belarus | Relining of Urea reactor R-201, Urea-3 | Revamps | 2021 | |
Grodno Azot, Grodno, Belarus | Technical supervision of lining repair (urea synthesis unit pos. R-201, urea plant 4) | - Repair works | Under development | |
EuroChem, NevAzot, Nevinnomyssk, Russia | Technical supervision of repair works (distillation column for heavy fractions pos.D-2203, №12А) | - Repair works | Under development | |
Repair of cylindrical section of the lining of synthesis reactor pos. 6/1 (urea plant 2) | - Repair works | 2020 | ||
Apatite, Volkhov, Russia | Eddy-current testing of heat exchanger tubes (for equipment operating under excessive pressure) | - Eddy-current testing | 2019 | |
EuroChem, NevAzot, Nevinnomyssk, Russia | Corrosion and technical inspection of urea synthesis reactors pos. 6/1, 6/4, distillation columns pos. К-7/1, К-7/2, stripper-distillation units pos. Т8/1, 8/2, mixers pos. 5/1, 5/2, 5/3, 5/4, air heaters pos. 20/3 (urea unit №2А) | Corrosion inspection | 2019 | |
MOPCO, Egypt | Urea production unit MOPCO-2 corrosion inspection | - Corrosion inspection | 2019 | |
Urea production unit MOPCO-3 corrosion inspection | - Corrosion inspection | 2019 | ||
Industrial group Phosphorite, Leningrad region, Кingisepp, Russia | Eddy-current testing of heat recovery boiler and air heaters' heat- exchanger tubes | - Eddy-current testing | 2019 | |
AlexFert, Egypt | Recirculation heater internal surface heat exchanger tubes cleaning by thermo- pneumo-abrasive method | - Repair works | 2019 | |
KuibyshevAzot, Togliatti, Russia | Urea synthesis reactor pos. № 6/1 (№202КВ) repairing | - Repair works | 2019 | |
EuroChem, NAK Azot, Novomoskovsk, Russia | Corrosion and technical inspection of urea production unit 3 main equipment (line 1) | - - Corrosion inspection | 2019 | |
Azot, Kemerovo, Russia | Inspection and replacement of the urea synthesis reactor pos. R-901 lining (dome, cylindrical sections) | - Repair works | 2019 | |
Grodno Azot, Grodno, Belarus | Lining repair of synthesis reactor pos. R-201 urea plant №3 | - Repair works | 2019 | |
«Meleuz mineral fertilizers», Meleuz, Russia | Repair of heat exchanger tubes of evaporation unit pos. T-10 (ammonium nitrate production unit) | - Repair works | 2019 | |
EuroChem, NevAzot, Nevinnomyssk, Russia | Synthesis reactor relining (pos. 6/3, urea plant № 2) | - Repair works | 2019 | |
Apatite, Cherepovets, Russia | Eddy-current testing of pressure vessels' heat exchanger tubes | - Eddy-current testing | 2019 | |
Nitrogénművek Zrt., Hungary | Urea reactor R202 relining | - Relining&repair | 2018 | |
Metafrax, Gubakha, Russia Casale SA, Switzerland | Ammonia-urea-melamine complex | - Technical assistance during commissioning and guarantee testing of the prilling tower - Field supervision | 2018 to present | |
PG Phosphorite, Leningrad region, Kingisepp, Russia | Eddy-current testing of heat recovery boiler tubes | - Eddy-current testing - Issuing recommendations for repairs |
2018 | |
TogliattiAzot, Togliatti, Russia | Equipment corrosion and technical inspection (urea plant № 08К) | - Corrosion inspection - Developing recommendations for repairs |
2018 | |
UralChem, Berezniki, Russia | Corrosion inspection | - Corrosion inspection - Developing recommendations for repairs |
2018 | |
Minudobreniya, Rossosh, Russia | Eddy current testing | - - Eddy current testing - Developing recommendations for repairs |
2018 | |
EuroChem, NevAzot, Nevinnomyssk, Russia | Corrosion and technical inspection of plant №2 | - Corrosion inspection - Developing recommendations for repairs |
2018 | |
KuibyshevAzot, Togliatti, Russia | Relining of distillation column pos. K-7/2 of plant №4 | - Repairs | 2018 | |
Grodno Azot, Grodno, Belarus | Lining repair of synthesis reactor pos. R-201 urea plant №4 | - Repairs | 2018 | |
TogliattiAzot, Togliatti, Russia | Technical repairs manual | - Developing recommendations for repairs | 2018 | |
Apatite, Cherepovets, Russia | Replacement of mass-transfer trays in urea synthesis reactor pos. R-201 in urea plant №2 | - Repair works |
2018 |
|
Eddy-current testing of pressure vessels' heat exchanger tubes |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2018 |
||
Belenergomash, Belgorod, Russia | Steel tubes samples intergranular corrosion testing | - Testing | 2018 | |
