References on ammonia

Video Видео
Our Listings

Projects of Previous Years

Customer
Project
Scope of services of NIIK
Year
LLC Zhilevskaya kremniorganika, Sitne-shchelkanovo, Moscow region, Russia  Ammonia-urea complex Feasibility study     2016
Metafrax, Gubakha, Russia Ammonia-urea-melamine complex Reviewing options for site location, development of declaration of intention, preenvironmental impact assessment, participation in public hearings, detail design for site preparation, adaptation of Casale basic engineering package to Russian norms and regulations, authority package development, development of basic design for prilling tower , raw water treatment unit (including water intake unit) and waste water treatment system, equipment procurement for prilling tower construction. 2015 - Under development
ShchekinoAzot, Shchekino, Russia Methanol production unit Reviewing options for unit location at ammonia, urea and supfuric acid production complex site 2016
Haldor Topsoe (HTAS)
Ammonia unit modernization aimed at capacity increase up to 2000 TPD at Uralchem site, Kirovo-Chepetsk, Kirov region 
1) Adaptation of HTAS design basis with the requirements of Russian Federation
2) Development of Authority Package including project's costs estimation
3) CO2 removal engineering package based on HTAS specification
Under development

ShchekinoAzot, Shchekino, Russia
Ammonia-urea complex  
Development of declaration of intention
Under development

Sulphuric acid production plant and ammon-a- urea production complex at ShchekinoAzot site.  
Feasibility study to assess production site location
2015
Grodno Azot, Grodno,
Belarus
Nitrogen complex (ammonia-urea-hydrogen)  
Feasibility study
2015
Tulagiprohim, Tula,
Russia
Ammonia production unit, liquid ammonia storage unit for Ammonia Kingisepp Plant  
Basic design development for ammonia production plant: central control station, service- and- office building; for liquid ammonia storage facility: central station, laboratory, service- and- office building.
2014-2015
Rosstroy,
Novocherkassk, Russia
Ammonia-urea complex  
Feasibility study
2014
PhosAgro,
Cherepovets,
Russia
Construction of ammonia production unit AM-3 (capacity  2200 TPD)
Environmental Impact Assessment (front-end engineering stage), development of basic and detailed design (сivil engineering stage),  harmonization of the documentation with the  requirements of  Russian Federation, field supervision
2013
NevAzot (EuroChem), Nevinnomyssk, Russia
Commercial grade aqua ammonia production  unit  for plant № 11
Basic and detailed design
2013-2014
National Chemical Company, Russia
Gaz -chemical complex (Kozmino, Primorsky territory)
Declaration of intention development;
Environmental Impact Assessment (front-end engineering stage);
Declaration  compliance with local codes,  authority permits and approval;
Participation in public hearings,  customer support
2013
ICM,
Saint-Petersburg,
Russia
 Ammonia – granulated urea  complex  based on  natural gas, including utility corridor to port
Declaration of intention development; BE and FEED stages technical support (harmonization of the documentation developed by foreign companies with the  requirements of  Russian Federation),   environmental impact investigation (design basis stage), development of basic and detailed design
2012-2014
Minudobreniya,  Rossosh,
Russia
Ammonia-urea complex
Feasibility study
2012
Ammonia-Methanol- Urea complex   (Tatarstan, Russia)
Mitsubishi Heavy Industries,
Japan
 
Architectural  and civil   documentation of urea production units and adjoining processing facilities
Under development
Ammoni,
Mendeleevsk,
Russia
 
Harmonization of the documentation developed by foreign companies with the  requirements of  Russian Federation, equipment delivery, equipment certification (including foreign contractors equipment)
 
Under development
 
Ammoni,
Mendeleevsk,
Russia
Ammonia- Methanol- Urea complex, Tatarstan, Russia
Off- plant facilities construction (ammonia, urea, methanol, acid, alkalis  storage units; loading/ unloading racks; waste-treatment facilities; demineralized water units, water recycling units, service- and- office buildings,  substations, high- voltage transmission line (110 kW), automatic process control system, railroad, flare devices etc)
Off plant facilities: turnkey construction projects including  engineering,  equipment delivery,  construction and erection works, commissioning operations, operational documentation  development, supervision etc.
Under development
 
ShchekinoAzot,
Shchekino, Russia
Ammonia-urea complex
Feasibility study
2011
Ammoni, Mendeleevsk, Russia
 Ammonia-methanol-urea chemical complex
Development of basic design for urea plant.
2008–2009
Diagnostics of HP urea equipment and pipelines.
Repair of urea production equipment
Grodno Azot,
Grodno,  Belarus
Inspection of absorber  ferromagnetic heat exchanger tubes (ammonia  plant № 4)
Inspection of heat- exchanger  tubes by eddy-current method, visual inspection
2013
Azot, Cherkassy,
Ukraine
 Ferromagnetic heat- exchanger tubes inspection (pos. 1140-C, ammonia plant A-5)
Inspection of heat- exchanger  tubes by eddy-current method, visual inspection
2012
Urea and other products storage units
Balakovo Mineral Fertilisers,
Balakovo, Russia
Grass-root above-ground ammonia storage unit
Feasibility study according to alternative variants
2010
Other works
AutoVAZ,
Togliatti,
Russia
Technical upgrading of liquid ammonia evaporation unit
Development of basic and detailed design, industrial safety expertise, development of emergency localization plans and adjustment of current regulations
2010