Apatite, Cherepovets, Russia | Eddy-current testing of heat-exchanger tubes working under pressure. | - Nondestructive testing - Issuing recommendations for equipment operating and repairing | 2018 | |
EuroChem, NAK Azot, Novomoskovsk, Russia | Corrosion and technical inspection of heat exchanger tubes of high pressure stripper pos. E-201 using eddy current method. | - Corrosion and technical inspection
- Issuing recommendations for equipment operating and repairing | 2017 | |
EuroChem, NevAzot, Nevinnomyssk, Russia | Cleaning heat exchangers pos. E-302 and E- 302B (urea production plant № 2А) | - Nondestructive testing - Equipment cleaning by thermo-pneumo- abrasive method | 2017 | |
Nitrogénművek Zrt., Pétfürdő Hungary | Corrosion and technical inspection of stripper pos. E-201 (urea production) | - Nondestructive testing | 2017 | |
Cleaning heat exchanger tubes of stripper pos. E-201 (urea production) | - Electro-hydro- mechanical cleaning of heat exchanger tubes | 2017 | ||
Nitrogénművek Zrt., Pétfürdő Hungary |
Corrosion and technical inspection of stripper pos. E-201 (urea production) |
- Nondestructive testing – - Electro-hydro- mechanical cleaning of heat exchanger tubes |
2017 |
|
«Meleuz mineral fertilizers», Meleuz, Russia |
Replacement of old tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit) |
- Nondestructive testing - Development of repair method&technique - Repair works |
2017 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Technical and
corrosion inspection of urea
synthesis reactors pos.6/1 and 6/3
(urea plant №2) |
-
Nondestructive testing - Recommendations issue for equipment operating and repairing |
2017 |
|
Minudobreniya, Rossosh, Russia |
Technical inspection of heat- exchanging tubes (plant АM-2) |
- Nondestructive testing - Recommendations issue for equipment repairing |
2017 |
|
Grodno Azot, Grodno, Belarus |
Repair of the lining of the synthesis reactor manhole (pos. R-201, urea plant №3) |
- Technical documentation development - Quality control of the works performed |
2017 |
|
Technical and corrosion inspection of urea synthesis reactor pos. R-201 and HP condenser pos. E-202 (urea plant № 3) |
- Inspection - Issuing recommendations for repairing |
2017 |
||
Technical and corrosion inspection of urea synthesis reactor pos. R-201, HP stripper pos. E-201 and HP condenser pos. E-202 (urea plant № 4) |
- Inspection - Issuing recommendations for repairing |
2017 |
||
TogliattiAzot, Togliatti, Russia |
Inspection and development of recommendation for 14-R-1 synthesis reactor relining (urea production unit 08К) |
- Nondestructive testing - Issuing recommendations for repairing |
2017 |
|
Kuibyshev Azot, Togliatti, Russia |
Corrosion and technical inspection of the main technological equipment of urea production unit |
- Nondestructive testing - Issuing recommendations for repairing |
2017 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Corrosion inspection and technical supervision of repair works on distillation column for heavy fractions (pos.D-2203, №12А) |
- Nondestructive testing - Recommendations’ issue for repairing - Quality control of the works performed |
2017 |
|
PhosAgro Cherepovets, Russia |
Eddy-current testing of pressure vessels' heat exchanger tubes |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2017 |
|
ZNIGO, Borisoglebsk, Voronezh region, Russia |
Inspection of heat exchanger tubes of reflux condenser (urea production unit) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2017 |
|
Sorovskneft, Tyumen, Russia |
Inspection of heat exchanger tubes of S&T oil heaters |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2016 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Inspection of heat exchanger tubes (urea plant 2A) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2016 |
|
Synthesis reactor dome relining (pos.6/1, plant №2) |
- Development of repair method & technique - Repair works |
2016 |
||
Grodno Azot, Grodno, Belarus |
Synthesis reactor relining on 2400 mm height (pos. R-201, Urea-3) |
- Development of repair method &technique - Repair works |
2016 |
|
Technical and corrosion inspection of HP reactor pos. R-201, HP stripper pos. E-201(Urea-3) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2016 |
||
Egyptian Fertilizers Company (EFC), El Ain Sukhna, Egypt |
Relining of urea reactor 322-R-00 (Urea Plant EFC-1 Suez Fertilizers Co.) |
- Inspection - Development of repair method & technique - Repair works |
2016 |
|
UralChem, Azot, Berezniki, Russia |
Relining of urea synthesis reactor pos. R-901 |
- Development of repair method & technique - Repair works |
2016 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Corrosion and technical inspection of urea synthesis reactor pos. 6/1 (urea plant №2) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2016 |
|
Eddy-current testing of pressure vessels' heat exchanger tubes |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2016 |
||
PhosAgro Cherepovets, Russia |
Eddy-current testing of heat- exchanger tubes of carbamate condenser pos. Е-202 |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2016 |
|
«Meleuz mineral fertilizers», Meleuz, Russia |
Replacement of old tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit) |
- Nondestructive testing - Development of repair method &technique - Repair works |
2015 |
|
Grodno Azot, Grodno, Belarus |
Corrosion and technical inspection of synthesis reactor pos.R-201, high-pressure scrubber pos. Е-203, high-pressure stripper pos. Е-201, high-pressure condenser pos.Е-202 (urea unit 3 and urea unit 4) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2015 |
|
Nitrogénművek Zrt., Pétfürdő Hungary |
Corrosion and technical inspection of stripper pos. E-201 (urea production) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2015 |
|
Azot, Cherkassy, Ukraine |
Development of technical documentation to replace three lining belts of cylindrical section of urea synthesis reactor. |
- Technical documentation development - Field supervision during manufacturing of equipment parts |
2015 |
|
Minudobreniya, Rossosh, Russia |
Inspection of heat exchanging tubes of nitrous gases coolers (nitric acid production unit AK-72, the second stage) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2015 |
|
TogliattiAzot, Togliatti, Russia |
Corrosion and technical inspection of the main technological equipment, pipelines and valves for urea plant №1,2 |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2015 |
|
PhosAgro Cherepovets, Russia |
Eddy-current testing of pressure vessels' heat exchanger tubes |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2015 |
|
DniproAZOT, Dneprodzerzhinsk, Ukraine |
Technical inspection of heat exchanger equipment (urea plant №1, urea plant №2) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2014 |
|
Grodno Azot, Grodno, Belarus |
Corrosion inspection of HP urea synthesis reactor pos. R-201, HP stripper pos. E-201, HP scrubber pos. E-203 (urea plant №3) HP stripper pos. E-201, HP condenser pos. E-202, additional heat exchanger section for preheater pos. E-302 (urea plant №4) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2014 |
|
Repair of two lining belts (urea synthesis reactor pos. R-201, urea plant №3) |
- Technical documentation development - Quality control of the works performed. |
2014 |
||
Azot, Cherkassy, Ukraine |
Corrosion and technical inspection of gas pipelines, HP heat exchangers, tanks and vessels of plant M-6 (synthesis reactor pos. R-201, stripper pos. E-201, condenser pos. E-202, pipelines reg. No 481, 532, 534, 535) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2014 |
|
Inspection of heating chamber exchanging tubes (evaporation unit pos. 5/1 and 5/2, plant M-9) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2014 |
||
DniproAZOT Dneprodzerzhinsk, Ukraine |
Corrosion and technical inspection of lining and internal devices (reactor, stripper, condenser, scrubber) for urea plant № 1 and urea plant № 2. |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2014 |
|
Kuibyshev Azot, Togliatti, Russia |
Corrosion and technical inspection of main equipment for urea plant № 4 |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2014 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Corrosion inspection of heat exchange equipment (urea plant №3 (line 2) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2014 |
|
Severodonetsk Azot Association, Severodonetsk, Ukraine |
Corrosion and technical inspection of synthesis reactors internal surface (urea plant M-3) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
|
Azot, Cherkassy, Ukraine |
Inspection and surveying of reformer and heat exchanger equipment for plant A-5 |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
|
Grodno Azot, Grodno, Belarus |
Corrosion inspection of urea synthesis reactor for urea plant № 4. |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
|
Technical inspection of urea synthesis reactor and HP condenser for urea plant № 3 |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
||
Azot, Kemerovo, Russia |
Synthesis reactor repair support services |
- Technical documentation development - Technical inspection - Quality control of the works performed |
2013 |
|
PhosAgro Cherepovets, Russia |
Eddy-current testing of pressure vessels' heat exchanger tubes |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Corrosion and technical inspection of main technological equipment (urea plant №3 (first line) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
|
Acron, Veliky Novgorod, Russia |
Inspection of heat exchanging tubes of condenser pos. Т-506 (urea unit № 5). |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
|
Corrosion and technical inspection of urea synthesis reactor K-501 (urea unit № 5) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
||
EuroChem, NevAzot, Nevinnomyssk, Russia |
Corrosion inspection using eddy current testing of equipment (plant № 2А, 12А) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
|
AB Achema, Lithuania |
Corrosion inspection of urea synthesis reactor (Ø1600mm) and HP mixer. |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
|
FNTC Group spol.s r.o, Czesh Republic |
Corrosion and technical inspection of urea plant, ammonium nitrate and nitric acid units for FerganaAzot |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
|
Azot, Cherkassy, Ukraine |
Corrosion and technical inspection of equipment (urea plant M-2) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
|
Grodno Azot, Grodno, Belarus |
Inspection of absorber ferromagnetic heat exchanger tubes (ammonia plant № 4) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2013 |
|
Razi Petrochemical Company Iran |
Corrosion inspection of urea plant equipment |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2012-2013 |
|
Acron, Veliky Novgorod, Russia |
Corrosion and technical inspection of distillation column pos. 7/2 (urea plant) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2012 |
|
Salavat Neftekhimremstroy, Salavat, Russia |
Repair of urea synthesis reactor pos. 6-1, 6-2 (Gas and Chemical plant «Gasprom nephtehim Salavat», plant № 50) |
- Corrosion and technical inspection - Repair works - Quality control of the works performed |
2012 |
|
Grodno Azot, Grodno, Belarus |
Heat- exchanger tubes inspection (HP equipment of urea plant №3) |
- Nondestructive testing |
2012 |
|
Azot, Cherkassy, Ukraine |
Ferromagnetic heat- exchanger tubes inspection (pos. 1140-C, ammonia plant A-5) |
- Nondestructive testing |
2012 |
|
Corrosion and technical inspection of equipment (urea plant M-6) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2012 |
||
Azot, Kemerovo, Russia |
Emergency repair of the lining of synthesis reactor pos.R-901 (urea plant). |
- Location of the defect - Reactor body repairing - Quality control of the works performed |
2012 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Corrosion and technical inspection of equipment (urea plant №2) |
- Nondestructive testing - Issuing recommendations for equipment operating and repairing |
2012 |
|
Concern Stirol, Gorlovka, Ukraine |
Complex repair of synthesis reactor pos. R-901 (urea plant, location1) |
- Technical documentation development - Repair works - Technical inspection of the works performed. |
2012-2013 |
|
Concern Stirol, Gorlovka, Ukraine |
Emergency repairing of synthesis reactor pos. R-901 (urea plant, location 1) |
- Location of the defect - Reactor body repairing - Technical inspection of the works performed |
2012-2013 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Corrosion and technical inspection of critical equipment (urea plant № 3, second line) |
- Nondestructive testing |
2012 |
|
Acron, Veliky Novgorod, Russia |
Lining replacement of synthesis reactor pos. 6/4 (urea plant) |
- Technical documentation development - Technical inspection - Quality control of the works performed |
2012-2013 |
|
UralChem, Azot, Berezniki, Russia |
Repair of cylindrical section of the lining of synthesis reactor pos. R-901 (urea plant). |
- Corrosion and technical inspection of lining - Technical documentation development - Technical inspection - Quality control of the works performed. |
2012 |
|
Gazprom Neftekhim Salavat Salavat, Russia |
Lining replacement of the bottom parts of urea synthesis and distillation column (urea plant №50) |
- Technical documentation development |
2012 |
|
Agro-Cherepovets, Cherepovets, Russia |
Corrosion and technical inspection of critical equipment (urea plant). |
- Corrosion and technical inspection of lining using NDT - recommendation issue for equipment operating and repairing |
2012 |
|
Azot, Kemerovo, Russia |
Emergency repairing of the heat exchanger cover pos. E-902 (urea plant) |
- Location of the defect - Repair support services |
2012 |
|
Togliattiazot, Togliatti, Russia |
Repair of the lining of HP stripper of urea plant |
- Location of the defect - Repair support services |
2012 |
|
Gazprom Neftekhim Salavat, Salavat, Russia |
Emergency repairing of synthesis reactor 6/1 (urea plant №50). |
- Location of the defect - Repair support services |
2011 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Corrosion and technical inspection of critical equipment (urea plant № 3, first line) |
- Inspection |
2011 |
|
Odessa Port Plant, Yuzhny, Ukraine |
Corrosion and technical inspection of high pressure equipment (urea plant № 2) |
- Inspection |
2011 |
|
Acron, Veliky Novgorod, Russia |
Corrosion and technical inspection of urea synthesis reactor (urea plant № 5) |
- Inspection |
2011-2012 |
|
UralChem, Azot, Berezniki, Russia |
Repair of the lining of urea unit synthesis reactor |
- Location of the defect - Repair support services |
2011 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Repair of two lining belts in urea reactor (urea plant 2А) |
- Technical documentation development - Repairing works assistance - Quality control of the works performed |
2011 |
|
PhosAgro, Cherepovets, Russia |
Cleaning of heat exchanging equipment of evaporation unit (first stage) |
- Removing scales from evaporating unit (first stage) tubes by thermo-pneumo-abrasive method |
2011 |
|
Acron, Veliky Novgorod, Russia |
Technical guidance for relining of urea synthesis reactor pos. 6/2 of urea plant |
- Technical documentation development - Repairing works assistance - Quality control of the works performed |
2011 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Corrosion and technical inspection of equipment (plants №2, №2А) |
- Inspection |
2011 |
|
DniproAZOT Dneprodzerzhinsk, Ukraine |
Corrosion and technical inspection of equipment (urea plant№1 and urea plant №2) |
- Nondestructive testing - Recommendation issue for equipment operating and repairing |
2011-2012 |
|
Concern Stirol, Gorlovka, Ukraine |
Corrosion and technical inspection of sections №1 and №2 (urea plant) |
- Inspection |
2011 |
|
Odessa Port Plant, Yuzhny, Ukraine |
Corrosion and technical inspection of equipment (urea units №1and № 2) |
- Inspection |
2010 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Corrosion and technical inspection of equipment (urea plant №2) |
- Inspection |
2010 |
|
Technical guidance for partial relining of synthesis reactor 6/3 |
- Technical documentation development - Technical guidance of repair works |
2010 |
||
Acron, Veliky Novgorod, Russia |
Corrosion inspection of urea synthesis reactor 6/2 |
- Inspection |
2010 |
|
Industrial safety expertise |
- Diagnostics of urea synthesis reactor 6/1 and 6/4 |
2010 |
||
Cleaning of heat exchanging equipment of MP distillation |
- Removing scales from heat exchanging tubes by pneumocurrent method |
2010 |
||
Azot, Cherkassy, Ukraine |
Corrosion inspection of equipment (urea plant M-2 and M-6) |
- Inspection |
2010 |
|
Relining of upper part of urea synthesis reactor (plant M-2) |
- Development of technical documentation - Repair works - Quality control of the works performed |
2010 |
||
PhosAgro, Cherepovets, Russia |
Corrosion and technical inspection of urea plant equipment |
- Nondestructive testing |
2010 |
|
DniproAzot, Dneprodzerzhinsk, Ukraine |
Corrosion and technical inspection of equipment (urea plant №1 and urea plant № 2) |
- Inspection |
2010 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Technical guidance of partial relining of synthesis reactor 6/2 |
- Technical documentation development - Repairing works assistance - Quality control of the works performed |
2010 |
|
Azot, Kemerovo, Russia |
Corrosion inspection of urea synthesis reactor |
- Inspection |
2010 |
|
EuroChem, NevAzot , Nevinnomyssk, Russia |
Corrosion and technical inspection (urea units №2 and №2a) |
- Inspection |
2009 |
|
Industrial safety expertise of technical devices (urea plant №2) |
- Corrosion and technical inspection |
2008 |
||
EuroChem, NAK Azot, Novomoskovsk, Russia |
Repair of the lining of synthesis reactor, separator and stripper (urea plant №3) |
- Technical assistance |
2008 |
|
Azot, Kemerovo, Russia |
Repair of urea synthesis reactor |
- Development of technical documentation and technical guidance for urea synthesis reactors repair |
2008 |
|
DniproAzot, Dneprodzerzhinsk, Ukraine |
Industrial safety expertise of technical means |
- Corrosion and technical inspection |
2008 |
|
R&D Institute of Measurement Systems, Nizhny Novgorod, Russia |
Process diagnostic to determine the remaining service life of equipment and pipelines of treatment plants. |
- Inspection |
2007 |
|
Rikor Electronics, Arzamas, Russia |
Industrial safety expertise of technical means |
- Equipment diagnostics |
2007 |
|
PhosAgro, Cherepovets, Russia |
Industrial safety expertise of pressurized vessels (urea plant) |
- Equipment diagnostic and expert conclusion for service life extension of equipment |
2007 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Repair of two lining belts (urea reactor) |
- Development of technical documentation - Supervising manufacturing of the material - Technical assistance - Field supervision |
2007 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Inspection of stripper tubes by eddy-current method |
- Inspection |
2007 |
|
Corrosion inspection of stripper |
- Inspection |
2007 |
||
FerghanaAzot, Uzbekistan |
Corrosion inspection of critical vessels and pipelines (urea plant) |
- Inspection |
2007 |
|
DniproAzot, Dneprodzerzhinsk, Ukraine |
Corrosion and technical inspection of HP reactor, stripper, condenser (plant №2) |
- Inspection - Repair procedure development - Repair works |
2007 |
|
Equipment procurement |
||||
For production complexes |
||||
Metafrax, Gubakha, Russia |
Ammonia-urea-melamine complex |
- Equipment procurement for OSBL facilities |
2016-to present |
|
Metafrax, Gubakha, Russia Casale SA, Switzerland |
Ammonia-urea-melamine complex |
- Equipment procurement for prilling tower construction |
||
Ammoni, Mendeleevsk, Russia |
Ammonia- methanol- urea complex |
- Equipment procurement for OSBL facilities |
2010-2015 |
|
For ammonia production units |
||||
PhosAgro, Cherepovets, Russia |
Ammonia production unit AM-3 (capacity 2200 TPD) |
- Equipment procurement for analytical laboratory |
2016-2017 |
For urea production units |
Not disclosed (Confidential Information) | UAN production unit | - Package procurement | Under development | |
Not disclosed (Confidential Information) | UAN production unit | - Equipment procurement (vortex mixer) | Under development | |
Not disclosed (Confidential Information) | Urea production unit | Critical equipment procurement for urea unit modernization project | Under development | |
Acron, Veliky Novgorod, Russia | Urea production unit №6 construction with capacity 600 TPD | - Equipment procurement | Under development | |
Rashtriya Chemicals and Fertilizers Ltd., Mumbai, India | Urea units modernization (Thal) | - Procurement & installation of three sets of Internal Devices | Under development | |
Gujarat Narmada Valley Fertilizers & Chemicals Ltd, India | Urea unit modernization | - Procurement & installation of vortex mixer into urea synthesis reactor | 2017 | |
Rashtriya Chemicals and Fertilizers Ltd., Mumbai, India |
Urea units modernization (Thal) |
- Procurement & installation of three Sets of Internal Devices |
Under development |
|
KuibyshevAzot, Togliatti, Russia |
Technical modernization of urea unit № 4 (evaporation, hydrolysis and desorption sections) |
- Equipment procurement |
2016-2017 |
|
Rashtriya Chemicals and Fertilizers Ltd., Mumbai, India |
Trombay V urea plant modernization |
- Procurement & installation of a Set of Internal Devices comprising Vortex Mixer and Conversion Booster for urea synthesis reactor |
2015 -2016 |
|
Casale SA, Switzerland |
Urea production unit and new prilling tower construction (capacity 2200 TPD) at TogliattyAzot site |
- Equipment procurement for prilling tower and new urea reactor support facilities. |
2015-to present |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Revamp of urea unit 2 (gas vent elimination) |
- Equipment procurement |
2012-2015 |
|
PhosAgro- Cherepovets, Cherepovets, Russia |
Urea production plant (section № 2) technical modernization with capacity increase to 1600 TPD |
- Supervising equipment manufacturing |
2014-2016 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Technical modernization of the urea production plant №2 |
- Equipment procurement |
2013-2016 |
|
32,5% urea solution production unit (capacity 100000 TPY) including urea solution treatment unit on the basis of urea plant № 2 evaporation unit |
- Equipment procurement |
2013-2015 |
||
Nagarjuna Fertilizers and Chemicals Limited, India |
Urea synthesis unit № 2 modernization |
- Procurement & installation of vortex mixer into urea synthesis reactor |
2013 |
|
Acron, Veliky Novgorod, Russia |
Urea production units (1-4) revamping aimed to capacity increase up to 2000 TPD and feedstock/energy saving |
- Equipment procurement |
2016 |
|
Azot, Cherkassy, Ukraine |
Design and procurement of HP stripper pos. E-201 with capacity increase up to 1500 tpd (urea plants M-2) |
- HP stripper design and procurement |
2011-2012 |
|
Azot, Kemerovo, Russia |
Urea production unit revamping with high speed drum granulator installation |
- Equipment procurement |
2011-2013 |
|
Acron, Veliky Novgorod, Russia |
Evaporation system for urea production unit and prilling tower modernization with capacity increase |
- Equipment procurement |
2011-2013 |
|
Maxam-Chirchik, Chirchik, Uzbekistan |
Modernization and technical upgrading of urea unit |
- Equipment procurement - Commissioning |
2010-2012 |
|
UralChem, Azot, Berezniki, Russia |
Urea synthesis reactor modernization |
- Set of Internal Devices procurement - Field supervision |
2010 |
|
Salavatnefteorgsintez Salavat, Russia |
Prilling towers’ modernization for urea plant №24 |
- Equipment procurement - Commissioning |
2009-2010 |
|
PhosAgro Cherepovets, Russia |
Prilling tower for urea production (capacity of 1500 TPD) |
- Equipment procurement |
2008-2012 |
|
Acron, Veliky Novgorod, Russia |
Urea unit №5 on the basis of relocated unit |
- Equipment procurement |
2007–2011 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Revamp of urea plant №3 with capacity increase to 2000 TPD |
- Material procurement |
2007–2010 |
|
Severodonetsk Azot Association, Severodonetsk, Ukraine |
Urea unit revamp with capacity increase from 1200 up to 1500 TPD |
- Equipment procurement |
2007–2010 |
|
EuroChem, NevAzot , Nevinnomyssk, Russia |
Urea evaporation unit for melamine plant |
- Equipment procurement |
2008 – 2010 |
|
KuibyshevAzot, Togliatti, Russia |
Revamp of urea unit with capacity increase |
- Equipment procurement - Field supervision |
2007–2008 |
|
Severodonetsk Azot Association, Severodonetsk, Ukraine |
Urea unit revamp with capacity increase from 1000 up to 1200 TPD |
- Equipment procurement |
2006-2007 |
|
PhosAgro, Cherepovets, Russia |
Revamping of distillation unit with capacity increase (urea production plant) |
- Equipment procurement |
2007 |
|
Salavatnefteorgsintez Salavat, Russia |
Revamping of urea plant №50 |
- Equipment procurement |
2006 –2008 |
|
Azot, Kemerovo, Russia |
Revamp of urea synthesis unit |
- Procurement of internals into reactor pos. R-101 |
2006 |
|
Grodno Azot, Grodno, Belarus |
Revamp of urea production unit, installation of recuperator |
- Equipment procurement - Field supervision |
2006 |
|
Acron, Veliky Novgorod, Russia |
Installation of the 5th urea synthesis reactor |
- Equipment procurement |
2006 |
|
NevAzot, Nevinnomyssk, Russia |
Revamping of urea production plant №2 |
- Equipment procurement - Field supervision |
2006 |
|
Azot, Kemerovo, Russia |
Revamp of urea synthesis unit |
- Procurement of internals into reactor pos. R-101 - Field supervision |
2006 |
|
For ammonia nitrate production unit |
||||
KazAzot, Aktau, Kazakhstan |
Ammonia nitrate production unit modernization: HSDG for ammonia nitrate manufacturing |
- Equipment procurement |
2011-2012 |
|
For warehouses |
||||
Pervouralsky novotrubny works, Perovuralsk, Russia |
Revamp of liquid ammonia storage unit № 33 |
- Equipment procurement |
2006-2007 |
|
Zawolzhsky Motorny Zawod, Zavolshye, Russia |
Revamp of sulphuric acid storage unit |
- Turnkey project |
2006-2007 |
|
Petrol storage unit |
- Turnkey project |
2006 |
||
Nizhegorodsky machine-building plant, Russia |
Revamping of chlorine storage unit and chlorinator |
- Turnkey project |
2006-2007 |
|
For other facilities |
||||
Not disclosed (Confidential information) | Installation of the hydro foamy filtration system (wet scrubbing) | - Equipment procurement | 2019 | |
QAFCO (Qatar Fertilizer Company), Qatar |
Multipurpose High Speed Drum Granulation (HSDG) Pilot Plant for production of Granulated Urea with additives, capacity 100 kg per hour |
- Equipment procurement - Field supervision, - Commissioning |
2014-2015 |
|
PVFCCо, Phu My I, Ba Ria Vung Tau, Vietnam |
HSDG unit for production of compound fertilizers (capacity 100 kg/h) |
- Equipment procurement - Field supervision - Commissioning |
2014-2015 |
|
Zawolzhsky Motorny Zawod, Zavolshye, Russia |
Project development and construction of testing station for diesel engines |
- Turnkey project |
2009 |
|
For equipment repairing |
||||
EuroChem, NevAzot, Nevinnomyssk, Russia | Repair of cylindrical section of the lining of synthesis reactor pos. 6/1 (urea plant 2) | - Equipment procurement | Under development | |
Meleuz mineral fertilizers, Meleuz, Russia |
Replacement of old tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit AS-72М) |
- Metal structures procurement for repairing works |
2017 |
|
Grodno Azot, Grodno, Belarus |
Repair of the lining of the synthesis reactor manhole (pos. R-201, urea plant №3) |
- Metal structures procurement for repairing works |
2017 |
|
Egyptian Fertilizers Company (EFC), El Ain Sukhna, Egypt |
Relining of urea reactor 322-R-00 (Urea Plant EFC-1 Suez Fertilizers Co.) |
- Metal structures procurement for repairing works |
2016 |
|
Meleuz mineral fertilizers, Meleuz, Russia |
Replacement of old tubes of evaporation unit (pos.Т-10, ammonium nitrate production unit) |
- Equipment procurement |
2015 |
|
Grodno Azot, Grodno, Belarus |
Repair of two lining belts (urea synthesis reactor pos. R-201, urea plant №3) |
- Metal structures procurement for repairing works |
2014 |
|
Corrosion inspection of urea synthesis reactor (urea plant №4) |
- Metal structures procurement for repairing works |
2013 |
||
Azot, Kemerovo, Russia |
Synthesis reactor repair support services |
- Metal structures procurement for repairing works |
2013 |
|
Concern Stirol, Gorlovka, Ukraine |
Complex repair of synthesis reactor pos. R-901 (urea plant, location1) |
- Metal structures procurement for repairing works |
2012-2013 |
|
Acron, Veliky Novgorod, Russia |
Lining replacement of synthesis reactor pos. 6/4 (urea plant) |
- Metal structures procurement for repairing works |
2012-2013 |
|
UralChem, Azot, Berezniki, Russia |
Repair of cylindrical section of the lining of synthesis reactor pos. R-901 (urea plant) |
- Metal structures procurement for repairing works |
2012 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Repair of two lining belts in urea reactor (urea plant 2А) |
- Metal structures procurement for repairing works |
2011 |
|
Acron, Veliky Novgorod, Russia |
Set of internal devices installation into urea plant reactor №5 |
- Metal structures procurement for repairing works |
2011 |
|
Technical guidance for relining of urea synthesis reactor pos. 6/2 of urea plant |
- Metal structures procurement for repairing works |
2011 |
||
Azot, Cherkassy, Ukraine |
Relining of upper part of urea synthesis reactor (plant M-2) |
- Metal structures procurement for repairing works |
2010 |
|
EuroChem, NAK Azot, Novomoskovsk, Russia |
Technical guidance of partial relining of synthesis reactor 6/2 |
- Metal structures procurement for repairing works |
2010 |
|
EuroChem, NevAzot, Nevinnomyssk, Russia |
Repair of two lining belts (urea reactor) |
- Supervising manufacturing of material |
2007 |
|
Kuibyshev Azot, Togliatti, Russia |
Revamping of urea storage unit |
- Field supervision - Commissioning works |
2007 |
|
Fertalge Industries SPA, Algeria |
Prilling tower for urea production |
- Field supervision |
2002-2005 |